18 Meters Manual Type Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
18m Manual Concrete Placing Boom
1. Structure of 15m Manual Concrete Placing Boom:
This Manual Concrete Placing Boom with its two fold arms in level folding way are adopted by the boom which is 360° with the characteristics of manual operation, flexible, convenient, safe and reliable.
The clear height of this machine is 5 m, and particularly applicable to occasions such as the wall, columns with the steel set prominent.
Lightweight, move flexible, and with the mobile place for tower crane to move conveniently.
2. Main Features of 18m Manual Concrete Placing Boom:
• Frame arm structure, increasing the loading capacity and stability.
• High quality rotary bearing, flexible rotation
• Double supporting leg, improve the stability and bearing capacity of double
• With excellent steel GB, the Firmness is enhanced several times compared to angle iron
• Minimal impact on the appearance of vibration force
• With four rope, ensure that the safety of product using.
3. 18m Manual Concrete Placing Boom Images
4. 18m Manual Concrete Placing Boom Specification
5. FAQ
We have organized several common questions for our clients,may help you sincerely:
①Is your products exported a lot?
We have exported to many, many countries. Every year we ship more than 30 containers of these machines & spare parts for it. Our main market is in Middle-east, Asia & Africa.
②How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
③How long can we receive the product after purchase?
In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.
- Q: What are the specifications of concrete spreader?
- The frame is arranged on the rotary supporting seat, the rotary support can be rotated 360 degrees, the first two girder from the upper pipe support to securely and support cloth rod pipeline transportation, the rear counterweight to achieve balance
- Q: What is the difference between concrete pump truck and concrete distributor in construction?
- Automobile pump flexible tubing can flexibly rotate 360 degrees, the body shift is also very convenient, the pumping efficiency is relatively high, but the cost is more expensive.
- Q: What are the acceptance items of concrete spreader?
- Good mechanical properties, meet the technical standards in the specification, is strictly prohibited in the pressure pipe and tubing in open pipe joint, no end of the hose, and let the arm pull down another rigid connection pipeline, rotary process, no brakes or do reverse operation in the machine when not parked
- Q: How to fit the cloth rod of the distributor?
- Check whether the bolts of the rod are fully tightened and whether the shaft is normal
- Q: What are the weekly inspection items for concrete spreader?
- Check the lubrication situation is good, and timely replenishment of lubricating oil
- Q: What is the Hand operated concrete distributor?
- Concrete spreader is a new product developed in order to enlarge the pouring range of concrete and improve the level of pumping construction mechanization
- Q: How to maintain the concrete spreader?
- The attached vibration motor adopts a special installation structure, which can make the whole surface of the hopper vibrate evenly, break the arch and cut off the material better
- Q: What are the monthly inspection items of the movable concrete spreader?
- Connecting bolts for solid tower, middle section and revolving table
- Q: How to distinguish tower type distributor and general distributor?
- No frame structure. Its stability and service life are all behind the tower cloth machine
- Q: What's the design plan of the concrete spreader?
- The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes. The four section folding telescopic lattice truss fabric tape machine fabric tape machine design for a scalable (multiple) tape machine section four nested truss, by wire rope linkage, telescopic friction wheel and eccentric guide slide
Send your message to us
18 Meters Manual Type Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords