Kwikstage Modular Scaffolding System with Factory Price CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Kwikstage Modular Scaffolding System with Factory Price
Type:
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Place of Origin:
Surface:
Material.:
Thickness:
Descriptions of Kwikstage Modular Scaffolding System with Factory Price
Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.
The Accessories of Kwikstage Modular Scaffolding System with Factory Price
The main items of Kwikstage scaffolding system
ITEMS SPECIFICATION WEIGHT STANDARD
(VERTICAL)48.3*4.0*3000/2500/2000/1500/1000mm
painted/hot dip galvanized/ect.
steel pipe16.94/14.34/11.53/8.86/6.13kg LEDGER
(HORIZONTAL)48.3*3.2*2400/1800/1200/700mm
painted/hot dip galvanized/etc.
steel pipe9.1/6.85/5.13/3.24kg TRANSOM 2400/1800/1200/700mm
painted/hot dip galvanized/etc.19.92/12.08/10.79/7.79kg BRACE 2400*2000mm/2500/3000mm
pained/hot dip galvanized/etc.9.38/10.35/11.41kg HOPUP BRACKET one board/two board/three board
painted/hot dip galvanized/etc.1.84/4.99/8.58kg The other items of Kwikstage scaffolding system
TIE BAR 2400/1800/1200/700mm
painted/hot dip galvanized/etc.5.41/4.15/2.77/1.72kg STEEL BOARD 2400/1800/1200/700mm
painted/hot dip galvanized/etc.14.5/10.93/7.68/4.94kg END TOE BOARD BRACKET as normal specification or as customers' drawing
painted/hot dip galvanized/etc.1.12kg TOE BOARD BRACKET as normal specification or as customers' drawing
painted/hot dip galvanized/etc.0.72kg BASE JACK and U HEAD 38*4.0*650mm/u head
painted/hot dip galvanized/etc.3.69/4.63kg FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: What issues need to pay attention to the construction of high-level scaffolding
- Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
- Q: They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
- Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
- Q: Fastener type steel pipe scaffold accessories
- fastenerFastener type steel pipe scaffold fastener malleable iron casting should be adopted, its basic form has three kinds: vertical cross bar for a connection between the rectangular fastener, fastener for rotating connecting parallel or oblique bars and rods for butt joint butt joint fastener.
- Q: so yeah as it says above^should i just wait till it no longer hurts, or do you have to wait a certain amount of time...
- Industrial piercings take 9-12 months to heal completely and you never want to remove an unhealed piercing unless the jewelry is causing problems and at that point it should be done by a professional in a sterile environment. Taking the jewelry out before it is healed could cause it to close up, become infected or irritated, and can cause hypertrophic scarring (scar tissue) to form on your piercing. I took my industrial out after having it for 3 months. It was out for less than a minute and when I went to put it back in it went through the first hole easily but wouldn't go through the top hole no matter how hard I pushed. It immediately started bleeding and hurtling like crazy. Awesome. Waste of time, pain, and money. So, you might get lucky and just have it get a little irritated or prolong the healing time by changing it early. But you could also end up like me or worse, with any infected piercing. Why risk it?
- Q: would a scaffold piercing look gay on a guy?
- No i think that would be hott!!! :)
- Q: I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
- The height of the erection of the steel pipe scaffold shall not exceed the provisions of this specification 1.0.3.The design and construction of the 1.0.4 door type steel pipe scaffold shall comply with the relevant provisions of the state and the relevant mandatory standards.
- Q: I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
- Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
- Q: along with this question, -what does she think about during this time period?-how does she apprear on the scaffold? -who does she see and how does she feel?THANKS!!=]
- Here is a good analysis and summary from Shmoop.
- Q: Okay so i have one cartilage piercing already.plan a) i just get a scaffold piercing using already the cartilage piercing i haveplan b) i get another cartilage piercing then just wait for a while get a straight titanium barbell and stick it in threw bothI also need help convincing my mom.Help Me Out Please Thnk You
- Sorry to rain on your parade, but neither of those plans will work. Scaffold piercings need to be lined up a certain way in your ear, so you can't start with an existing piercing because you can't change your ear to fit what is already pierced. Scaffold piercings also need to heal with a bar in for them to be able to support a bar. You can't just get 2 cartilage piercings and stick a bar through. They won't line up and may not be able to support the extra weight of the bar, and migrate out. Seriously, do some research and wait until you are 16 at least.
- Q: Which accessories are included in a movable scaffold
- Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Send your message to us
Kwikstage Modular Scaffolding System with Factory Price CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords