Hot sale WPC decking/decking floor /composite deck
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
WPC Decking Details:
Minimum Order Quantity: | 1000 Meters | Unit: | m | Loading Port: | China Main Port |
Supply Ability: | 20000 Kilograms per Day 24Hours | Payment Terms: | TT or LC | | |
Product Description:
Introduction of WPC Decking
1. Green ecological, Innovative technology, Lifestyle
2. Elegant nature wood grain texture and touch, with wood scent
3. Elegant and detailed shape design
4. Resistant to cracking and splitting
5. Water-proof, moldy-proof, prevents rotting and moisture, anti-acid, alkali and pest resistance
6. Environmental friendly, fully recyclable and no other hazard chemical
7. Safe to use for many years
8. No painting, no glue, free maintenance
9. Anti-slip, less crack and warp, barefoot friendly
10. Good weatherability, suitable from -40°C to +60°C
11.Easy to process install and clean
12.UV resistance, Fade resistant Durable
13.Dimension stability against moisture and temperature
14. High quality with competitive price.
- Q:im looking into getting my dad a new jack for fathers day. What is the difference between a hydraulic jack and a floor jack? What would you recommend and why? Which would be better?
- Bottle Jack Vs Floor Jack
- Q:My front door leads into my living room. The oak floor right infront of the door is so messed up. The rest of the floor is fine. How do I do a good sand/cleanup job on just this part????
- No matter what, if you don't do the whole floor your going to see the difference. Stain or no stain, the floor has aged and the surface has darkened, I'm assuming this door is an outside entrance door. A couple ways I would do this is 1: Tape off a section, be it square, rectangular,1/2 octagon, hexagon, circle, Whatever, make it look like an entrance landing. Sand and finish it however you want. 2: Cost more $ but would solve future problems, Again have a shape in mind, lay it out and cut it out. If need use build that section up with an underpayment made for this purpose. Replace that area with some nice slate tiles, or whatever you like using a thin set mortar.You can buy nice trim for the surface change
- Q:How long does it take for a solid wood floor?
- Three months. Can also not wax, waxing is mainly the floor was shiny
- Q:we build new home last year and now want to lay ceramic floor tiles. but the problem is our floor have cracks (one vertical crack line abiut 8 feet long). how we remove/repair these cracks so that after laying ceramic tiles no danger of these cracks coming again
- If you are talking about ground floor.Underneath your floor below PCC whatever material your contractor used has loosen.No matter how many time you fix the floor.The problem will return.It will be like curved floor.Get hold of the contractor and tell him to fix the problem.
- Q:1) Ground Floor2) Middle Floor3) Top Floor
- id take top, less noise, good view, take the stairs for exercise, no one is walking past your room to get to the next floor.
- Q:I saw a lot of things on the wooden floor of the wall, especially such things, I really do not know how to build, I hope you advise more
- The process and shape I have seen, the wood substrate on the line. Use the panel on the wall, do the floor texture of this process is seen! Wall layer after the use of panel wall wall closed edge, the surface can be decorated with paint or varnish of
- Q:Is tiles and tiles the same?
- Not the same, tiles = brick tiles = brick made with porcelain to answer finished
- Q:Is it okay to wax vinyl floors? Does it help extend th elife of the floors or does it hurt them?
- the best thing you can use on a vinyl floor is just plain soap and water.
- Q:It a good neighborhood. I really don't want to have to go up two flights of stairs everyday. I would be leaving with my bf so he could really do the grocery since he prefers the third floor.:)...i don't know how secure i would feel on the 1st floor........idk need advice.......
- The third floor will get you in really good shape. I had a fourth floor apartment once and got stuck in the elevator and took the stair thereafter. Had a bunch of friends over one Sunday to play cards and watch sports and up the stairs they came. Sure could tell who was out of shape and who wasn't. You will also get much better looking legs. First floor is not as safe plus you hear everyone over you walking around unless it is really insulated. I would chose the upper floor if it was the top floor just because of the noise plus you get a better view. Just grocery shop when your bf is home and able to run down and help haul stuff up. Never thought about fire tho. . .always be sure you have working smoke detectors whereever you live. That can save your life. It did mine.
- Q:my mother wants to lay down new vinyl flooring in the bathroom, but she rent, so she wants it to be a cheap easy project and emphazise on the cheap part (its a very tiny bathroom). shouled she pull up the old flooring or no? is it ok to lay it down ontop of the old floor? she doesnt have the money to re-leven the floor. and should she use glue to glue to the vinyl or now?
- I would ask around and see if any of your boyfriends might do it. Other than that I would strip the old floor off. If its worth doing, its worth doing right. The hard part is cutting and fitting around the fixtures and corners. Don't use those tiles. They are crap.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Hot sale WPC decking/decking floor /composite deck
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords