• concrete mixer truck System 1
  • concrete mixer truck System 2
concrete mixer truck

concrete mixer truck

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
1000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Model: CLY5149GJB

Overall size (mm)

7450(L)* 2500(W)*3600 (H)

Tank body dimension(mm)

3300*2000

Wheel base (mm)

3800

Tread f/r (mm)

1430/2220

Max. Speed (km/h)

90

Chassis

Manufacturer

Dongfeng motor

Model

DFL1140B1

Steering system

recirculating ball-type steering, 3401010-KC100

Transmission

Manual, DF6S900

Brake system

Dual circuit air-pressure  braking system

High pressure oil pump

ARK pump

Hydraulic motor

ARK motor

Reducer

TOP P58

Water supply system

Water supply by air pressure (450L water tank),  homemade sprinkler.

Air-condition

Dongfeng  special air condition

Engine

Model

Dongfeng  Cummins engine, ISDe210 30, Euro 3

Max. Power (hp)

210

Engine type

L6,water-cooled, supercharged  inter-cooling diesel engine

Fuel type

Diesel oil

Tank body parameter

Mixing volume(m3)

4

Feeding speed

More than or equal to 3m3/min

Unloading speed

More than or equal to 2m3/min

Discharge residue rate

Less than 0.5%


Q:How the concrete mixer works
The concrete mixer can be divided into two categories: self-fall and strong. Self-falling concrete mixer is suitable for mixing plastic concrete. The stirring effect of a strong mixer is stronger than that of the falling mixer, which is suitable for mixing hard concrete and lightweight aggregate concrete. A concrete mixer is a machine that stirs a certain mix of sand, stone, cement and water into a uniform quality concrete that meets the quality requirements. The concrete mixer can be divided into two categories: self-fall and strong.
Q:How to safely use concrete mixer
Concrete mixer operation method: 1. The concrete mixer should be placed in a firm place, with the support of the bracket or the support of the foot barrel, and cannot be supported by the tyre. Before the concrete mixer starts, check whether the controller is good. When the concrete mixer is hoisted in the hopper, it is strictly forbidden to pass or stop by the hopper and set up the mixer after the work is completed. When the concrete mixer is running, it is strictly forbidden to put the tools in the roller, and pay more attention to safety. When the concrete mixer is on site, it should be fixed in the mixer, cut off the power supply, and when it enters the mixer cylinder, the outside must be monitored. (the operator of the concrete mixer (driver) must be trained in safety technical training, qualified for examination, and will be held on the certificate and strictly prohibit non-driver operation. The concrete mixer must clean the inside, especially in the winter, which can prolong the service life by using no foreign material in the front roller.
Q:How many tiles are in the concrete mixer on the site
The type of concrete mixer on the site is different, the power is different. The type of concrete mixer is normally divided by the amount of material, such as the JS500, which indicates the amount of material 500L. A concrete mixer usually has three electric motors: stirring motor, winding motor, pump motor. The following is the power of the blender: The amount of material is 350L, general power of 19.55 KW. The output is 500L, the mixer power is 18.5 KW, the hoist power 5.5 KW, the power of the pump is 750W, the total power is 24.75 KW. Output of 750L, mixer power 30KW, hoist power 7.5 KW, pump power 1.1 KW, total power 38.6 KW; Output 1000L, mixer power 37KW, hoist power 11KW, pump power 3KW, total power 51KW; Output of 1500L, mixer power 45KW, hoist power 18.5 KW, water pump power 3KW, total power 66.5 KW. The output is 2000L, the machine power is 75KW, the power of the hoist is 22KW, the power of the pump is 4KW, the total power is 101KW.
Q:For example, what is the more detailed and better td-50 td-80 td-60
That's right, tipping over, tdcm125-6d Turn out the material JZC350 (rdcm350-6e, rdcm350-8eh, rdcm350-11e), JZC500, JZR750, JZR1000 Forced JS500, JS750
Q:How many cubic meters of concrete is mixed with concrete mixer?
The 1000 type 1 square 2000 type 2 square 3000 3 square
Q:What is the difference between a concrete mixer and a mortar mixer
The mortar mixer should be smaller! No different
Q:Concrete mixers need to be aware of which things
The concrete mixer should be set in a flat position, and the wheel shaft will be placed on the back and back of the square, so that the tyre should be set up so that it will not move during the run. 2, the concrete mixer should be protected by secondary leakage, and after the power connection is put on before work, it must be carefully checked, and it will be used only if it is considered qualified by the empty car test. Commissioning should check when mixing drum speed whether appropriate, under normal circumstances, the proportion of empty car speed car was faster (after loading) 2 ~ 3, such as the difference is more, should adjust pulley and the proportion of the driving wheel. The rotating direction of the mixing cylinder shall be in accordance with the direction of the direction of the arrow, if it is not true, the motor connection shall be corrected. 4, check whether the transmission clutch and brake is flexible and reliable, wire rope is damaged, track pulley are in good condition, surrounded by accessibility and lubrication situation of each part. After turning on the machine, it is often noted that the parts of the concrete mixer are working properly. When stop, check whether the concrete mixer blade is bent and the screw is loose or not. 6, when the completion of concrete mixing or pause is expected to more than 1 h, besides excess stock out of the net, the application of stones and water to pour into shaking inside the cylinder, turn on, put the glue on the cylinder of the mortar all discharged after rinse. No water is allowed in the cylinder in case the cylinder and blade are rusted. It should also clean up the outside of the mixing cylinder to keep the machine clean. 7, after work and stop after work, should pull off power without power, and lock switch box, to assure safety.
Q:What is the JZ250 concrete mixer
JZC concrete mixer JZC concrete mixer series since the fall type double reverse discharging cone mixer, mixing barrel by the ring gear transmission, the mixing work forward, reverse discharging, plastic and half dry concrete mixing, apply to the general construction sites, road, bridge engineering and various kinds of concrete file.
Q:Operation procedure of concrete mixer
Before stirring, the car should be run in an empty car. Adjust the timing of the relay according to the stirring time. Water moistening the mixing bowl and the blade and the ground. The process, such as electrical or mechanical fault, should be discharged from the part of the mixing material, lighten the load, remove the fault and then drive again. When operating, the operation should be checked regularly to prevent safety accidents such as electrocution and mechanical injury. Finish the experiment, turn off the power supply, clean the mixing drum and the ground and clean up the cleaning.
Q:How is the concrete mixer cleaned
The concrete mixer should pay attention to the following matters: 1, concrete mixer cleaning considerations: Maintain and maintain the maintenance procedure, such as cleaning, lubrication and oil. 2 concrete mixers cleaning attention item two: Concrete mixer start to check all controllers are in good condition, before the shutdown after water and rocks into the mixing barrel within 10 ~ 15 minutes for cleaning, water and Shi Ziqing out again. When the operator is required to go inside the mixer, remove the power supply and remove the fuse and lock the switch box. 3 concrete mixer cleaning considerations: It is forbidden to use sledgehammer to remove concrete from the concrete bowl and only use chisels to remove it. 4, the concrete mixer cleaning attention item 4: After working in the cold season, water cleaning mixer drum and put water accumulation in the water pump, water tank, pipe net, in order to avoid water pump, water tank, pipe freezing, etc.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords