Mobile Type HGY15 Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
HGY15 Mobile type concrete placing boom
The placing boom has a Z-shaped boom assembly withthree foldable sections, which can swing through 360 degrees while luffing,folding/unfolding, thus allowing it to place concrete to form walls, pipes,columns, piles and other vertical structures without confined placement areas.
型号Model | HGY13 | HGY15 | HGY17 | ||
臂架长度 Horizontal reach (m) | 13 | 15 | 17 | ||
臂端软管长Length of hose (m) | 3 | ||||
回转角度 Rotation (°) | 360 | ||||
俯仰角度 Elevation angle (°) | -2~84.4 | 0~90 | |||
系统压力 Elevation angle (Mpa) | 20 | ||||
电机功率 Hydraulics output (kW) | 4 | 4 | 5.5 | ||
驱动方式 Mode of drive | 全液压 Hydraulic | ||||
重量 Total weight (t) | 自重 Without counterweight | 2.7 | 3.2 | 4.94 | |
配重 Counterweight | 1.6 | 2.2 | 2.1 |
- Q: How to install and use the distributor?
- In order to prevent the cable leakage wounding, should be used in three-phase five wire system, the "three distribution", "two levels of protection", to implement a machine a gate of an insurance, lighting line equipment switch installation, the nearest place, in case of emergency hand brake pull
- Q: What are the acceptance items of concrete spreader?
- Have product quality certificate, construction site cloth machine is reinforced
- Q: How to fit the cloth rod of the distributor?
- Place the distributing rod and its counterweight, and request that the center of the cloth pole must be 200~300mm overhead. The sleepers or wooden side will be set under the feet to see whether the cloth pole body is straight
- Q: What are the weekly inspection items for concrete spreader?
- Check the lubrication situation is good, and timely replenishment of lubricating oil
- Q: What is the working principle of the distributor?
- When removing the cloth should be cleaned of residual concrete pump tube, then the weight of crane removed, then removed from the distributor to the specified location
- Q: How to maintain the concrete spreader?
- The spiral blade edge of the cloth is inlaid with welded alloy wear-resistant blocks, and the spiral shaft can be operated normally for 10 months. The spiral shaft is designed to be easy to assemble and disassemble
- Q: What are the monthly inspection items of the movable concrete spreader?
- Check cable, if damaged or aging, should be repaired and replaced immediately
- Q: What is the structure of a concrete distributor?
- Structure: bolt, and the vertical frame, which is fixed on the base part, through the slewing bearing and the top rotating part is connected on the main beam, and the balance arm, the balance arm rod, such that after the formation of the upper transverse rotating part
- Q: What are the benefits of concrete handling machines?
- The construction area of the crane pipe can not be reached, and the concrete distributor can be used instead
- Q: What's the design plan of the concrete spreader?
- Imported cloth machine (tire belt machine) is based on heavy duty truck chassis, or cross-country tire crane as chassis. The distribution machine patent uses the self-propelled crawler crane as the chassis, forming the structure of articulated upper material belt conveyor + crawler chassis + telescopic cloth belt conveyor, which is the first in China
Send your message to us
Mobile Type HGY15 Concrete Placing Boom
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords