Modular concrete mixing plant,Accurate dosage system, ensuring concrete quality
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
The modular concrete mixing plant is developed by NFLG on the base of absorbing latest technology achievement and applying rich experience of NFLG in the field of concrete mixing plant. It’s suitable to be used in bridge, road, dam, airport and other big scale construction project.
1. Brief introduction
The modular concrete mixing plant is developed by NFLG on the base of absorbing latest technology achievement and applying rich experience of NFLG in the field of concrete mixing plant. It’s suitable to be used in bridge, road, dam, airport and other big scale construction project.
2. Characteristics
1) Modular design, convenient to relocate and transfer, it takes just5-7 days to complete installation;
2) Compact structure, requires little land;
3) Completely mobile steel structure foundation;
4) Accurate dosage system, ensuring concrete quality;
5) Intelligent management system, easy to operate;
6) Green and environment friendly, fully enclosed structure, effectively controls dust and noise pollution.
Modular concrete mixing plant | |||||||
---|---|---|---|---|---|---|---|
Model | HZS50 | HZS75 | HZS100 | HZS150 | HZS200 | ||
Productivity | 50 | 75 | 100 | 150 | 200 | ||
Mixer | Model | JS1000 | JS1500 | JS2000 | JS3000 | JS4000 | |
Power(Kw) | 2×22 | 2×30 | 2×37 | 2×55 | 2×75 | ||
Output(m3) | 1 | 1.5 | 2 | 3 | 4 | ||
Aggregate Size(mm) | ≤80 | ≤100 | ≤120 | ≤150 | ≤150 | ||
Capacity(m3) | 15 | 15 | 15 | 15 | 20 | ||
Distribution bin | Number | 3 | 3 | 3 | 4 | 4 | |
Belt conveyor capacity(m3/h) | 400 | 500 | 400 | 600 | 600 | ||
Weighing range and tolerance | Aggregate scale | 2500±2% | 3500±2% | 4500±2% | 6500±2% | 4×4800±2% | |
Cement scale | 600±1% | 900±1% | 1200±1% | 1800±1% | 2400±1% | ||
Fly ash scale | 200±1% | 300±1% | 400±1% | 600±1% | 800±1% | ||
Water scale | 300±1% | 400±1% | 500±1% | 700±1% | 900±1% | ||
Additive scale | 30±1% | 30±1% | 30±1% | 80±1% | 80±1% | ||
Total power | 155 | 195 | 250 | 255 | 330 | ||
Discharge height | 4 | 4.2 | 4.2 | 4.2 | 4.2 |
Note:
1. Total power doesn’t include that of screw.
2. Number of bin may be changed in accordance with design requirements
3. Mentioned above parameters may be alerted, please refer to actual product.
- Q: Why does it say do not use before work with heavy machinery on the back of childrens tylenol?
- It's a waste of ink. Acetaminophen does not cause any drowsiness. If it is Tylenol PM, then the answer is simple - it's a precautionary measure, even though we all know that children are not to be used for labor... funny question at any rate.
- Q: So much that the plot revolves around it or a major element of the film is machinery. It could be a robot, a car, a cyborg or anything of that matter.BQ: Do you ever buy a film on DVD/Blu-Ray without watching it first?BQ2: What's the longest you've ever waited to see a film? Bonus Trivia: What do all these films have in common? V For Vendetta, Closer, 28 Days Later, The Exorcist, Natural Born Killers and Kick-A**.- Have a good night :)
- Saw has lots of machinery, and I liked most of the series. BQ: Yes. BQ2: If you are talking about waiting in line, then about 90 minutes. If you are just talking about not going to the movies immediately, then that would be about 1.5 years, and it would be too embarrassing to say what it was since everyone saw it before me. I would lose my gold star for movie watching if it ever got out. trivia - ? No idea, but intrigued as to what the answer is.
- Q: plastic recycling machinery dealers &distributers in mumbai?
- Mohd okorder G/a, Kamal Kunj,Ramchandra Lane, Opp Chate Classes, Behind Allahabad Bank, Malad W, Mumbai - 400064
- Q: Please tell me how to use the multimeter to measure those aspects when the working circuit of construction machinery is out of order
- Measure the control circuit first, and then measure the motor to short-circuit the ground, then measure whether the interphase is short circuited and check step by step.
- Q: 2. Prepare balance of Machinery account on following dataOpening Balance on 1 jan 2010 - 1,20000Purchase of new machinery in yr 2010- 60,000Destruction of machinery due to fire - 12000What is balance on Dec 2010
- Assuming all this is at cost and we don't have to worry about depreciation, AND if the opening balance is 120,000, then Opening Balance on 1 jan 2010 - 120,000 + Purchase of new machinery in yr 2010- 60,000 - Destruction of machinery due to fire - 12000 = balance on Dec 2010 $168,000
- Q: Location: USA - I get 120v on all 3 legs of 3 phase system but check 208v between any 2 legs. Can I step it up to 240v without a transformer? My machinery specifies 240v
- Most houses are supplied with only two of the three phases available in the USA. The circuit breaker box divides the two phases into two sets of 110 volts (each phase to ground) and also has circuit breakers for 220 volts (across the two phases) for clothes dryers and electric stoves, etc. Most factories are supplied with all three phases and certain motors can be connected (by licensed electricians) across all three phases to obtain 440 volts using a motor controller. Local codes and insurance requirements are two good reasons to hire a licensed electrician to safely connect the motor. A transformer may be required to obtain 220 volts and three phase current. Also check the name plate data to determine the required frequency (60 Hz) in the USA.
- Q: Cost of construction machinery use fee
- Depreciation: refers to the construction machinery within the specified service life, the cost of purchase and gradually recover time value for money. According to the depreciation (= budget price X (1- mechanical salvage)) the total number of total number of durable, durable shift number = depreciation period of X years of working class
- Q: information on horticulture i.e machineries,planting, especially chomolia,rape,spinach.onions?
- Assuming you live where there is winter: Plant onion sets either in fall, or very early spring. Well drained soil. Full sun. chomolia, rape, cabbage - seed in very early spring, as soon as the ground is workable. They are all cool-weather veggies, so if you live where summers are hot - plant them someplace where they will get afternoon shade.
- Q: How can I work my biceps without machinery or equipment?
- Simple. Clasp your palms together and begin with your arms straight. Then slowly curl one arm, flexing at the elbow while resisting with the other arm. You'll be doing concentric (positive) training the biceps of one while doing eccentric (negative) training of the triceps of the other arm. Do that until the muscle burns and you cannot flex any more. Good luck and good health!! ?
- Q: Doctor said im unable to use certain machinery due to causing swelling in my hand but she didn't put me on medical leave but my employer did. Are they allowed to do this
- In a word - yes. The employer, under certain circumstances and if you are not protected by a union or contract, can terminate you.
Send your message to us
Modular concrete mixing plant,Accurate dosage system, ensuring concrete quality
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords