• High Temperature Resistant Flexible Duct for Connecting Applications System 1
  • High Temperature Resistant Flexible Duct for Connecting Applications System 2
  • High Temperature Resistant Flexible Duct for Connecting Applications System 3
  • High Temperature Resistant Flexible Duct for Connecting Applications System 4
High Temperature Resistant Flexible Duct for Connecting Applications

High Temperature Resistant Flexible Duct for Connecting Applications

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
100 roll
Supply Capability:
10000 roll/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:

Hebei, China (Mainland)

Brand Name:

CMAX

Model Number:

CMAX

Type:

HVAC Systems





Packaging & Delivery

Packaging Details:plastic film,carton,wooden case.
Delivery Detail:15-20 days

Construction:

  • Single layer aluminum flexible duct (AFD-S)

  1. 1 layer of the aluminium laminated with the polyester with the coil made of the spring wire.

  2. Total 2 layers: 1st layer: Aluminum foil ( 10um);  2nd layer: Polyester(15um)

  3. Spring wire: carbon steel from 0.9~1.3mm

  •  Multi layer aluminum flexible duct (AFD-D)

  1. 2 layers of the aluminium laminated with the polyester with the coil made of the spring wire.

  2. Total 3 layers: 1st layer: Aluminum foil ( 10um); 2nd layer: Polyester(15um); 3rd layer: Aluminum foil ( 10um)

  3. spring wire: carbon steel from 0.9~1.3mm

Description:

  • Duct is built of the aluminium laminated with the polyester. It was designed especially for the needs of the ventilation and air conditioning market.

  • It has the advantage of no need to use special tools for cutting or fixing, it does not emit toxic gases in high temperatures. it is fire resistance.

 

Technical specification:

 


AFD-S

AFD-D

Air velocity:

30m/s (max)

30m/s (max)

Temperature range:

-30 to '+150

-30 to '+250

Operating pressure:

3000Pa (max)

3000Pa (max)

Fire resistance:

yes

yes

Standard length:

10m

10m





Insulation Products/High Temperature Resistant Flexible Duct

Insulation Products/High Temperature Resistant Flexible Duct

Insulation Products/High Temperature Resistant Flexible Duct


Insulation Products/High Temperature Resistant Flexible Duct

Insulation Products/High Temperature Resistant Flexible Duct

Insulation Products/High Temperature Resistant Flexible Duct


Q: For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
Project Name: Construction Lifting Machinery Safety Supervision and Management Provisions Expiry date: June
Q: What is the effect of concrete pouring on the construction quality?
The use of the trench connection to check the pipe sealing surface is smooth, smooth, no burr. Whether the sealing surface of the sealing ring is scratched, whether the length of the sealing section of the pipe meets the requirements. These three points to ensure that certainly not leaking.
Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
scaffolding pole base with the height must be high longitudinal bar to the lower extension of the two spans and pole fixed height difference should be 1m by slope slope of the vertical axis of the slope should be 500mm single, double Row scaffolding bottom step should be 2m single row, double row and full of scaffolding stand in addition to the top of the top step outside the other layers of each step must be connected with the fastener scaffolding pole connection, lap should be consistent with the column Provisions: the use of connecting rods should be staggered with two adjacent rods should be arranged to set the synchronization within the synchronization within the separation of the two-phase separation of the distance from the distance to 500 mm; each connected to the main node the use of lap joint lap joint should be at 1m and should be used less than 2 rotating fasteners fixed end fastener cover edge to the rod end distance should be 100mm scaffolding Pole top rail bar should be high wall end 1m should eaves mouth 15m
Q: What are the scope of construction work special operators?
This look at their own interest, ah, I was learning mechanical, or from the mechanical drawing began, in the study of tolerance, technology, design, etc., there are many, but also learn a three-dimensional software, like proe
Q: Talk about the class flexible management of the class teacher what the requirements
National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
Q: Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
According to the intrinsic composition of insulation materials can be divided into: inorganic insulation materials and organic insulation materials! Fire rating A is a non-burning point with the insulation effect of materials, materials. Class A non-combustible materials have the characteristics of low density, low thermal conductivity, high pressure capacity, convenient construction, economical and durable. They are widely used in thermal insulation materials and industrial industries such as hot pipes, thermal equipment and other industrial piping equipment and industrial buildings And the civil building envelope structure of the insulation, insulation, sound absorption materials. Because of its good thermal stability, and more for the steel structure of the fire protection coating material. Fire rating B1 level is a flame retardant insulation material, is determined according to the fire resistance of the material, in addition, different parts of the material division is also different! Burning performance: refers to the material and / or products in case of fire burning all the physical and / or chemical changes, that is, the fire reaction characteristics. Fire rating B2 is a combustible insulation material also known as flame retardant materials, mostly organic insulation materials, add the right amount of flame retardants. More common for EPS expansion polystyrene board and XPS extruded polystyrene board, that is, we often say that general board. This material is low in ignition and releases a lot of harmful gases during the combustion process. Fire rating B3 is a flammable insulation material, this is more common as the main material of polystyrene foam insulation material, because this material is easy to burn,
Q: CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
The concrete structure has been included in the structure, but the concrete structure is a concrete structure, but the structure is just a frame structure without concrete structure; another steel structure and concrete structure is a good idea but to do Less, the third floor is said to be the main structure of the original structure, masonry works using concrete, then this will undoubtedly increase the cost of the house, if not very high floor or earthquake area is clearly not economical
Q: The first generation of the tube is that year out?
Are flame retardant, one is benzene board, one is extruded board. Extrusion board is the latest in recent years, the rise of the new insulation sheet, relative to the benzene board, its advantages are: recyclable, can effectively solve the white pollution; physical foam, the production of small harm to the human body ( Benzene is a chemical foam harmful to the human body). Flame-retardant effect and insulation effect is stronger than the benzene board, divided into: B Mangchuan Cao boiling 丨 degree check sand sausage 1 750 or so, B2 level 550 yuan, (B1 flame retardant effect is flame retardant, B2 is relatively poor) Benzene board than the extruded board of various orders cheaper about 200 yuan
Q: What is the difference between the D-LD2000 clamp-type flexible fittings and the KRJ-type clamp-type flexible fittings?
Polystyrene board in the basement wall from the role of waterproof protective layer is to prevent the backfill due to external forces on the destruction of the waterproof layer. That the use of multi-layer board bear two Cao Dutch 丨 sell Zhatai Chun Jun can not. Because the deformation capacity of polystyrene board is relatively large. And the deformation capacity of the multilayer board is small.
Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords