• Liebherr Tower Crane with CE certification System 1
  • Liebherr Tower Crane with CE certification System 2
  • Liebherr Tower Crane with CE certification System 3
  • Liebherr Tower Crane with CE certification System 4
  • Liebherr Tower Crane with CE certification System 5
Liebherr Tower Crane with CE certification

Liebherr Tower Crane with CE certification

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our Tower Crane

 

1) TC60/10 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

 

Tower crane TC4808
ItemUnitFall
α=2α=4
Rated load momentkn.m400
Max.loadT24
RadiusM3~48
Tip max. loadt0.980.98
Hoisting heightindependentM30
attached12060
Trolley speedM/min34/22
Hoisting speed0.4
Slew speedR/min0.6
Outer size of the whole cranechasism4.6*4.6
Standard section1.5*1.5*2.2
Height of crane(independent)37.185
Weight of craneWeight of independent structuret16.92
Counterweightt9
otherMotor capacitykw26.8
Top allowable wind speedM/sOperating≤20
Hoisting≤12
Allowable operating temperature0°C-20~+40

 

 

Liebherr Tower Crane with CE certification

Q: Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline. The driver of the tower exam is nothing more than the operation and safety of knowledge.
Q: crane:300t lift 100t pad sizes:4.5x2 mtrs.ground bearing capacity required?
This depends on the angle of the lift and the distance away from centre of the crane. With the lift at tipping range all 400t will be distributed along the outer half of the pad or on the extreme legs. Rule of thumb is all the load is placed under the one pad. so one pad is 9 sq metres and the load is 400 tonnes so the bearing capacity must exceeds 400/9 tonnes per square metre. 44.44444t/m^2
Q: In the Pacific NW, what will get rid of Crane Flies in my yard?
If they are indeed crane flies, they have very short lives and will be gone in a short time, and do no harm - so why bother? In any case, I do not see how dolomitic lime would help - their larvae are aquatic, not in the dirt, and the adults do not feed.
Q: Im looking for more information on Overhead Cranes!?
You would get lot of information on Over Head Cranes as permanently installed material handling equipment for various industries, if you google search under EOT CRANES. As I know, in steel industries their capacities can go up to 400 Tons. EOT cranes are electrically powered and electrically controlled systems. These cranes are categorized for maintenance application and production application. At times their design and construction are quite complicated specially those of production application such as Steel melting shop of steel plant.
Q: A crane lifts a 2355 N bucket containing 1.81 m3 of soil (density=2084 kg/m3) to a height of 7.56 m. Calculate the work the crane performs.
I will try to make it very simple. First lets convert the 2355 into a mass. 2355/9.81 = 240.06 Kg Then, we need to get the mass of the soil. Density (p)= m/v m= pv m= 2084*1.81 = 3772.04 Kg Total mass= 4012.1 Kg The final step is to calculate the work done. It can be solved from two perspectives and both will lead to the same solution. Sol. 1: Since that the crane is lifting an object, then the work the crane is doing is against gravity which is calculating the gravitational potential energy gained by the bucket. GPE= mgh= 4012.1*9.81*7.56 = 2.99*10^5 Sol 2: Work done= Force*distance moved in the direction of the force The force in this case will be the weight of the bucket. Work done= (4012.1*9.81)*7.56 = 2.99*10^5
Q: a 10 crane is moving across a frictionless surface at 4 m/s. if you wish to bring the crate to a stop, how much work would it need to do to dissipate all the kinetic energy?Physic
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ?mv? =?×10 kgm?/s? = 5x? Joules Example: 10kg @ 4m/s Ke = ? (10kg)× (4m/s)? = 80 Joules
Q: What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q: What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q: Pictures, data, manufacturers.
how in the world could you take a tower crane, a huge crane, and mount it on a wall?

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords