• R8 Flexible Duct Insulated Aluminium HVAC Ductings System 1
  • R8 Flexible Duct Insulated Aluminium HVAC Ductings System 2
  • R8 Flexible Duct Insulated Aluminium HVAC Ductings System 3
  • R8 Flexible Duct Insulated Aluminium HVAC Ductings System 4
R8 Flexible Duct Insulated Aluminium HVAC Ductings

R8 Flexible Duct Insulated Aluminium HVAC Ductings

Ref Price:
$1.50 / pc get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
50 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Application and benefits of Flexible Duct

-Applied in air conditioning/ventilation systems

-Tear and puncture resistant

-Corrosion resistant

-High flexibility

-Convenient installation

-No toxic gas emission

 

Non-insulated Flexible Duct

Structure: double-layer aluminum foils +1 layer of PET film.

Structure: 1 layer aluminium foil+ 1 layer of PET film

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm
 

Insulated Acoustic Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+insulated glass wool

Outer jacket: 1 layer of Alu. Foil + 1 layer of PET film

Glass Wool Density: 32kg/m3; Thickness: 25mm
 

Combined Flexible Duct

Structure: flexible duct PVC jacket. 

REMARK: Special structure is available according to customer's requirements

 

Pictures of Flexible Duct  

 

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box. 

 

 

Q: What is the effect of concrete pouring on the construction quality?
Our usual way is to fight the fuse.
Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
, there are cloth-based materials, such as Teflon cloth, etc
Q: What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
Stainless steel corrugated hose is not easy to aging, the two ends of the connection is more difficult to fall off, the safety performance is more reliable
Q: Talk about the class flexible management of the class teacher what the requirements
Hello metal hose made of stainless steel models are mainly single-button type P3 and double button P
Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
See the situation, the general 3 percent or so, to see how the management of LZ, hand thank you
Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
Q: Plastic tube most afraid of what the East unitary
The best is to, otherwise the space is not in circulation,
Q: Is the flexible sleeve of the broken wall used as a second retest?
There is a staircase in the middle of the tower crane, from the stairs began to climb
Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
Can be made of polystyrene particles by the pre-die into the steam completely foam self-adhesive after the formation of foam block through the line to form a polystyrene board

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords