• Aircon Flexible Duct - Aluminum Flexible Duct for HVAC Air Conditioning CE Marked System 1
  • Aircon Flexible Duct - Aluminum Flexible Duct for HVAC Air Conditioning CE Marked System 2
  • Aircon Flexible Duct - Aluminum Flexible Duct for HVAC Air Conditioning CE Marked System 3
Aircon Flexible Duct - Aluminum Flexible Duct for HVAC Air Conditioning CE Marked

Aircon Flexible Duct - Aluminum Flexible Duct for HVAC Air Conditioning CE Marked

Ref Price:
$1.50 / pc get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
500 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Application and benefits of Flexible Duct

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 

Non-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.

Structure: 1 layer aluminium foil+ 1 layer of PET film

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm
 

Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm
 

Combined Flexible Duct

Structure: flexible duct PVC jacket. 

REMARK: Special structure is available according to customer's requirements

 

Pictures of Flexible Duct  

 

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box. 

 

 

Q:Will the embedded stove why use stainless steel corrugated hose connection?
The construction of the scaffolding of this project is subject to the requirements of the relevant sections of the latest JGJ130-2011 "Safety Code for Construction Fastener Steel Scaffolding" To design and calculation, the preparation of special safety construction program, after the implementation of the approval. The preparation of the steel pipe should be selected first vertical and horizontal spacing and horizontal bar step, only these are determined in order to calculate the amount of steel pipe.
Q:For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
PM25 and other dust particles mosquito 4 The The The One of the most critical is that the window is not New Zealand, to know that China's outdoor air quality is very bad And closed doors and windows (especially air conditioning or warm and warm equipment must be closed when the window), the indoor air in a variety of superimposed pollution (decoration pollution, carbon dioxide exceeded)
Q:Does the desulfurization and denitrification equipment use metal hoses?
Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
Q:How is the flexible casing of the fire pond connected to the tube?
Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
Q:What is the difference between a rigid sleeve and a flexible sleeve?
Apparent density of 23kg / m3 or more, the greater the density the more expensive.
Q:What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint
Q:We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Construction workers classification and breakdown of ordinary types of work
Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:Is the flexible sleeve of the broken wall used as a second retest?
The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
Q:Composite pipe and flexible tube which aspects of the difference
Lap is in the concrete structure of the component, the length of steel is not enough, according to the requirements of the two steel will be superimposed on each other and the formation of the connection The basic forms of steel connections are: lashing lap, welding, mechanical connection several categories Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents General terms of the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Mainly for the construction workers up and down work or external safety net enclosure and high-altitude installation components, said white is the shelf, scaffolding production materials are: bamboo, wood, steel or synthetic materials Some projects are also used as scaffolds when the template, in addition to the advertising industry, municipal, traffic, road and bridge, mining and other departments are widely used

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords