• Luffing Tower Crane TCD6029 16T With Good Quality System 1
  • Luffing Tower Crane TCD6029 16T With Good Quality System 2
  • Luffing Tower Crane TCD6029 16T With Good Quality System 3
  • Luffing Tower Crane TCD6029 16T With Good Quality System 4
Luffing Tower Crane TCD6029 16T With Good Quality

Luffing Tower Crane TCD6029 16T With Good Quality

Ref Price:
$40,000.00 - 80,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane TCD6029 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction           

Tip Load:8T                                           

Span: 60m                                     

Certification: CE,ISO                           

Place of Origin: China(Mainland)          

Model Number: TCD6029         

  

Packaging & Delivery of Tower Crane TCD6029


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Features of Tower Crane TCD6029

 

Tower crane is a kind of vertical conveyor for construction, this series tower crane which with high lifting height, big working radius

mainly used for construction project, power station, port etc . It contain lifting system, luffing system, slewing system and running system. This kind of tower crane use standard section hydraulic lifting and connection, it can increase tower crane height by increase stand sections number, and load capacity will not influenced.

 


Tower Crane TCD6029 Specifiction

 


 Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
The okorder
Q: Crane lifts a 600-kg bin with an initial acceleration of 2 m/s^2. Determine the force in each of the supporting cables due to this motion.?
F = ma Assume the crate is uniformly loaded, both cables will carry the same force F(AB)(4/5) = (600/2)(9.8 + 2) F(AB)(4/5) = 3540 F(AB) = 4425 N F(BC) = 4425 N F(B-Crane) = 600(9.8 + 2) F(B-Crane) = 7080 N As a form of exchange, please remember to vote a Best Answer from among your results. This is not the same as like or thumbs up which are also nice and do boost points, but only after asker awards initial points with their vote.
Q: I'm curious
It's lifted in sections I believe. Once they're at their intended vertical height they then start to construct horizontally. Bit like big boys Mechano (not sure if I spelled that correctly).
Q: when a tall building is under construction you alwase see cranes on top. well i would like to know 1. how they move them up as the buildung gets taller and 2nd after there done how do they get them down?
They disassemble them
Q: I watched a man climb one once and he wasn't secured. Crazy. How much do they get?If there are any operators on here, do you get scared when you climb up/down?
Tower crane operators are actually one of the highest paid of crane operators. It takes many years of career progression and many skills upgrading courses to reach that level. Crane operators start out with the crane trucks operating on ground level. They earn about 2k to 3k a month at this stage. They then progress to low rise cranes and then finally to high rise cranes. All the high rise crane operators are specialists in their field with many years of working experience. They would earn perhaps 7k to 8k a month.
Q: Construction tower crane operator certificate expires, how to verify?
Two, training contentThe crane safety regulations and operation management; classification and main parameters of the crane; the structure and the working principle and the safety protection device of lifting up; the installation and removal of heavy machinery; the whole debugging and acceptance of heavy machinery; the operational and command signal of lifting and repair; and maintenance of heavy machinery.Three, training hours and full-time training arrangement: 5 days, annual training enrollment.Four, training fees450 yuan / person, including registration fees, training fees, books, information, assessment, assessment fees, accommodation, self-care.Five, training certificationStudents complete the prescribed courses, through the examination, after passing the examination by the Municipal Construction Commission issued a number printed and stamped with the "Chongqing City Construction Management Committee of" legal. "Chongqing construction tower crane operator qualification certificate".
Q: I looking for information on the surname Crane.?
See okorder /
Q: What are the requirements for jack up and plus section of jack up tower crane?
When lifting, a standard section is hoisted on the imported beam or introduced platform. Then open the pins or bolts connecting the standard section with the slewing support. Start the oil pump, so that the cage in the standard section of the outward sliding, until the release of a standard section position, and then imported beam or imported platform on the standard section into the connection. This completes a process.
Q: What kind of bodies are tower cranes made of?
Two. The metal structure of tower craneThe metal structure of tower crane is mainly composed of underframe, tower body, jacket, upper and lower support, suspension arm, balance arm, tower top and other main components.Metal structure is the framework of tower crane, which bears the deadweight of crane and all kinds of external loads during operation.Three. Power unit and control systemThe power unit is the power source of the crane, and the power source of the tower crane is an electric motor with an external power supply.The control system includes controls and safety devices. Control device for tower crane is composed of a linkage control console, distribution box, resistor box components, the safety device is mainly composed of height limiter, amplitude limiter, lifting weight limiter, moment limiter, slewing limiter etc..Through the control system, the movement characteristic of the crane can be changed, so as to realize the starting, speed regulation, modification, braking and stopping of each mechanism, so as to achieve various actions required by the crane operation.
Q: I'm trying to workout the best height of a truss for a ship-to-shore container crane project. The crane will have a 65m outreach, 18m center section and 15m backreach. I was thinking in the region of 2m-3m truss height.Any input would be great.Thanks
Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords