Fire Retardant PVC Flexible Duct with Flexible Duct Hangers
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specifications
8 inch insulated flexible aluminum air duct heating and cooling systems
1.high quality insulation material
8 inch insulated flexible aluminum air duct heating and cooling systems
Product Material
10m length aluminum insulation ventilation duct with low priceis made of aluminum foil +fiberglass+aluminum foi+steel wire
Product Feature
8 inch insulated flexible aluminum air duct heating and cooling systems following feature:
1.Size. (Customer's color requirement can be matched)
2.Color. (Customer's color can be fulfilled )
3.Non-toxic .Harmless to people even long time exposure
4.Excellent light transmission. transparent rate above 92%
5.Excellent weather resistance. performance can’t be change easily by Sunlight and Rain
6.Excellent Design.Personalized design and Human design with mordent concept
Product Advantages
8 inch insulated flexible aluminum air duct heating and cooling systems following advantages:
1.Material .environmentally friendly Acrylic
2.High Ruggedness.hard to attrit ,break and damage
3.Good anti-aging Properties .Long Using life Above 5 years
4.Strong Impact resistance .16 times than that of ordinary glass
5.Logo imprinting .Customer's Logo can be imprinted personally
6.OEM.ODM service. Satisfied related service can be offered in short time
7.Competitive price.Price at various level can cater your various requirement
8.Reasonable Delivery time.Fast to arrive at your office By air or Sea
9.Sample .Sample available for your proof and final decision
10.Trial Order are hotly welcome and allowed
Product Details
8 inch insulated flexible aluminum air duct heating and cooling systems
Material of Core Duct | Aluminum/fiberglass/polyester, Steel wire |
Thickness of Core Duct |
25~ 27 mm
|
Fire Resistance | Yes,Good |
Thickness of Insulation | 25mm/50mm (Polyester) |
Density of Insulation | 16kg/m3/32kg/m3 (Polyester) |
Air Velocity | 30 m/s |
Operating Pressure | 3000 Pa |
Operating Temperature Range | -30 °C/+150 °C |
Available Diameters | 50mm - 7500mm |
Available Lengths | 1m - 10m |
Packing | Paper carton box with Polyethylene bag inside |
Diameter of Duct (mm) | Steel wire thickness (mm) | Steel wire spacing (mm) |
102mm | 0.9mm | 30mm |
127mm | 0.9mm | 30mm |
152mm | 1.0mm | 35mm |
203mm | 1.1mm | 40mm |
254mm | 1.2mm | 45mm |
305mm | 1.2mm | 45mm |
315mm | 1.2mm | 45mm |
400mm | 1.2mm | 45mm |
Our Service
1.Competitive price
2.Fast produce time
3.Low MOQ
4.Excellent ODM service
5.Dominant OEM service too
6.Samples available for reference
7.Diverse Logo imprinting service .Engraving , Silk screen imprinting .Full color imprinting
- Q: Cast iron flexible tube A type B What is the difference
- Air conditioning duct glass wool insulation loss is generally between 1
- Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Home appliances to the countryside sales business first of all should go to the local Bureau of Commerce for the record, after authorization, the monthly sales of home appliances to the countryside information information log system, and the corresponding sales invoices, product identification card, the buyer ID document copy Reported to the local financial institutions (usually the local financial office), and then the financial management of your sales information to review, grant subsidies
- Q: Will the embedded stove why use stainless steel corrugated hose connection?
- 62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
- Q: How to optimize the construction management to improve the quality of construction projects
- flexible waterproof casing for seismic fortification of the region, rigid waterproof casing for the pipeline to touch the tattoo Du Gu Sen single point of the wall does not bear the vibration of the building
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
- Q: The sound of water pipes will not produce infrasound damage to the human body?
- The general pipe and pipe material to connect manufacturers to supply matching, so that more to ensure quality
- Q: What are the scope of construction work special operators?
- Cost plus cost plus artificial plus profit on the line! Regional differences are great!
- Q: How to effectively deepen the construction process management to improve the quality of construction projects
- Abstract: The thermal degradation and catalytic degradation of waste polystyrene plastic were carried out
- Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
- national, provincial and municipal projects related to the construction of policies, laws, regulations and the relevant industry regulations
- Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
- It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint
Send your message to us
Fire Retardant PVC Flexible Duct with Flexible Duct Hangers
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords