• Layher Aluminium Facade Scaffolding System with top quality CNBM System 1
  • Layher Aluminium Facade Scaffolding System with top quality CNBM System 2
Layher Aluminium Facade Scaffolding System with top quality CNBM

Layher Aluminium Facade Scaffolding System with top quality CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAD-A

  • Material: Aluminium

  • Surface: In Raw

  • Type: European Frame Scaffolding

  • Certification: CE

Layher Aluminium Facade Scaffolding System with top quality CNBM

2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:

3.Product Description

Model No: FAS-A

Model Name: Layher Aluminium Facade Scaffolding System

4.Features:

1. Made of high strength aluminium tube and pofile
2. Including: Assembly Frame, guardrail, diagonal brace, scaffolding deck, base plate, toe board etc.

3. With a few basic elements and a few basic operations, this FACADE SCAFFOLDING will provide you at lightning speed with a safe foundation for any job. It has been the leading frame scaffolding on the Europea market now, and with this unbeatably fast yet strong and safe system you can cope with almost every requirement. FACADE SCAFFOLDING can be used profitably both for scaffolding work and for building trades thanks to its versatile and well-thought-out parts range.

4. With only 6 basic elements, this classical Facade Scaffolding is assembled in no time at all. The system is extendable with lots of logical extension possibilities

5. Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency
Q: - Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
How is offshore oil mining?The method of lifting the oil from the bottom of the hole to the ground by the energy of the reservoir itself or by the artificial supply
Q: What is the bamboo board for the scaffolding of the building?
Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG Construction site commonly used scaffold with stamping steel foot Shouban.
Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q: Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q: The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q: What is the most important safety hazard at the construction site?
2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
Q: There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches