mobile 12m 15m 18m concrete placing boom
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manual Concrete Placing Boom
PARAMETERS
Manual concrete placing boom parameters
| |||
Specifications | 12meters manual | 15meters manual | 18meters manual |
The big arm design | Dual channel | Dual channel | Dual channel |
Radius of gyration (m) | 12 | 15 | 18 |
The height of the placing boom | 5 | 5 | 5 |
Diameter of conveying pipe (mm) | 125 | 125 | 125 |
Leg span (m) | 3.2*3.2 | 4*4 | 4*4 |
Rotation Methods | Manual | Manual | Manual |
The whole weight (kg) | 1100 | 1200 | 1300 |
With weight (kg) | 600 | 800 | 1000 |
Slewing bearing type | 315 | 315 | 380 |
Material | Channel angle | Channel angle | Channel angle |
Slewing range | 360° | 360° | 360° |
CHARACTERISTICS
1. Frame arm structure, increasing the loadingcapacity and stability.
2. Highquality rotary bearing, flexible rotation
3. Doublesupporting leg, improve the stability and bearing capacity of double
4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron
5. Minimal impact on the appearance of vibrationforce
6. Withfour rope, ensure that the safety of product using.
PIPE SPECIFICATIONS
12M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 4.24M | 1 |
| 5.6M | 1 |
Delivery Bend | 148-148 R275 90° | 2 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
15M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.67M | 1 |
| 5.56M | 1 |
| 5.8M | 1 |
Delivery Bend | 275*90 add pipe | 1 |
| 148-148 R275 90° | 1 |
| 157-148 R275 90° | 1 |
| R500 * 90° | 1 |
18M Concrete Placing Boom | ||
Name | Specifications | Quantity |
Straight Pipe | 3.7M | 2 |
| 3M | 1 |
| 7M | 1 |
Delivery Bend | R500 90° | 1 |
| R275 90° | 1 |
| R275 90° +130 | 1 |
| 157-148 R275 900 | 1 |
Delivery& packing & payment
1. FOB Tianjin or others.
2. Delivery time: within 15 days.
3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand
4. Payment term: T/T, L/C.
5. MOQ: 1 set or according the actual situation.
- Q: How to install and use the distributor?
- Construction cable must be overhead or buried in the ground, not flat and put. Construction work should be overhead, not line and wire to be flooded or buried by earth and stone. No wires should be tied to steel cage or other iron support at will
- Q: What are the acceptance items of concrete spreader?
- Have product quality certificate, construction site cloth machine is reinforced
- Q: What is a fixed concrete distributor?
- Internal climbing concrete distributing machine is a kind of distributing equipment for high-rise building concrete construction. The ship borne concrete distributor is a special ship loading equipment for construction and design of harbors and docks
- Q: How to fit the cloth rod of the distributor?
- With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
- Q: What do concrete pumps and fabrics mean?
- People need to arrange for pouring concrete tubing, split pipe, guard, pump handle up too much trouble
- Q: what's the difference between the fabric pump and boom pump?
- The pump is provided with an automobile chassis, and the distributor is not provided. The distributor is usually installed in a floor or an elevator shaft
- Q: What is the Hand operated concrete distributor?
- It effectively solves the problem of pouring material into the wall, and plays an important role in improving the construction efficiency and reducing the labor intensity
- Q: How to maintain the concrete spreader?
- The attached vibration motor adopts a special installation structure, which can make the whole surface of the hopper vibrate evenly, break the arch and cut off the material better
- Q: How to distinguish tower type distributor and general distributor?
- No frame structure. Its stability and service life are all behind the tower cloth machine
- Q: What is the structure of a concrete distributor?
- The vertical pipe has a rotary joint Gu card. By pulling the manpower, the whole turning part can be turned 360 degrees
Send your message to us
mobile 12m 15m 18m concrete placing boom
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords