• Facade Scaffold System FAS with layher style CNBM System 1
  • Facade Scaffold System FAS with layher style CNBM System 2
  • Facade Scaffold System FAS with layher style CNBM System 3
Facade Scaffold System FAS with layher style CNBM

Facade Scaffold System FAS with layher style CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS

  • Type: Facade scaffold

  • Surface: paint/electro (hot dipped) galvanized

  • Material: Steel/Aluminium

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description 

Model No: FAS

Model Name: Facade Scaffold System

3.Features:

1. Made of high strength steel tube
2. Including:

1) Frame: 2000/1500/1000mm(H)x732mm(W)

               1000/666mm(H)x732mm(W) with connector

2) Clamp Horizontal: 1572/2072/2572/3072mm(L)

3) Single Beam: 700/1056/1540/2040/2540/3040mm(L)

4) Double Beam: 1540/2040/2540/3040/4112mm(L)x435mm(W)

5) Brace: 2824/3209/3632mm(L) with single clamp

              4433mm(L) with double clamp

6) Safety Gate: 696mm(W)x464mm(H)

7) Steel Plank: 690/1046/1530/2030/2530/3030mm(L)x320mm(W)

8) Aluminium platform ladder: 2530/3030mm(L)x610mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement

 4.

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Facade Scaffold System FAS with layher style CNBM

Q: Why the height increase of ten centimeters increase in housing ten percent
Jian'an cost is the cost of housing construction and housing equipment installation costs for short
Q: the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q: What is the most important safety hazard at the construction site?
2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
It is the main component form of a house
Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
Oh, that love what the lay it? Concrete is the end of the concrete pumping equipment, the role is to pump the concrete through the pipeline to be poured to pour (to say that the "building" is the word is also lay it, huh, huh) components within the template

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches