• Manual Concrete Placing Boom Made In China System 1
Manual Concrete Placing Boom Made In China

Manual Concrete Placing Boom Made In China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Manual Concrete Placing Boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q: How to install and use the distributor?
In order to prevent the cable leakage wounding, should be used in three-phase five wire system, the "three distribution", "two levels of protection", to implement a machine a gate of an insurance, lighting line equipment switch installation, the nearest place, in case of emergency hand brake pull
Q: What are the acceptance items of concrete spreader?
Good mechanical properties, meet the technical standards in the specification, is strictly prohibited in the pressure pipe and tubing in open pipe joint, no end of the hose, and let the arm pull down another rigid connection pipeline, rotary process, no brakes or do reverse operation in the machine when not parked
Q: How to fit the cloth rod of the distributor?
Check whether the bolts of the rod are fully tightened and whether the shaft is normal
Q: What do concrete pumps and fabrics mean?
Pump truck, sub drag pump and automobile pump, drag pump delivery range is relatively large, the pipe can be used in the past (in the case of pumping pressure allowed), the disadvantage is that relatively cumbersome,
Q: what's the difference between the fabric pump and boom pump?
The spreader is mounted according to the height of the building, and the boom pump can only be used for a lower building
Q: What is the working principle of the distributor?
In order to avoid the vibration disturbance of slab steel tubing, tubing must be located in the steel frame, steel bunk put wood as a springboard to the supporting surface, concrete pouring, pouring the casting from front to back, remove bracket until the Jiaowan demolished floor bracket
Q: How to maintain the concrete spreader?
The spiral blade edge of the cloth is inlaid with welded alloy wear-resistant blocks, and the spiral shaft can be operated normally for 10 months. The spiral shaft is designed to be easy to assemble and disassemble
Q: How to distinguish tower type distributor and general distributor?
The steel spreader and the circular pipe distributing machine of the general distributing machine are all simple structures,
Q: What are the benefits of concrete handling machines?
Concrete distributor; material ratio; sling construction; fabric safety
Q: What is the concrete distributor?
According to the pouring concrete construction environment different and individual requirements, has designed a climbing and walking type, ship type, manual type and other models for the user, the formation of HG series concrete mixer is currently the world's most complete specifications

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords