JL7050 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE JL7050
1) JL7050 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE JL7034
Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 66
Max height with attachment (m) 302
Working range can be adjusted(m)70/65/60/52/45
Min working range(m)2.8
Max lifting capacity(t) 20
Tip load @ 70m(t)5.0
Packaging & Delivery of TC7050
40HQ container
25~30days after deposit
- Q: The crane will only be needed once. Is it possible to hire them?How much in general would a company charge to bring one in?
- of course you can hire a crane for the day, First contact a local crane hire company, they will probably visit your site to see what size crane you need, This will not come cheap, the driver has to be paid for the day and the crane costs have to be included,
- Q: Does anyone know where I can order Sugar Crane to grow?
- Crane? anyway,, if your store has those little pieces you can buy to eat? or if you know someone with canes,, you strip off the hard outer covering,, this has the seed buds,, plant these in 3 inches of soil and wait,, cane is slow growing!! if you google sugar cane growing or go to wikipedia you will find plenty of info google buy sugar cane seeds you will find sites to order!!
- Q: the numbers i found on it are ay7648 ssh-310-nc
- Crane SSH-310-NC, hydraulic, rough idle, good midrange hp Intake Open-Close BTDC-ABDC 40-90 Exhaust Open-Close BBDC-ATDC 88-42 Degrees Advertised Duration Int. 310 Exh. 310 Degrees Duration @ .050 Cam Lift Int. 236 Exh. 236 Running Clearance Hot Int .000 Exh. .000 Gross Valve Lift Int. .485 Exh. .485 RPM Range min 3800 max 6800 valve float 7000
- Q: He looked so out of his comfort zone at UFC 140. No support from either Silva or Seagal. Which brings me to another question. Why weren't those 2 by his side? Seagal or Silva are always at his side.Jones' height shouldn't be an issue. He should've at least tried to use it.
- machida was getting pressured way too much the front head kick has to be set up to work you cant just throw it up
- Q: type of dc motors used by electric train/subway,crane & fan.give a brief explanation to your answer?
- I believe that electric trains and subways use series motors when DC motors are used because the series motor has a torque vs. speed curve that provides high torque at low speed and low torque at high speed. Since power is equal to torque times speed, that is essentially a constant power mode of operation. I believe that mode is selected because it results in a smaller and less expensive complement of power delivery equipment and more efficient operation. Although it has been many years since DC motors were used extensively for cranes, I believe that series motors were used more than other types for the same reasons stated above. However, compound or separately excited motors may have been used for better speed and torque control at low speeds. Except for heater fans in vehicles, I don't believe DC motors have ever been used much for fans. Today, permanent magnet DC motors are used for all of the little motors in vehicles including the radiator fan that was formerly belt driven by the engine. A permanent magnet motor is like a separately excited motor or a shunt motor. The optimum DC motor for a fan would probably be a shunt motor because a fan requires increasing torque as speed increases. Today, computers are cooled by brushless DC motors.
- Q: I watched a man climb one once and he wasn't secured. Crazy. How much do they get?If there are any operators on here, do you get scared when you climb up/down?
- 1. No need to be secured, the ladder inside the crane tower has many platforms. It's actually a heap of ladders and platforms not a single ladder. Usually the ladder is surrounded by a cage that would catch you if you fell. Once at the top there are handrails everywhere, you just make your way to the cabin. 2. Average here in Australia is about 1500 to 2000 non union and 2500 to 3000 union. 3. Not worried climbing but if there is a thunderstorm and you are in the cabin it can be scary 4. You shouldn't climb the crane when it's rainy as its all steel it is slippery if wet but sometimes it cannot be helped. You should wear non slip boots too
- Q: my overhead crane refuse to work transvesely
- Limit switch replacement requires adjustment of the cranes travel limits. The limits are imposed by the manufacturer for the application. This service is normally factory authorized only.
- Q: i will like to crane operator?
- You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
- Q: What are equations /formulas that use to calculate maximum vertical load values, the maximum length of boom?
- Hello, Briefly, the structure of the crane or lifting mechanism is not usually the limiting case. The limiting case is to ensure that the Center of Gravity of the mobile crane with the load is such that it is bound within the tires or footprint of the crane. If this load is outside the footprint, the crane tips over.
- Q: Also, could anyone give me a site with a detailed behind the scenes look on different types of freight ships? I hold a strong interest in the shipping sector and being unsure on little details like these annoy me. Thanks!
- ? ? ? Onboard Cranes from the cabs on each Crane , where'd you think from ?
Send your message to us
JL7050 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords