• air diffusers ceiling use for HVAC systerm System 1
  • air diffusers ceiling use for HVAC systerm System 2
  • air diffusers ceiling use for HVAC systerm System 3
  • air diffusers ceiling use for HVAC systerm System 4
  • air diffusers ceiling use for HVAC systerm System 5
  • air diffusers ceiling use for HVAC systerm System 6
air diffusers ceiling use for HVAC systerm

air diffusers ceiling use for HVAC systerm

Ref Price:
get latest price
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
999999 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

  

Usage of Air Diffuser

 

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 

air diffusers ceiling use for HVAC systerm

air diffusers ceiling use for HVAC systerm

air diffusers ceiling use for HVAC systerm

air diffusers ceiling use for HVAC systerm

air diffusers ceiling use for HVAC systerm

air diffusers ceiling use for HVAC systerm

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Q:Home heating stove, how about? Is not very costly, which brand is better.
Okay yes, all in use. Fee is a certain charge. Brand? Are the same principle. With Watson!
Q:20 kilowatts of electric boilers for large area of heating
1000 kW = 1 MW, then 20 kilowatts equivalent to 0.02 megawatts 1 MW of heating area can be an average of 5000 square meters 20 kilowatts can be heated area is about 0.02 * 5000 = 100 square meters 20 kilowatts of electric boilers can be 100 square meters of area heating
Q:Public bath with water heating
Public bath with water heating...
Q:From the HVAC design to explain, to specific methods, please do not talk about the general, probably like, confused for a long time, please enlighten the gods ~ ~ ~ more
First, the warmth of the water pipe according to the design requirements of the experimental pressure (such as the design is not clear requirements of the experimental pressure are 1.5 times the working pressure, but not less than 0.6MPa) at the experimental pressure for 10 minutes, the pressure drop is not greater than 0.02MPa and then pressure To the work pressure, check the pipeline is not infiltration everywhere, do not leak for the above process will be completed in accordance with the above conclusions can be qualified or unqualified conclusions, and then the relevant personnel to confirm the second, warm duct main inspection duct, After the production of the mouth of the mouth, riveting holes, duct flange flanging, ducts between the tight links, inspection to the main, trunk-based. Different pressure levels of the ducts used in the test method of different low-voltage system can be used to test the light leakage method of the sea in the suppression of the Soviet Union to adjust the pressure system should be leaked in the leak test after passing the air volume test of the high pressure system all the air leakage If you feel useful, please use, worthlessly so hard
Q:My home is the developer himself installed boiler heating, the developer to the unified pavement to warm, my family is the first year of the new building, home water and backwater are not hot! I am five units from the boiler room farthest unit, developers say 15 floor is the following from the bottom of the water, 16-30 floor is from the water down, each floor a total of 6 households, I live on the 5th, 1 , 2,3,6 are no problem, only our home and No. 4 problem, we and 6 is a pipeline, 6 home 22 degrees, water meter room is the main road is warm, into the home of the 6th pipe is Hot, and 4,5 into the home of the pipeline is cool, but also do not feel the sound of water? The property fiddle for a week and there is no good bowel flat section of the strong light hold the dog platinum, how is it? More
Agree with the views of the S-Jun always, first check the pipeline, the valve is smooth, if no problem to put a breath. To warm the heat in addition to blocking the gas is blocked, no other problems.
Q:Hello there! I am in the network Chuan demolition shares hit the turtle turtle tied to see you on the questioning on each floor a lot of independent shops heating household measurement problems, I now also encountered, would like to ask how to do more
Install a smart lock valve on each user's return pipe
Q:Home new house ready to install warm, to ask a few, each pipe is not the same, and the price difference is also more, do not know the clerk said that the ravages of the destruction of the slander, It is difficult to judge Yeah, there is a friend know, or the home installed to mention the comments, more urgent ah! The More
As long as the PERT material can be
Q:We have two or three years useless to warm, the annual temperature is about 23 degrees. This year is still not hunger view spy grab the silicon oblique helmion want to, do not know the ground heating facilities have no harm, need to pay attention to what? Question added: water to warm, thank you! More
Nothing to worry about, to warm the dark tube, plastic pipe are used for at least 50 years. The best water to let go.
Q:My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat
My home is rural, in the floor before the ground should be the first shop or what to do to prepare? And what is its structure, how to coil (and the spacing of the tube), and how to warm into the water pipe and each room of the coil how to connect (not ask what to take together)? My house is a floor tile, would like to shop to warm and tiles do not want to dig out. So I would like to use the sand to do to fill the design and production of the floor, the second is to use the sand cost can be lower and the heat of the heat than the heat more heat...
Q:To warm the company which installed the best
To warm is a complex system, the installation of a large number of components to choose, even if the product quality is good, but the performance of lamb bite to find the rescue is to find that if the installation is not in place or very easy to problems, or to the old, professional big company There is a guarantee.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords