• Kwikstage Scaffolding System Accesories on Sale CNBM System 1
  • Kwikstage Scaffolding System Accesories on Sale CNBM System 2
  • Kwikstage Scaffolding System Accesories on Sale CNBM System 3
Kwikstage Scaffolding System Accesories on Sale CNBM

Kwikstage Scaffolding System Accesories on Sale CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of  Kwikstage Scaffolding System Accesories on Sale

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345

    Thickness:4mm;3.2mm;3mm

  • Kwikstage Scaffolding System Accesories on Sale CNBM

  • Kwikstage Scaffolding System Accesories on Sale CNBM

  • Kwikstage Scaffolding System Accesories on Sale CNBM



  • Descriptions of Kwikstage Scaffolding System Accesories on Sale

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.



  • The Accessories of Kwikstage Scaffolding System 

  • STEEL STANDARD

  • Material: steel tube φ48.3x3.25mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 17.02kg

  • Standard with normal length 2.5m, 14.32kg

  • Standard with normal length 2.0m, 11.64kg

  • Standard with normal length 1.5m, 8.94kg

  • Standard with normal length 1.0m, 6.26kg

  • Standard with normal length 0.5m, 3.56kg

  • Topper Standard, 1.72kg

  •  Material: steel tube φ48.3x4.0mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 19.48kg

  • Standard with normal length 2.5m, 16.38kg

  • Standard with normal length 2.0m, 13.28kg

  • Standard with normal length 1.5m, 10.18kg

  • Standard with normal length 1.0m, 7.07kg

  • Standard with normal length 0.5m, 3.97kg

  • Topper Standard, 1.93kg


  • STEEL LEDGER 

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Ledger of  3.00m, 13.00kg

  • Ledger of  2.44m, 10.67kg

  • Ledger of  2.39m, 10.60kg

  • Ledger of  1.95m, 8.87kg

  • Ledger of  1.83m, 8.29kg

  • Ledger of 1.78m, 8.20kg

  • Ledger of 1.47m, 6.97kg

  • Ledger of 1.22m, 5.98kg

  • Ledger of 1.05m, 5.31kg

  • Ledger of 0.71m, 3.97kg


  • TRANSOM (ANGLE)

  • Material: Made of steel 5# angle

  • Surface: hot dipped galvanized

  • Transom 2.39m, 17.71kg

  • Transom 1.78m, 13.60kg

  • Transom 1.27m, 10.19kg

  • Transom 1.22m, 9.85kg

  • Transom 1.05m, 8.70kg

  • Transom 0.813m, 7.12kg

  • Transom 0.71m, 6.42kg

  • Transom 0.60m, 5.75kg

  • Transom 0.51m, 5.08kg

  • L/A Transom 1.8m, 11.78kg

  • L/A Transom 1.2m, 9.56kg


  • BRACE

  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Brace 3.6m, 15.33kg

  • Brace 3.2m, 14.00kg

  • Brace 2.7m, 12.25kg

  • Brace 2.0m, 9.33kg

  • Brace 1.6m, 7.99kg


  • STEEL PLANK

  • Material: Made of 1.8mm thickness pre-gal.steel sheet

  • Surface: hot dipped galvanized

  • Size: 229mm(W)x 66mm(H)

  • Steel Plank 4.00m, 25.30kg

  • Steel Plank 3.00m, 18.90kg

  • Steel Plank 2.44m, 15.37kg

  • Steel Plank 2.00m, 12.52kg

  • Steel Plank 1.81m, 11.42kg

  • Steel Plank 1.25m, 8.20kg

  • Steel Plank 1.05m, 7.05kg

  • Steel Plank 0.736m, 5.25kg


  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
Three, discharge should meet the following requirements:1, the structure is strictly prohibited to throw to the ground;2, transported to the ground should be timely inspection of the construction parts, repair and maintenance, and according to the varieties, specifications at any time yard storage.
Q:Method for inspection of foot hand frame fittings
GB15831-2006 steel pipe scaffold fastenerGB_5725-2009 safety net
Q:When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:What are the requirements for acceptance of external scaffolding? Want to know before
Hello, this has the following specifications: safety 1, set up a high level scaffolding, the various materials used must meet the quality requirements. 2, the foundation must be firm, before the erection of the calculation, to meet the load requirements, and according to the construction code set up, do drainage measures. 3, scaffolding erection technical requirements shall comply with the relevant provisions of the code
Q:The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:does anyone know where i can find dimmesdale's confession (at night) of his sins upon the scaffold.?
Dimmesdale does not confess to his crimes on the scaffold at night, but he does meet with Hester and little Pearl on the scaffold while Chillingsworth watches. (pg. 220) His public confession comes at the end of the book during the day time and then he dies.(pg. 367) Follow the link I have attached and type in the page numbers in the little box near the top of the page.
Q:What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
A set of how much money a day, of course, there are some monthly price calculation
Q:I couldn't believe it, but yes it happened...
Physics worked in his favor. No God stuff. Really! Become an Atheist. Very simple. No God to fear. No dogma. A life more moral than that of Christians.(statistically proved) Subject to the rule of law by consensus of democracy not the autocratic law of a god. Death is not to fear nor rejoice. Its just like fading into a deep, untroubled sleep. Be happy. Treat people justly. The Truth Will Set You Free
Q:hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
Dab it with tissue until it stops, Try not to play with it too much and if you need to touch it, ALWAYS wash your hands before doing so. Also do hot salt water soaks (as hot as you can stand) twice a day and it'll heal nicely in no time :)
Q:A 67.0- painter is on a uniform 21- scaffold supported from above by ropes. There is a 3.8- pail of paint to one side. The ropes are 1m inside the scaffold on each side. The pail is 1m away from the left rope and 3m from the right rope. The scaffold is a 6m. How close to the right end can he approach safely? How close to the left end can he approach safely?
First of all...no units, no answer. Second of all...according to OSHA (Occupation Safety and Health Administration), NO ONE can walk on a scaffold beam outside the support ropes OR SET ANY OBJECT DOWN outside the support ropes. Hence the answers for both questions are 1 meter. It doesn't matter what a calculation will yield...NO ONE can walk on the beam outside the support ropes safely. Even if a torque balance yields that it will not put the ropes in compression and buckle them...it still isn't considered to be safe by OSHA if the painter is outside the ropes.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords