• Lowes Flexible Duct High Carbon Spring Wire System 1
  • Lowes Flexible Duct High Carbon Spring Wire System 2
  • Lowes Flexible Duct High Carbon Spring Wire System 3
Lowes Flexible Duct High Carbon Spring Wire

Lowes Flexible Duct High Carbon Spring Wire

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1. high carbon spring wire
2. Wire dia:0.4-13mm

3 .Standard:DIN17223 GB4357-89

4 .Delivery time:15 days 1*20FCL

5 .MOQ:1 Ton

1. Specification

Material

45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070

Dia

0.3-13.0mm

Surface

Smooth, phosphated and lead patent heat treatment

Quality inspection of each coil

Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc.

Certificate

ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products

Standard

DIN17223/1-1982,GB4357-89 and other standards .

Application

making springs, steel ropes, cable wires, mattress ,banding wire

Coil weight

15KG-200KG per coil or as per your requirement

Packaging

coils, packed with P.P.cloth or according to customers' request.

Dilivery time

15 days for one 20 feet container.

Loading Capacity

Loading about 20tons in one 20's containe

Tensile Strength

High Carbon Steel Wire

wire diameter(mm)

Tensile Strength(N/mm² )

Grade B

Grade C

Grade D

0.20

2150-2550

2400-2790

2690-3090

0.25

2060-2450

2300-2700

2640-3040

0.30

2010-2400

2300-2700

2640-3040

0.40

1910-2300

2250-2650

2600-2990

0.50

1860-2260

2200-2600

2550-2940

0.60

1760-2160

2110-2550

2450-2840

0.70

1710-2110

2060-2450

2450-2840

0.80

1710-2060

2010-2400

2400-2840

1.00

1600-2010

1960-2300

2300-2690

1.20

1620-1910

1910-2250

2250-2550

1.40

1620-1910

1860-2110

2150-2450

1.60

1570-1860

1810-2160

2110-2400

1.80

1520-1810

1760-2110

2010-2300

2.00

1470-1760

1710-2010

1910-2200

2.20

1420-1710

1660-1960

1810-2110

3.00

1370-1670

1570-1860

1710-1960

4.00

1320-1570

1520-1760

1620-1860

5.00

1320-1570

1470-1710

1570-1810

6.00

1220-1470

1420-1660

1520-1760

7.00

1170-1420

1370-1570

8.00

1170-1420

1370-1570

9.00

1130-1320

1320-1520

10.00

1130-1320

1320-1520

11.00

1080-1270

1270-1470

12.00

1080-1270

1270-1470

13.00

1030-1220

1220-1420

 *Chemical Composition

Steel Grade

GB Standard

Carbon

%

Silicon

%

Manganese

%

Phosphorus

%

Sulphur

%

Chromium

%

Nickel

%

Cuprum

%

60#

0.60-0.61

0.18-0.22

0.52-0.59

0.012

0.007

0.06-0.07

0.05

0.18

65#

0.65

0.21

0.56

0.013

0.008

0.05

0.04

0.14

65Mn

0.60-0.70

0.10-0.25

0.70-1.00

0.030

0.030

0.20

0.20

0.25

70#

0.69-0.71

0.19-0.21

0.53-0.58

0.010-0.012

0.003-0.006

0.01-0.05

0.02-0.04

0.04

72A 72B

0.72

0.19

0.71

0.013

0.006

0.02

0.02

0.03

80#

0.80-0.81

0.22-0.24

0.59-0.76

0.008

0.004

0.04

82A 82B

0.82

0.24-0.25

0.76-0.77

0.011-0.014

0.004-0.007

0.17-0.17

2. Packing

Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request

Z2 packing :200-350KF per coil

Iron spool or wood spool for the steel wire

3. Our service

Sample order: we supply you free sample, you pay for the express cost, which  can be shipped in 3 days

Our promise: Send you a workable price ;

Delivery in time;

Service you in lifetime for free;

Full refund if substandard goods

Q: Will the embedded stove why use stainless steel corrugated hose connection?
62-2 meets the requirements 3 The deformation rate of the flexible pipe shall not exceed the design requirements or the provisions of regulation 45 the longitudinal wall shall not appear in the pipe wall, and the annular and other deformation shall be in accordance with regulation 462-3 The requirements of the 4 backfill compaction should meet the design requirements, design requirements, should meet the requirements of Table 463- Table 463-2 Flexible pipe groove backfill site and compaction see Figure 463 Article 462-4 meet the requirements of the general items 1 backfill should reach the design elevation, the surface should be flattened Section 462-5 meet the requirements 2 backfill pipe and ancillary structures without damage, settlement, displacement Section 462-6 Conformity to allowable deviation Average pass rate (%)
Q: The sound of water pipes will not produce infrasound damage to the human body?
The first look at the factory declaration materials in the building level. The second depends on the material you use sandwich panels. (Generally Caigang sandwich rock wool no problem, glass wool depends on the design requirements of the building).
Q: Talk about the class flexible management of the class teacher what the requirements
National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
028W / MK) and enduring excellent insulation and compression performance, compressive strength up to 220-500Kpa
Q: How is the flexible casing of the fire pond connected to the tube?
Composite tube: in a tube of the tube with more than two electrode system, each electrode system independently through the electronic flow, to achieve their own functions, this tube is called composite pipe
Q: CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
Extrusion plate (XPS) is a polystyrene resin or its copolymer as the main component, add a small amount of additives, made by heating and extrusion with a closed-cell structure of the rigid foam
Q: How is the flexible tube of FRP composite pipe defined
Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
Q: Is the flexible sleeve of the broken wall used as a second retest?
There is a staircase in the middle of the tower crane, from the stairs began to climb
Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords