• Model TC5610-6 Tower crane ,Work in Different Forms System 1
  • Model TC5610-6 Tower crane ,Work in Different Forms System 2
Model TC5610-6 Tower crane ,Work in Different Forms

Model TC5610-6 Tower crane ,Work in Different Forms

Ref Price:
$20,000.00 - 150,000.00 / unit get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Performance parameters of TC5610-6: performance parameters and technical indexes reach both domestic and international advanced level.
• Max. jib length: 56m; Jib length under different assembling modes can decrease progressively by 6 meters and the Min. jib length is 38 meters.
• Max. lifting capacity 6t;
• Max. hoisting capacity at jib tip: 2.16t;
• Max. lifting moment 800 t.m;
• Max. free-standing height: 40.5m; Max. working height of anchored crane: 220m;
• Hoisting mechanism: QS680D; power: 5.4/24/24 kW; rope capacity: 440m;
• Slewing mechanism: HR75.130; power: 7.5 kW
• Trolleying mechanism: BE33E; power: 3.3/2.2 kW
• Types of tower crane: stationary crane with embedded outriggers, stationary crane with embedded bolts, stationary crane with under-frame and mobile tower crane.

2. Electrical control system
With PLC control, the electrical control system enjoys better reliability and safety. Produced by professional manufacturers with advanced foreign technology, the electrical elements feature service lives that are 3 or 4 times longer than that of domestic products, less faults, easy maintenance and repair as well as reliable operation.

3. Technical features
• The crane boasts of multiple operation modes and wide application. The crane can work in different forms: stationary crane with embedded outriggers, stationary crane with under-frame, stationary crane with embedded bolts and crane anchored to wall, thus being applicable to various construction projects.
• The complete machine adopts internationally well-received beautiful shape;
• The crane features high working speed and excellent speed regulation performance. Stepless speed regulation by frequency control, the world's most advanced solution, is adopted for the trolleying mechanism and slewing mechanism, thus ensuring more stable and reliable operation ;
• The cab is independently installed externally with good vision and large inner space, thus offering a good working environment for operators;
• A variety of safety devices are equipped, which are all mechanical or mechatronic products that are applicable to severe working conditions, so as to ensure the tower crane's reliable operation.

4 Parameters

Rated lifting moment (kN.m)

800

Lifting height (m)

Rope fall

Free-standing stationary crane

Anchored crane

α=2

40.5

220

α=4

40.5

110

Working radius (m)

Max. working radius

56

Min. working radius

2.5

Max. lifting capacity (t)

6

Hoisting mechanism

 Rope fall

α=2

α=4

Speed (m/min)

80

40

8.88

40

20

4.44

Lifting weight (t)

1.5

3

3

3

6

6

Power (kW)

24/24/5.4

Traction mechanism

Speed (m/min)

50/25

Power (kW)

3.3/2.2

Slewing mechanism

Speed (r/min)

  0 ~0.65

Power (kW)

7.5

 5 Images

Model TC5610-6 Tower crane ,Work in Different Forms

Model TC5610-6 Tower crane ,Work in Different Forms

6 FAQ: Installation of tension-bar bracket.

Fix four tension bar brackets on the fourth, the fifth and the sixth section’s upper chord of jib frame respectively. The sixth section is equiped with two brackets.

Caution: Insert the plate at low part of tension-bar bracket into jib web member space, or else, the bracket will unfunction. Tighten the bracket bolts to prevent the tension bar sliding.  Bind tension bar with upper chord of jib by plumbum thread at proper position, which can prevent the tension bar sliding. Cut the plumbum wire when lifting the jib.

 

Q: ok, how do you make a paper crane. i've totally tried with a direction and marked paper, but that didn't work out. by the time i gave up the paper was all smooth cuz it was so worn. anything would help, links, step-by-step instructions, both. whatever. 10 pts to whoever tells me, and i succeed. sweet
The first one is a list of instructions and the second is a video of someone making a crane. Good luck! P.S. Wrong category!
Q: How does a crane get down from a skyscraper once they're done using it? Like the crane on top of the skyscraper, do they get take it apart?
realdolby is correct. Small crane from parts that can be transported in service elevator is brought up and assembled. It is used to swing out and lower larger crane's parts. Then the small crane is broken apart and taken down in elevator.
Q: what type of hydraulic oil does a 2007 liebherr LTM 1160 5.1 crane take?
You're telling me you've been entrusted the control of a crane capable of reaching 565 feet up an you don't know what hydraulic oil it takes?? Jesus Christ mighty... First off, it's in the owners manual, second off it's probably on the resivoir cap.... If you couldn't figure that out you shouldn't be allowed near the damn thing...
Q: list of people confirmed dead from crane accident nyc?
This okorder /
Q: What time period would you consider that Stephen Crane wrote in? I have no idea. By time period, I mean like the kind of writing from those times. Ex: Renaissance Period.
Stephen Crane (November 1, 1871 - June 5, 1900) was an American novelist, poet and journalist. He was born in Newark, New Jersey, the 14th child of a Methodist minister. He died when he was 28. Sorry I don't know what it's called.
Q: If any of you have read The Red Badge of courage by Stephen Crane can you please tell me what you think about it. Is it a good book or is it not?!!!! Do you praise it or critize it !? i need your opinion what's your review! Thanks
The okorder /
Q: What is the admissible weight of a crane?
Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
Q: Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
Crane Fireball Ignition
Q: Climbing process of an internal climbing tower crane
There are two kinds of climbing mechanisms: hydraulic and mechanical. The hydraulic climbing mechanism consists of a ladder ladder, a hydraulic cylinder, a climbing beam and a support leg. The climbing ladder is composed of an upper and a lower bearing beams, separated by two stories, which are fixed on the wall or side beam of the cylindrical structure when the work is used, and both sides of the ladder stand are provided with steps. The load bearing beam corresponds to the four main limbs of the crane tower, and is equipped with 8 guide rollers, which plays a guiding role when climbing.
Q: But theres always someone who gets a prize everytime. Its so unfair!lol
I'm usually one of those people who gets the prize - or whoever is with me at the moment LOL. Who needs an excuse to watch Spongebob? I watch it even when my kids aren't around. Its one of those shows you wish you could hate, but its just too funny!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords