• High performance12m 15m 18m concrete placing boom System 1
High performance12m 15m 18m concrete placing boom

High performance12m 15m 18m concrete placing boom

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

High performance12m 15m 18m concrete placing boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q: What is the difference between concrete pump truck and concrete distributor in construction?
Pump car and car pump pump, pump transmission range is relatively large, the past can be connected pipe (in pumping pressure permitting), malpractice is relatively heavy, concrete pouring, people need to arrange to remove pipe, guard, pump handle up too much trouble
Q: What are the acceptance items of concrete spreader?
The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
Q: How to fit the cloth rod of the distributor?
With the cable wind rope cloth rod fixed legs, cable wind rope not too tight, the interval should be set aside cloth rod deformation.
Q: What is the working principle of the distributor?
In order to ensure the safety of the work procedure, prevent the cloth machine from tipping over and pay attention to the stability of the frame of the distributing machine, the construction can be carried out
Q: What is the Hand operated concrete distributor?
Concrete spreader is a new product developed in order to enlarge the pouring range of concrete and improve the level of pumping construction mechanization
Q: How to maintain the concrete spreader?
The attached vibration motor adopts a special installation structure, which can make the whole surface of the hopper vibrate evenly, break the arch and cut off the material better
Q: What are the monthly inspection items of the movable concrete spreader?
Check the rotating reducer for abnormal heating and noise
Q: How to distinguish tower type distributor and general distributor?
No frame structure. Its stability and service life are all behind the tower cloth machine
Q: What is the structure of a concrete distributor?
The vertical pipe has a rotary joint Gu card. By pulling the manpower, the whole turning part can be turned 360 degrees
Q: What is the concrete distributor?
According to the pouring concrete construction environment different and individual requirements, has designed a climbing and walking type, ship type, manual type and other models for the user, the formation of HG series concrete mixer is currently the world's most complete specifications

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords