Lowes Flexible Duct - Aluminium Flexible Duct for Air Conditioning CE
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Application and benefits of Flexible Duct
-Applied in air conditioning/ventilation systems
-Tear and puncture resistant
-Corrosion resistant
-High flexibility
-Convenient installation
-No toxic gas emission
Non-insulated Flexible Duct
Structure: double-layer aluminum foils +1 layer of PET film.
Structure: 1 layer aluminium foil+ 1 layer of PET film
Insulated Flexible Duct
Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool
Outer jacket: 1 layer of Alu.foil
Glass Wool Density: 16kg/m3; Thickness: 25mm
Insulated Acoustic Flexible Duct
Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool
Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film
Glass Wool Density: 32kg/m3; Thickness: 25mm
Combined Flexible Duct
Structure: flexible duct PVC jacket.
REMARK: Special structure is available according to customer's requirements
Pictures of Flexible Duct
FAQ of Aluminium Flexible Duct:
1. What temperature maximum? Our products: 150℃ and 250℃
2. What MOQ? Our MOQ: 500 pcs
3. What payment terms? We accept T/T and L/C
4. Lead time: 10 days
5. Packing: Nest packing for non-insulated flexible duct, then into plastic bag for non-insulated flexible duct or packed in individual carton box.
- Q: What is the difference between a rigid sleeve and a flexible sleeve?
- The usual insulation materials are associated with the insulation, the choice of insulation materials are usually smaller than the heat, that is not due to changes in the external temperature and dramatic changes in thermal performance can be stable as ever, therefore, the current building commonly used Of the insulation materials to heat insulation mortar and thermal insulation performance classes gnawing rescue to find the majority of silent board, in these two aspects of doing better is the dragon EVB series.
- Q: How to strengthen the construction management and construction quality control
- You can Google Oriental Rainbow's official website, there are rainbow days cat flagship store and other links will have the price and product display, you can also contact Rainbow customer service, it is recommended that you choose the East Rainbow waterproof products and standardized construction team, the East Rain rainbow is the best quality waterproof listed companies RPUF-371 sprayed rigid polyurethane waterproof insulation integrated system "rain rainbow" spray foam polyurethane waterproof insulation integrated system is made of foam polyurethane foam waterproof insulation integrated material and protective surface layer constitute
- Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
- In the past, the external wall insulation technology prevails, the external wall insulation is in the experimental stage, Basically no
- Q: On the classification of car repair, the best details Thank you Such as sheet metal workers, car circuits, etc. Thank you
- There are also special materials such as bamboo, so rare, no longer introduced
- Q: Why should the flexible hose be set in the mechanical ventilation system?
- Bowl buckle price is high! There are many buckle-style markets, so rent up cheap!
- Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
- See the situation, the general 3 percent or so, to see how the management of LZ, hand thank you
- Q: How is the flexible tube of FRP composite pipe defined
- Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
- Q: Plastic tube most afraid of what the East unitary
- The best is to, otherwise the space is not in circulation,
- Q: To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
- The use of air conditioning precautions in the instructions have been introduced on the plain, but very few consumers will carefully read the instructions
- Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Send your message to us
Lowes Flexible Duct - Aluminium Flexible Duct for Air Conditioning CE
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords