Module Type Mobile Concrete Batching Plant 80m3/h hiqh quality
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Apply to the mixers
MBP series batching plants apply to the following mixers: twin-shaft mixer JS1500/1000, JS2250/1500, JS3000/2000, or planetary mixer MP1500/1000, MP2250/1500.
Weighing system
The weighing of water, aggregates and cement takes place separately, simultaneously and with autonomous and independent phases through load cells applied to supports that ensure the biggest
Additives can be loaded together with water.
Aggregates storage
The aggregate storage capacity is from 50 m3 to 100m3
The mixing group
The mixing group is the heart of the MBP batching plant : the MP planetary mixer and the JS twin-shaft mixer can mix various types of top quality concretes with continuous process control.
Pre- wiring
The MBP series batching plant is completely pre-wired in order to meeting the requirements of speed, versatility and compactness. This operating solution sensibly reduces the plant installation and commissioning times.
control cabin
The control cabins is connected with the main frame work together. Control panel is installed in the cabin. All the equipment is trial run before delivered. It needn’t disconnect and connect the cables
The compressor is connected with the main framework together also. It needn’t disconnect and connect when they are transported.
Feeder skip
The skip, fitted with a gravity discharge gate, rests on a rail along which a weighing system is installed. Through this device, the aggregates are weighed and transported into the mixer.
Control system
Co-nele control system is the ideal means to automate the standard operation of the concrete batching plants. His architecture is flexible, versatile and structured mainly for the operating management of the process of ready-mix concrete. Thanks to a friendly-user interface, the system can be utilized with utmost simplicity by non-qualified personnel. The aim is to enable the operator to autonomously manage the whole plant with the utmost safety. The personalized configuration and the operating automation together with the economy of the Co-nele control system allow to meet the customer’s specific requirements in reducing times.
Configuration
The hardware standard configuration includes high precision batching meters, management and monitoring system (PLC), an operator terminal with functional keyboard and LCD display, an application-oriented/operating software available in English and Chinese languages, on request, a printer.
Technical data of the mobile concrete batching plant
Item | Type | |||||
MBP08 | MBP10 | MBP15 | MBP20 | |||
Output(theoretical) | m3/h | 30 | 40 | 60 | 80 | |
Discharging Height | mm | 4000 | 4000 | 4000 | 4000 | |
Mixer Unit | Dry filling | L | 1125 | 1500 | 2250 | 3000 |
Output | L | 750 | 1000 | 1500 | 2000 | |
Mixing power | kw | 30 | 37 | 30*2 | 37*2 | |
weighing and feeder skip | Drive power | kw | 11 | 18.5 | 22 | 37 |
Medium speed | m/s | 0.5 | 0.5 | 0.5 | 0.5 | |
Capacity | L | 1125 | 1500 | 2250 | 3000 | |
Weighing precision | % | ±2 | ±2 | ±2 | ±2 | |
Cement weighing system | Capacity | L | 325 | 425 | 625 | 850 |
Weighing precision | % | ±1 | ±1 | ±1 | ±1 | |
Liquid weighing systemS | Capacity | L | 165 | 220 | 330 | 440 |
Water weighing precision | % | ±1 | ±1 | ±1 | ±1 | |
Admixture weighing precision | % | ±2 | ±2 | ±2 | ±2 | |
Cement screw conveyor | External | mm | Φ168 | Φ219 | Φ219 | Φ273 |
Speed | t/h | 20 | 35 | 35 | 60 | |
Power | kw | 5.5 | 7.5 | 7.5 | 11 | |
Control mode | Automatic | Automatic | Automatic | Automatic | ||
Power | kw | 53 | 69 | 97 | 129 | |
Weight | T | 15 | 18 | 22 | 30 |
Packaging & Shipping
We take customer's requirement as our needed. Meet all requirements is our final goal. Your mixer can be designed and safely shipped to your place on time
- Q:For example, what is the more detailed and better td-50 td-80 td-60
- Concrete mixer points generally mixer and forced mixer, currently used in engineering is forced, the difference is that the former is the shell in turn, the latter is in inside agitation. The most commonly used parts of a strong mixer are: hoisting bucket wheel, mixing arm, blade, hopper limiter, liner. Normally the mixing arm, blade, and lining plate for the vulnerable parts, should be replaced in time during construction.
- Q:The difference between concrete mixer and concrete mixer
- Concrete mixing plant is including weighing, feeding and a series of complete system of equipment, and concrete mixer is a mechanical stirring mixer belongs to a kind of mixing equipment. The mixing machine in the mixing station is a strong mixer in the concrete mixer, so it is fair to say that the mixer is a member of the whole equipment of the mixing station. No matter which of the two devices during start-up operation, safe operation, must pay attention to the hopper should ensure reliable braking at any position, hopper should not fall; The movement of the upper and lower limit devices should be sensitive and reliable. The safety cover of the open gear and belt should be complete and intact, and the safety pins and safety pins of the hopper safety hook and track should be in good condition and complete. The leakage protector parameter should match, the installation should be correct, the action should be sensitive and reliable. Belong to the mixing machine, concrete mixer and concrete mixing station their application field the same, only choose the appropriate mixing plant equipment according to user's demand
- Q:250 litres of the blender once made concrete
- 250-litre agitator is measured at a time of 0.25 m3, which is about 80% of the amount in real time, avoiding mixing and mixing
- Q:How long will it take for a concrete mixer to beat ten square?
- The first set of 10 square is 120, and the first set of 2 squares is calculated from the above, and the time is saved by 4 minutes in 4 minutes, the average of 15 minutes is calculated by C50 high performance concrete. If it's a C20 no water reducer, just five minutes!
- Q:Concrete mixers need to be aware of which things
- Prior to the use of the new machine, the requirements of the manual of the concrete mixer shall be conducted according to the instructions of the concrete mixer, and the test and the necessary trial operation shall be conducted for each system and the parts. Running in the empty car, checking the rotation direction of the mixer or stirring leaves, the operation of each work unit, the brake, the confirmation of normal, the operation. Fixed concrete mixer should be installed on a strong pedestal. When used in the long term, the ground bolts shall be buried; If used in the short term, you can lay the sleeper and stabilize the sleeper. For mobile concrete mixer, it should be installed on flat and hard floor with square or supporting frame, and hold water flat tire. If more than three months should be used, the tire should be removed properly and the shaft end should be cleaned and rusted. For some mixers that need to be excavated, the ground of the pit should be strengthened to prevent the surface water from entering the pit. The bottom end of the material rail frame should be rammed or laid, and the back of the frame shall be supported by wood to prevent the deformation of the track during work. After the concrete mixer has been started, the mixing drum should be made up after normal speed and after loading, it should be added to the water in time. The new material must be removed before it can be removed. Do not start the blender when the load is stopped or full load, except for the reverser.
- Q:How many square concrete can be produced in an hour of concrete mixer
- One hour of theoretical productivity is 50, which is actually about 40. Because it takes time to get into the car and get out of the car, it's not a matter of machine production.
- Q:Can you stir the mortar in a concrete mixer?
- Vertical shaft concrete mixer can be mixed with mortar. Self-falling concrete mixer is not suitable to mix mortar, especially the mortar with large flow.
- Q:How is the concrete mixer cleaned
- The concrete mixer should pay attention to the following matters: 1, concrete mixer cleaning considerations: Maintain and maintain the maintenance procedure, such as cleaning, lubrication and oil. 2 concrete mixers cleaning attention item two: Concrete mixer start to check all controllers are in good condition, before the shutdown after water and rocks into the mixing barrel within 10 ~ 15 minutes for cleaning, water and Shi Ziqing out again. When the operator is required to go inside the mixer, remove the power supply and remove the fuse and lock the switch box. 3 concrete mixer cleaning considerations: It is forbidden to use sledgehammer to remove concrete from the concrete bowl and only use chisels to remove it. 4, the concrete mixer cleaning attention item 4: After working in the cold season, water cleaning mixer drum and put water accumulation in the water pump, water tank, pipe net, in order to avoid water pump, water tank, pipe freezing, etc.
- Q:What is the difference between a concrete mixer, a JL type and a JW type?
- The jw-375 concrete mixer is a turbo-reinforced concrete mixer, which is used for hard and semi-dry concrete. The main body of this mixer consists of the frame, the feeding system, the mixing system, the water supply system, the control device and the transmission mechanism.
- Q:The safe distance of the concrete mixer
- 1. The correct use of 1) to ensure the mixing quality of the mixture, it must be the gravel, sand and cement to be accurate. Before stirring, adjust the position of the pointer on the water tank indicator to control the amount of water. The mixing time should be strictly controlled, and the hopper discharge should be clean, otherwise it will affect the mix of the next mixture. 2) when loading in the feed hopper, should pay attention to the loading sequence, namely the rubble next, cement, sand, in the hopper rises so does not cause cement float in the sky. When the work is finished, pour some gravel or sand into the mixing drum, stirring up 10min. Otherwise, it will be difficult to clear after the rest of the drum solidifies.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Module Type Mobile Concrete Batching Plant 80m3/h hiqh quality
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords