Luffing Tower Crane TCD6029 16T With Good Quality
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TCD6029 Description
Feature: Tower Crane
Condition: New
Application: Construction
Tip Load:8T
Span: 60m
Certification: CE,ISO
Place of Origin: China(Mainland)
Model Number: TCD6029
Packaging & Delivery of Tower Crane TCD6029
Packaging Detail: Nude package
Delivery Detail: 25-30days
Main Features of Tower Crane TCD6029
Tower crane is a kind of vertical conveyor for construction, this series tower crane which with high lifting height, big working radius
mainly used for construction project, power station, port etc . It contain lifting system, luffing system, slewing system and running system. This kind of tower crane use standard section hydraulic lifting and connection, it can increase tower crane height by increase stand sections number, and load capacity will not influenced.
Tower Crane TCD6029 Specifiction
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Did Noah build the Ark with no power tools, nails, or crane?
- What do you mean, he didn't have any cranes? Back in those days, before dinosaurs were wiped out in the flood, Brontosauruses were used as cranes. Haven't you ever watched the Flintstones?
- Q: What do you do to become a crane operator, do you go to school and how long is it?
- OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
- Q: what are the application of crane?
- To lift and handle heavy objects. Haven't you seen giant cranes lifting big containers ( having automobiles) from docks and placing them on ships?
- Q: I am doing uni coursework to design an ergonomic layout for an operator cab for a tower crane and so I need to list the required operator controls.Thanks!
- There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.
- Q: Can anyone give me a very accurate slow step-by-step video of how to make the prison break crane perfectly?Its hard to follow the directions on a diagram online so I need a good video.
- you okorder and there ou can search prison break crane!!!
- Q: I am trying to beat the level for the paper cranes on we love katamari damacy, and its really difficult.Anyways, i have completed all of the other levels so far except for a few like the clouds, save the pandas etc., do i have to complete the paper cranes to access these levels?
- Lol I know what you're coming from. You don't exactly have to get 1000 cranes. Try to roll up as many cranes as you can get (tiny cranes count as well). From the start, don't just roll up cranes. You want to grow your katamari so you would be able to roll around more stuff. If there are small things that ARE NOT cranes and is your katamari size, roll them up. That will make your katamari bigger and allow you to roll up more bigger sized cranes. Since most cranes are bigger than the katamari that you start the level with, roll up random things to make your katamari bigger. The bigger your katamari is, the easier it is to roll up many cranes. I managed to roll up about 600 cranes on my first try (after replaying the game on a new file). Did you unlock the clouds and save the pandas yet? If you did, yo don't have to complete the paper cranes to access those levels. You just need to complete the paper cranes, the clouds and the pandas to unlock more levels.
- Q: I know that you have to unfold the origami paper crane, but how do you find the surface area of it???????????????????????????/ please help...........
- Do you remember the formula for determining area? For a flat object (like your paper) the formula is Length X Width = Area. or LW=A So unfold your paper, and measure the length and the width, and simply multiply the two numbers. The resulting number will be your area. Of course, that is the area of the unfolded paper. Your crane in it's folded form will have a much different, and harder to find, surface area value.
- Q: how do u bring a construction crane down?
- That's a perfect application for a sky hook.
- Q: how do they take crane off top of building?
- Giant crane is used helicopter to lift it up and bring it down from very tall building.
- Q: How are those really tall construction cranes assembled ???
- I assume you are talking about a tower crane. From a distance, it looks like a T with one side shorter than the other. First, you need a good foundation for the crane to sit on. Next, you have a large mobile crane. With the mobile crane, you construct the tower (metal framing going up), the cab (where the operator sits and the motors), the boom (the mast out front) and the counter-weights (on the side opposite the boom). For the most part, this will get you a tower crane that will be about 200 feet above the ground. Most tower cranes today are self-jumping. Once you are ready to jump the tower crame (i.e. insert another section of the metal frame) there are hyraulics that lift the boom, cap and counterwieghts. This will create a gap in the metal frame. The tower crane will then pick up a section of frame and hoist it up and the ironworkers will slide it into place. The top section will be lowered down onto the new frame piece. The hydraulic jacks then get re-attached higher up to continue the jumping process. That is how you get a crane to build a 50+ soty building. By the way, once the crane is about 700 feet in the air, (if you have the stomach for it), it is a blast to ride out to the end of the boom.
Send your message to us
Luffing Tower Crane TCD6029 16T With Good Quality
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords