• Putzmeister Flap Elbow DN180-150 System 1
  • Putzmeister Flap Elbow DN180-150 System 2
  • Putzmeister Flap Elbow DN180-150 System 3
Putzmeister Flap Elbow DN180-150

Putzmeister Flap Elbow DN180-150

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
-
Supply Capability:
5000PCS pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: Concrete Pump Elbow DN180-150 PM Type

1. Specification of Concrete Pump Elbow DN180-150

     Materials: High Manganese casting mn13-4

     Concrete Pumping Capacity: about 40, 000M3

     Degree: 90°

     Standards: ASTM A128-C

Notes: total series of concrete pump elbows for different brand concrete pump(PUTZMEISTER, SCHWING, CIFA, SANY, ZOOMLION, IHI, KYOKUTO Etc)available from us, including 10 degree, 15 degree, 30 degree, 45 degree, 90 degree, and other casting hopper elbows.

2.  Application of Concrete Pump Elbow

     Widely used on concrete pump truck, concrete placing boom, trailer concrete pump etc, for concrete delivery direction change.

     Our concrete pump elbows have been successfully exported to many countries from 1998, Our main markets as below: Middle East, Southeast Asia, America, Brazil, Italy, Russia, South Africa etc

      Aiming at the largest concrete pump parts manufacturer, and reliable, professional supplier in China, we can supply concrete pump elbows, delivery pipes, casting or forging couplings, end rubber hoses, rubber pistons, tungsten wear plates, delivery cylinders, and other hydraulic parts, one stop service for your concrete pump parts and accessory business.

3.   Package and Delivery of Concrete Pump Elbow

Every 60pcs put in one seaworthy wooden box, and 20 boxes in one 20feet container.

Optional wood materials: veneer wood or other wood.

4.   Production of Concrete Pump Elbow

Our Concrete Pump Elbows are made with advanced technology of Precision Investment Casting of WAX- RELEASE, through the process of Wax Molding, Wax-release, Baking, Casting, Polishing, and Heat Treatment. Etc.

 

 concrete pump elbow package   concrete pump elbow delivery

5.  Primary Competitive Advantages

1) Brand-name Parts

2) Country of Origin

3) Competitive Price

4) Good Product Performance

5) Prompt Delivery

6) Quality Approvals

7) Good Reputation

8) Expedite Communication

9) Good Packaging

10) Distributorships Offered

11) One Step Service

12) Good Quality Service

13) Small Orders Accepted

14) Overseas Service Branches

Q: Where can a concrete mixer be used?
Tile is widely used in home outfit sand, sand pavement tiles grey ash stirring, the botanical garden engineering sand ash mixing, floor concrete mixer, small site masonry mortar and plaster mortar mixing sand dust, electricity, communications and other field operations, seedling fertilizer mixing, family wine could stir scenario. Small mixer is widely used in municipal engineering, small water conservancy projects, rural construction, building decoration, electrical, communications engineering, mountains of bad environment, leisure agriculture, scarification, weeding, etc.
Q: How long will it take for a concrete mixer to beat ten square?
Hello there is no type 120 concrete mixer According to what you say, may be 120 type concrete mixing plant, is a set of concrete mixing equipment, including concrete mixer, concrete mixer, cement silo, screw conveyor, etc. There is a slight difference in the production of different manufacturers. I only know that the total power of the 120 stations in zhengzhou is 179.5 kw/h.
Q: A concrete mixer can last for years
Are now commonly commercial concrete mixing plant mixing unit, use fixed number of year of the requirements, without proclaimed in writing if repair, maintenance and so on is good, can satisfy the production requirement, fixed number of year can reach more than 10 years.
Q: How many tiles are in the concrete mixer on the site
The power of the mixer motor on the site is 75KW
Q: Concrete mixers need to be aware of which things
The concrete mixer should be set in a flat position, and the wheel shaft will be placed on the back and back of the square, so that the tyre should be set up so that it will not move during the run. 2, the concrete mixer should be protected by secondary leakage, and after the power connection is put on before work, it must be carefully checked, and it will be used only if it is considered qualified by the empty car test. Commissioning should check when mixing drum speed whether appropriate, under normal circumstances, the proportion of empty car speed car was faster (after loading) 2 ~ 3, such as the difference is more, should adjust pulley and the proportion of the driving wheel. The rotating direction of the mixing cylinder shall be in accordance with the direction of the direction of the arrow, if it is not true, the motor connection shall be corrected. 4, check whether the transmission clutch and brake is flexible and reliable, wire rope is damaged, track pulley are in good condition, surrounded by accessibility and lubrication situation of each part. After turning on the machine, it is often noted that the parts of the concrete mixer are working properly. When stop, check whether the concrete mixer blade is bent and the screw is loose or not. 6, when the completion of concrete mixing or pause is expected to more than 1 h, besides excess stock out of the net, the application of stones and water to pour into shaking inside the cylinder, turn on, put the glue on the cylinder of the mortar all discharged after rinse. No water is allowed in the cylinder in case the cylinder and blade are rusted. It should also clean up the outside of the mixing cylinder to keep the machine clean. 7, after work and stop after work, should pull off power without power, and lock switch box, to assure safety.
Q: The safe distance of the concrete mixer
1. The correct use of 1) to ensure the mixing quality of the mixture, it must be the gravel, sand and cement to be accurate. Before stirring, adjust the position of the pointer on the water tank indicator to control the amount of water. The mixing time should be strictly controlled, and the hopper discharge should be clean, otherwise it will affect the mix of the next mixture. 2) when loading in the feed hopper, should pay attention to the loading sequence, namely the rubble next, cement, sand, in the hopper rises so does not cause cement float in the sky. When the work is finished, pour some gravel or sand into the mixing drum, stirring up 10min. Otherwise, it will be difficult to clear after the rest of the drum solidifies.
Q: Operation procedure of concrete mixer
Safety procedure of concrete mixer A blender must be placed in a solid place, secured with a bracket or a leg holder, and no tires should be replaced. Before starting the mixer, the clutch, brake, wire rope and so on should be checked, and no foreign material in the roller. When the hopper is hoisted, no one shall pass or stay in the hopper, and the hopper shall be fixed after the work is completed. When running, it is strictly forbidden to put the tool into the roller. It is strictly forbidden to leave the work station without any evidence of operation or operation. When repairing, should fix the hopper, cut off the power supply. After the work is finished, should clean the fuselage concrete, do the lubrication to maintain, cut off the power to lock the door.
Q: How much concrete the concrete mixer can stir at a time
350-concrete mixer is a double conical turning out of the feed mixer, and the plastic and semi-dry hard concrete of 60 mm. Stirring when the mixer is turning, and automatically when reversing. Each can be mixed with concrete 0.35 cubic meters. Depending on the size of the concrete, the amount of cement used varies.
Q: What is the JZ250 concrete mixer
Jzc250 introduction 1) the discharging capacity of 250 l 2) feed capacity of 350l 3) productivity 7-10 m3 / h 4) mixer cylinder speed 17 r/min 5) the maximum size of the aggregates is 60mm 6) the accuracy of water accuracy is less than 2% error 7) stir the motor 4 kw 8) pump motor 0.55 kw 9) maximum drag speed 115km/h 10) dimensions (x width x height) 2226x1990x2750mm 11) the weight 1950 kg1650kg1500kg
Q: 250 litres of the blender once made concrete
250-liter blender once gives 200 to 220 litres of concrete. 250 litres of time the amount of concrete mixer quantitative is 250 litres, but is usually not meet this standard, because in the process of mixing concrete appear adhesion or water loss, so the volume will narrow. The actual quantity is approximately 80% of the quantity. A concrete mixer is a machine that mixes cement, gravel and water into concrete mixtures. It consists mainly of mixing, loading and unloading mechanism, water supply system, original motive, transmission mechanism, frame and supporting device.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords