• mobile 12m 15m 18m concrete placing boom System 1
mobile 12m 15m 18m concrete placing boom

mobile 12m 15m 18m concrete placing boom

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Manual Concrete Placing Boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q: What are the specifications of concrete spreader?
A counterweight box is arranged on the balance frame. It settled in the main beam rear connecting flange, screw firmly, to ensure the stability of the incident
Q: What is the difference between concrete pump truck and concrete distributor in construction?
Pump car and car pump pump, pump transmission range is relatively large, the past can be connected pipe (in pumping pressure permitting), malpractice is relatively heavy, concrete pouring, people need to arrange to remove pipe, guard, pump handle up too much trouble
Q: What are the acceptance items of concrete spreader?
The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
Q: What is a fixed concrete distributor?
Mobile concrete cloth machine "Z" shaped section three folding arm, 360 degree rotation, pitching and folding can achieve full amplitude, pouring in three-dimensional space within the length range of the arm, without pouring dead, can easily realize the concrete pouring construction, wall pipe, the column of various
Q: How to fit the cloth rod of the distributor?
Check whether the bolts of the rod are fully tightened and whether the shaft is normal
Q: What are the weekly inspection items for concrete spreader?
The conveying straight pipe and the 90 degree bent pipe on the rack shall be rotated 180 degrees after the completion of a certain amount of transportation so as to increase the service life.
Q: What is the working principle of the distributor?
When removing the cloth should be cleaned of residual concrete pump tube, then the weight of crane removed, then removed from the distributor to the specified location
Q: What is the Hand operated concrete distributor?
It effectively solves the problem of pouring material into the wall, and plays an important role in improving the construction efficiency and reducing the labor intensity
Q: What are the monthly inspection items of the movable concrete spreader?
Connecting bolts for solid tower, middle section and revolving table
Q: What's the design plan of the concrete spreader?
The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes. The four section folding telescopic lattice truss fabric tape machine fabric tape machine design for a scalable (multiple) tape machine section four nested truss, by wire rope linkage, telescopic friction wheel and eccentric guide slide

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords