• Kwikstage System Scaffolding	Gavanized on Sale CNBM System 1
  • Kwikstage System Scaffolding	Gavanized on Sale CNBM System 2
  • Kwikstage System Scaffolding	Gavanized on Sale CNBM System 3
Kwikstage System Scaffolding	Gavanized on Sale CNBM

Kwikstage System Scaffolding Gavanized on Sale CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of  Kwikstage System Scaffolding Gavanized on Sale 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm


  • Kwikstage System Scaffolding	Gavanized on Sale CNBM

  • Kwikstage System Scaffolding	Gavanized on Sale CNBM

  • Kwikstage System Scaffolding	Gavanized on Sale CNBM



  • Descriptions of Kwikstage System Scaffolding Gavanized on Sale 

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of Kwikstage System Scaffolding Gavanized on Sale 


  • STEEL STANDARD

  • Material: steel tube φ48.3x3.25mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 17.02kg

  • Standard with normal length 2.5m, 14.32kg

  • Standard with normal length 2.0m, 11.64kg

  • Standard with normal length 1.5m, 8.94kg

  • Standard with normal length 1.0m, 6.26kg

  • Standard with normal length 0.5m, 3.56kg

  • Topper Standard, 1.72kg

  •  Material: steel tube φ48.3x4.0mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 19.48kg

  • Standard with normal length 2.5m, 16.38kg

  • Standard with normal length 2.0m, 13.28kg

  • Standard with normal length 1.5m, 10.18kg

  • Standard with normal length 1.0m, 7.07kg

  • Standard with normal length 0.5m, 3.97kg

  • Topper Standard, 1.93kg


  • STEEL LEDGER 

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Ledger of  3.00m, 13.00kg

  • Ledger of  2.44m, 10.67kg

  • Ledger of  2.39m, 10.60kg

  • Ledger of  1.95m, 8.87kg

  • Ledger of  1.83m, 8.29kg

  • Ledger of 1.78m, 8.20kg

  • Ledger of 1.47m, 6.97kg

  • Ledger of 1.22m, 5.98kg

  • Ledger of 1.05m, 5.31kg

  • Ledger of 0.71m, 3.97kg


  • TRANSOM (ANGLE)

  • Material: Made of steel 5# angle

  • Surface: hot dipped galvanized

  • Transom 2.39m, 17.71kg

  • Transom 1.78m, 13.60kg

  • Transom 1.27m, 10.19kg

  • Transom 1.22m, 9.85kg

  • Transom 1.05m, 8.70kg

  • Transom 0.813m, 7.12kg

  • Transom 0.71m, 6.42kg

  • Transom 0.60m, 5.75kg

  • Transom 0.51m, 5.08kg

  • L/A Transom 1.8m, 11.78kg

  • L/A Transom 1.2m, 9.56kg


  • BRACE

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Brace 3.6m, 15.33kg

  • Brace 3.2m, 14.00kg

  • Brace 2.7m, 12.25kg

  • Brace 2.0m, 9.33kg

  • Brace 1.6m, 7.99kg


  • STEEL PLANK

  • Material: Made of 1.8mm thickness pre-gal.steel sheet

  • Surface: hot dipped galvanized

  • Size: 229mm(W)x 66mm(H)

  • Steel Plank 4.00m, 25.30kg

  • Steel Plank 3.00m, 18.90kg

  • Steel Plank 2.44m, 15.37kg

  • Steel Plank 2.00m, 12.52kg

  • Steel Plank 1.81m, 11.42kg

  • Steel Plank 1.25m, 8.20kg

  • Steel Plank 1.05m, 7.05kg

  • Steel Plank 0.736m, 5.25kg


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:Write a scaffold method for 743,425 divided by 365EASY 10 points
use a calculator you punk, nobody writes out division anymore, grab your ti-84 and type it out... there's your scaffold method jerk.
Q:He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
Q:Scaffolding installation and precautions?
Began to set up the column, should be set up every 6 span of a throw support, even after the installation of the wall is stable, can be removed according to the circumstances.
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:Was thinking of getting one. How much do they cost?
your okorder /... and they usually cost about 40$
Q:Also what 2 cell populations in the body that don't routinely undergo cell division
The first one is vague. The answer could be the mitotic spindle. It might be kinetochore microtubules. It might be talking about the kinetchores on the chromosomes instead of the microtubules that attach to the kinetochores. It could possibly even be talking about the centromeres, though to me that seems less likely. Neurons in the adult brain (and mature muscle cells?) do not routinely undergo cell division.
Q:Specification and type of scaffold erection
technical requirementThe materials used for steel pipe scaffold shall meet the following requirements:1 steel pipe diameter should be 48 ~ 51mm, wall thickness of ~ 3.5mm, length of 2.1 ~ 2.8m and 4 ~ 6.5m is appropriate, there are serious corrosion, bending, cracks, damage shall not be used.
Q:opinions on scaffolding piercing and how to hide it from school :)?
Why do you have to hide it? It's an ear piercing. And to hide it, just cover it with your hair.
Q:From the Scarlet Letter, Ch. 10-12
Haven't read this book in years but I believe he goes back to the scaffold at night because he is being eaten away by guilt. It is a type of redemptive action, just as Hester had to stand there and be judged for her sins he feels the need to also stand there on the scaffold with Hester (theoretically) and be judged/punished as well, the only difference, of course, is that he does it under the cloak of night, when no one can see him.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords