JL7032 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE JL7032
1) JL7032 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE JL7032
Max. working range 70m, tip lifting weight 3.2T and Max. lifting weight 12T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 59
Max height with attachment (m) 200
Working range can be adjusted(m)70/65/60/52/48
Min working range(m)2.5
Max lifting capacity(t) 12
Tip load @ 70m(t)3.2
Packaging & Delivery of TC703.2
40HQ container
25~30days after deposit
- Q: I've been wondering about the infamous Crane Stance that many people associate with Martial Arts. Is the Crane Stance a technique that can be used in a fight and strike an opponent effectively without overly exposing yourself to strikes by your opponent? If it is, what are some techniques that can be used out of a Crane Stance?
- The tournament habit of dramatically posing these stances gives one the impression the user is waiting for an attack rather than evading an attack( kick to the knee blocking a kick to the groin lower abdomen area or delivering a knee strike.) Shotokan pretty much removed these stances except for one kata ganakaku in other kata the leg raise is done very swiftly with the leg returning to the ground immediately nijushi ho being a good example.
- Q: if someone have formula for that, one telescopic crane is lifting and i know about the boom lenght and redius,then how i can calculate the angle,if crane crane angle indicator is not working.thankyou.
- Boy! You really need to get the angle indicator fixed and calibrated! There are ways to estimate, but they are inaccurate and therefore not safe, if you have not got the expierence to do it. Don't use the crane for any load close to your SWL!!! An addition: unless you want to measure your reach, i.e. the distance from the crane pedestool to your load, then you can calculate the angle, but you don't need to anymore as you now know what the distance of your lift is and therefore you can look up the SWL on your chart. Get it fixed.
- Q: How about the installation and disassembly of the tower cranes?
- Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
- Q: Ever since a few weeks ago, these retarded giant mosquitos thingys keep on flying into my house from somewhere and they always come into my office and bother me, so im wondering what month they come and what month they leave?
- Crane flies tend to live in wooded areas and open fields, but they can live nearly anywhere, including snowy northern climates and desert lands. In order for their eggs to hatch and larvae to grow into adults, they require either water or damp, decaying material in which to lay their eggs, depending on the species. Crane fly larvae and pupae can be found in damp sod or compost piles, or under the decomposing leaves on the banks of rivers, streams, ponds or lakes. Crane fly larvae and pupae feed on decomposing material, grass and the roots of many plants. This makes them a beneficial insect, as they assist in the cycle of decomposition. Once they emerge in late winter or early spring as adults, after maturing over the winter, their primary purpose is to mate and lay eggs.
- Q: WHAT IS A WADDLE CRANE?
- A Bird
- Q: Under what circumstances does a tower crane require third party testing?
- New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
- Q: How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
- A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
- Q: If anyone can find me a decent video of a Fujian White Crane Kung Fu simple hand block then I will be very grateful! I know sort of how to do it but I would like to get it spot on.Thanks
- To get it spot on as you say, it would be best to get it from your instructor. Videos are sometimes good and sometimes bad. In any case they are a bad way to learn something. They simply can't correct things. And that is assuming that the video shows them correctly in the first place. Learn from a competent instructor.
- Q: Why are crane flies called mosquito eaters?
- Do Crane Flies Eat Mosquitoes
- Q: what is the difference between rigging, wire rope and rope?
- Crane rigging usually refers to the cable that actually is attached to a cylinder in the crane and the motor turns the cyl. and either take up cable or vice versa. The cable is reeved thru the long (arm) boom of the crane and thru pulleys and then at the end of the cable there is a hook.
Send your message to us
JL7032 Topkit Tower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords