• JCM921 coal unloading excavator with long boom 21 tons System 1
  • JCM921 coal unloading excavator with long boom 21 tons System 2
JCM921 coal unloading excavator with long boom 21 tons

JCM921 coal unloading excavator with long boom 21 tons

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

This is 21 tons long boom excavator which is used to unload coal from train carriage. Please note that it's short arm and special bucket.

Rubber track shoe is optional.

Imported with original packing CUMMINS B5.9 series engine, Tier 2 emission, energy saving and green, convenient maintenance, adopt radial seal air cleaner and air pre-cleaner, effectively extend the engine's working time; equipped with the fuel filling pump and pressure transmitter, effectively improve the economical efficiency of the fuel.

Imported with original packing hydraulic components; stable and reliable quality, high working efficiency.

New type of cab and seat, great interiors, new type of air conditioner system could automatically adjust the wind distribuction; comfortalbe to operate.

Equipped with new-generation electronic control system; big color LCD, can monitor the machine at any time; be of self-diagnosis and record functions; electronic control throttle; many operating modes for your option.

Equipped with different types of buckets, some attachments such as breaking hammer, ripper and quick hitch could be your selection; digging, landfill, crushing, leveling could be realized by one machine.

Multi-function GPS can realize remote monitor and bidirectional data transmission, get the machine's operating information at any moment.

Q: excvater machine hitachi?
Hitachi okorder /
Q: Just a few days ago to buy a second-hand excavator 220LC-5 modern excavator but he did not know the detailed parameters of the car, there is provided to slow arm mechanic transfer under the high pressure pump speed is not obvious but hold fast car is very serious. Now is very contradictory, can not work properly, there are understand master, please help, analysis of the reasons below, thank you!
There will also be blocked filter hold car a few days ago I went to work a 1700 throttle 800 and just dumped soil live as mentioned arm slowly I suggest you look for the modern staff transfer pump flow should be very simple for them, my family had a 225-7 for three years. I suggest you buy a Liugong 205C quite good
Q: I have an old lego suit case full of random pieces and i want to play with my nephew but i dont want to buy sets because most i have no interest in and they can be quite expensive as i was looking at them in the lego store. I have no problem buying a few loose random pieces as they have a wall of all random pieces in any color you can think of. Personally id like to see if i can build him barney the big purple dinosaur, hes two and loves him. Or a construction viehicle like a cement truck steam roller or excavator. I saw in the store on display but no set for a golfer made of legos id love to build that since his dad is a golfer and google is failing me.
Try first site listed below. Its got an inventory list of parts and you have sign up but it appears free. The second and third site you buy instructions but might be worth it.
Q: How do they ventilate subway tunnels when they are building them? Obviously they cant use just electric vehicles to create stations and tunnels. TBMs are electric but they must use excavators, loaders, etc when building stations beneath the surface. How do they ventilate these tunnels?
There is a fan plant built next to an access shaft. The fans blow fresh air through the duct that runs down the shaft and into the tunnel, suspended from the tunnel's arch, all the way to the TBM. As the TBM advances, workers add new sections of the duct. The air then flows through the tunnel back to the access shaft. The section of the NYC's Third Water Tunnel I've been to, used very little engine powered heavy equipment. The train that brought workers and supplies to and from the TBM run on the CNG. Everything else run on electricity.
Q: Didn't really know how to word the question. Anyway I want to have the mini excavator delivered to my house and picked up as I don't have a big truck w a trailer.Where I want to dig is about a mile down the road and about 200m from there into some woods on land that I own. The terrain is pretty smooth but its a normal wood floor with lots of sticks leaves etc and can get a little bit hillyWhat I want to know is will I be able to straight up drive the excavator from my driveway to that location and back, or will that be too rough of a drive? And how fast do they drive?Side question, do they come with models with attached headlights as my work may carry into the darkThank you very much
They are tracked so will have no difficulty with the terrain you mention. They go along at a fast walking pace. If this is your first time in one, ask the firm who are renting it for a hour lesson on it when it is delivered.
Q: For the longest time, my 4 y/o has called construction barricades quot;investigaugesquot;. Is he trying to say something else but pronouncing it incorrectly? Something learned from Bob the Builder or the like? I can't correct him if he's onto something I'm unaware of.
Maybe he's trying to say excavations? My 3 year old calls Special Agent Oso on Playhouse Disney Investigation Oso.
Q: The boom cylinders (2) of a 350D LC John Deere excavator have a bore diameter of 145 mm and a stroke of 1520mm. The hydraulic pressure of the system can be boosted up to 36.3 MPa when breaking hard ground or lifting wet sand or gravel. What is the maximum extending speed of both cylinders. Assume all the engine power of 202 kW is converted into hydraulic power.I got 0.17 m/s but wanted to make sure if thats right. If you can show the step by step method of solving this problem. I would greatly appreciate it.thank you.
In order to calculate the Hydraulic Motor Speed n (rpm), you must enter the following figures:- 1) Pump Flow Q (lpm) and is the flow input to the motor from eg hydraulic power pack 2) Motor Efficiency, for hydraulic motors this is in the range 0.85-0.95. 3) Displacement Vg,, sizes for hydraulic motors from 5cm3to 250cm3 Useful conversions factors: 1 cm3 = 0.061 cu.inch 1 Litre = 0.22 UK Gallons = 0.26 US Gallon
Q: them outside right now at my father-in-law's. I'm pretty sure the perc rate will be between 1-5 minutes for 1 inch of water, but we're going to do the official test in a little bit to check. The soil here is sandy and it's a three bedroom house with 3 people living in it and 4 people who visit almost every weekend.
Go make some popcorn and wait they aren't going to listen to you-about 5 yrs from now after it starts backing up, they will take your advice, pretend it was there's all along and fix it right. In the meantime you will not be driving yourself crazy.
Q: What kind of excavator is trong?
It's built in Shandong, JCM.Excavator: excavator is a kind of special engineering vehicle, which is composed of rotating platform, large shovel and mechanical arm.
Q: He works outside as an excavator he doesn't want anything fancy, he wants something durable and I don't know anything about it. but before I go to the jewlery store I want to know I am doing this right LOL
Tungsten Carbide is very strong, very hard, practically scratch-resistant and is a heavier darker metal. One downside to this metal is it can be difficult or impossible to resize so with weight fluctuations, may need to be replaced in the future. Other than that small detail, I think it's a great choice. It's also very affordable, so if the ring did need replacing, it can easily be done.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords