• HITACHI EX200 excavator bucket HITACHI excavator parts System 1
HITACHI EX200 excavator bucket HITACHI excavator parts

HITACHI EX200 excavator bucket HITACHI excavator parts

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
30 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing



We can design and produce excavator buckets for all brands, scientifically solve stress problem as different construction conditions and customer requirements, and have ability to ensure structural strength, use performance and product quality by selection of high-quality material, advanced computer-aided design and complete control over process welding quality. The specification ranges from 0.1m3 to 12m3.

By bucket type and material, there are common bucket, imitated original bucket, reinforced bucket and rock bucket, which are made from domestic high-tensile structural steel 16Mn (Q345B), in addition, the tooth plate and side edge board of reinforced bucket and rock bucket can be made from domestic high-quality wear-resistant steel NM360 and Sweden ultrahigh-strength wear-resistant steel HARDOX according to customer demands.

By function, there are ditching bucket, grid bucket, cleaning bucket, and tipping bucket, etc. The ditching bucket is suitable for ditching in different forms, and is featured by once forming, no finish and high work efficiency. The grid bucket is used to separate, excavate or salvage bulk materials excellently at a time, and is widely applicable to municipal administration, agriculture, forestry, water conservation and earthwork, and cleaning bucket and tipping bucket are suitable for finishing of slop and other planes and huge desilting and cleaning of riverway and ditches, and the tipping bucket can change the dip angle of cleaning bucket by the hydro-cylinder, which greatly improves work efficiency.

 

By Material and Type

Type

Material

Configuration and Performance

Application environment

common bucket

Q345B

Standard General-purpose Type, Standard Board Thickness, Single-layer Reinforcing Plate at Bottom, Homemade High-quality Bucket Tooth Seat;

Light working environment like excavation of clay and loose soil, and loading of sand, soil and gravel;

imitated original bucket

Q345B

Imitated Original Type, Standard Board Thickness, Single-layer Reinforcing Plate at Bottom, Homemade High-quality Bucket Tooth Seat;

Light working environment like excavation of clay and loose soil, and loading of sand, soil and gravel;

reinforced bucket

Q345B or
Q345B+NM360

Thickened board, double-layer reinforcing plate at bottom, welded reinforcing plates at two sides, preventer plate installed on the side edge board, reinforced bucket tooth seat;

Common heavy-load working environment like excavation of pan soil mixed with broken stones or loading of broken stone or gravel;

rock bucket

Q345B or
Q345B+Hardox

Thickened board, double-layer reinforcing plate at bottom, welded reinforcing plates and creeper treads at two sides, preventer plate installed on the side edge board, special bucket tooth seat for rock bucket; strong wear resistance and bending resistance.

Heavy-load working environment like loading of broken stone, gravel, secondary hard rock, weathered granite and exploded ore;

 

   Comparison of Chemical Composition and Mechanical Performance of Material

Material

Code

Main Chemical Composition

Brinell Hardness
(HB)

Elongation δ
(%)

Tensile Strength σ
b(N/mm2)

Yield Strength σ
s(N/mm2)

C

Si

Mn

P

S

Manganese Board

Q345B

0.18

0.55

1.4

0.030

0.03

163~187

21

470~660

345

Homemade Wear-resistant Board

NM360

0.20

0.3

1.3

0.020

0.006

360

16

1200

1020

High-strength Wear-resistant Board

HARDOX500

0.20

0.7

1.7

0.025

0.010

470~500

8

1550

1300



Q: What are the steps to building a patio? Here is my assumption, maybe you can add to it or tell me I'm crazy.1) Use a Sod Cutter and clear away 2quot; of Sod.2) Lay Down Pea Gravel3) Lay Down Sand4) Place the Pavers, Bricks, whatever down5) Cover the patio with sand6) Use one of those vibrating things that look like a lawn mower without wheels to pack down the sand in between the bricks.7) Sit back with a Mint Julip on your new patio.Where did I go wrong?gt;
THE MOST IMPORTANT TASK IS TO REMOVE TOPSOIL !, BY HIRING A MINITURE 2.5 TON EXCAVATOR IE;HITACHI ETC,FROM HIRE CENTRE, LIKE hirequip .nz, HAS HERE IN N.Z, AND DIG DOWN TO CLAY. ...(IF YOU LAY ON TOPSOIL, IT WILL GET BOGGY AND SETTLE,WHEN WET) DIG A 6 INCH WIDE TRENCH AT 2 INCH DEEP AND POUR A CONCRETE NIB WALL (optional) AROUND PERIMETER....15 INC HIGH....TO HOLD GRAVEL AND KEEP TIDY......INC PLUMBING PIPES/ELECTRICS AND DRAINAGE FOR FUTURE OUTDOOR KITCHEN ETC. FILL TO DESIRED HITE WITH PEA GRAVEL AND USE (60 TO 75 KG) COMPACTOR TO PACK DOWN....OPERATE IN A CRISCROSS PATTERN...UNTIL ROCK SOLID. ON FINAL 2 INCH OF 50/50 SAND AND PEA GRAVEL, MIXED TO 20 % WITH CEMENT (JUST SPREAD CEMENT IN SAND/GRAVEL MIX AND RAKE IN) THEN LEVEL OFF...THEN COMPACT HARD UNTIL PLATE COMPACTOR STARTS BOUNCING ON SURFACE.. AFTER THAT, CHECK FOR DESIRED LEVEL/FALL .....RAKE AND BALANCE UP THE AREA AND COMPACT AGAIN AS PREVIOUS,.., IF NEED BE UNTIL PERFECT..(THE CEMENT IS TO STABILISE BASE), AND USE COMPACTOR IN A CRIS-CROSS PATTERN,ALTERNATING DIRECTIONS AFTER EVERY 2ND ROUND AND NOT JUST COMPACT ONE WAY. THE RESULTS OF FINAL COMPACTION SHOULD BE ROCK HARD). ...THEN LIGHTLY WATER (ENUFF TO DAMPEN TOP LAYER OF SAND/CEMENT MIX) TOP TO SET OFF CEMENT BASE...... ONCE BASE IS SET IN 18 HRS..(HARD BUT DUSTY) THRO 4 MM OF FINE SAND OVER SURFACE THEN LAY DOWN.....OLD BRICKS,HARDWOOD RAILWAY SLEEPERS(AKA, TIES) OR WHATEVER?. THEN FILLGAPS WITH FINE GRIT OR GRAVEL, THE GRIT SHOULD FLOW INTO GAPS LIKE BIRDSHOT. NOTE, I CHOOSE ONLY TO USE THE ABSOLUTE MINIMUM OF SAND AS IT SHRINKS AND SETTLE WHEN DRY, AND AFTER PAVING I ALSO AVOID COMPACTING THE PAVERS ETC....AS IT WILL MAKE A TOTAL MESS, DUE TO BASE BEING SO HARD. THE ADVANTAGE OF GRIT OR SUPER FINEGRAVEL BETWEEN PAVERS ETC DOES NOT BLOW AROUND NOR SETTLE . ....TAKE TIME DON T RUSH... IF THIS FAILS.....GOOGLE....TAUNTENS OR CREATIVE PUBLISHING AND ORDER A PATIO BOOK.
Q: What kind of Substrate? Vita Sand, ReptiSand, Repti Fresh, Excavator Clay?!i Have reptile carpet now bit i want some thing more Natural looking but i don't want my gecko to get impaction! plz helpall items r zoo med by the way
bark is good to have sand is what i have repti sand is good but go in to your pet shop and ask for the sand that is good for leapord geckos hopes this help
Q: Detailed please :)
Possibly made with an excavator of some sort. I am gonna visit that place one day.
Q: I am purchasing 2 1/2 acres of swamp for all practical purposes.I want to dig a 1/2 to 1 acre lake 7 foot deep to use the sand (this is south florida) to make high and dry ground on the rest of the property. I am trying to decide if I need an excavator or a large loader and a mud hog to pump out the water as I am sure it will start to fill the hole as soon as I make it I would think. I am just not sure how you would get a smooth bottom with an excavator.Any Ideas?
We did the same in the north east, with winter snowy weather. We have a flowing well that created a swamp. We hired a contractor with a Hydra Hoe. That rig should be able to stay far enough away from the swamp so it doesn't sink into the swamp. And if you are going to use the sand, you need to let is sit by the pond and drain, then haul it out. Make sure that is included in your bid. I don't think 7' will be deep enough. You'll have a pit for crocks and snakes and frogs and due to the shallow depth and heat in Fla. in several years it will be a swamp again. Go for something deeper and treat it with copper sulfate to control weeds, if allowed by law. Also, check to be sure you don't have cattails there because then you might not be allowed to disturb the area. In some states cattail's are protected wet lands, but maybe not in Fla. And check to see if permits are required because you don't want any big time fines. We love our pond, and the flowing well now feeds it with oxygen 24/7.
Q: Just looking for a good long list so I can organize an itemized bid to compare to the general contractor's base s.f. price. Be as inclusive as you can.Thanks guys.
Well, you need: architect electrician carpenter plumber surveyor painter floor installer, carpet, tile, stone, etc drywall installer/ finisher roofer Plus all of the inspections needed, state, city, county, any needed for insurance purposes. Depending on the style and your requests, there can be many, many other specialty contractors as well.
Q: All the models and bucket capacity of Carter excavator
Carter excavator models have CAT305.5 bucket capacity of 0.2 parties,CAT307 excavator bucket capacity 0.31 party,Carter 307 dug bucket capacity of 0.36 parties,Carter CAT312BC excavator bucket capacity 0.52 partyCAT315DL excavator bucket capacity 0.74 partyCATE200B excavator bucket capacity 0.8 partyCAT320BC excavator bucket capacity 1 Party
Q: Does anyone have good information about architecture in Thera and ancient Santorini?
I've okorder /
Q: I'm looking for a job in San Diego CA, In the La Mesa and EL Cajon area. I'm willing to drive 50 miles for a job. I'm wondering what are all the underground Construction Companies for Excavator Jobsin my area or 50 miles from here? So i can apply to those companies for a job. Only serious answers please. Thank you! really appreciate the help! (: I have more than 20 + years of experience.
Many prayers have long gone up God has heard the prayers. We now could desire to thank God for the persons who're making a distinction for the protection of persons who're caught in this occasion. I thank God that their desires are dealt with with extra beneficial than enouph lots left over. That the insurance companies will pay the fee. That the government will pay regardless of added it particularly is mandatory to reconstruct, etc... yet, i think of we could desire to look into what we (US) could have executed to keep away from this interior the 1st place. perhaps we weren't praying enouph ahead of time. The Lord informed me to no longer pray on the topic of the fires, yet to desire for the persons their protection well being. additionally, thank God that there hasn't been extra beneficial than 2 deaths universal so some distance. God is actual giving choose keeping human beings by using this very complicated time. What the enemy has meant to break lives, the Lord has prevented many deaths.
Q: My general contractor told me that there was not a storm sewer lateral when we built, and I found out that there is (after contacting the local municipality. The excavator/plumber is willing to connect the downspouts and sump pump on one side of my house, but said that he would not do the other side (on the other side of the driveway). My feeling is that we definitely would have done it without a problem, but that he doesn't want to break through the driveway a year later. Am I asking too much to require that he hooks up to downspouts on both sides of the house?
Take a look at the ground level around your house, if you feel there is sufficient grade to allow ground water to run away from your home on the far side of the driveway then just do the one side but if you seem to be at a low point in the subdivision/property then your best bet is to control the ground water by all means necessary. Do some research on backwater valves! I would consider it essential if your in a flood prone area.
Q: A subway excavator lifts a person standing on it in 1 minute.The person climbs op on the unmoving/not working excavator in 3 minutes.In what time will the person climb on the working/moving excavator?(This is translated from another language)
A subway excavator lifts a person standing on it in 1 minute.The person climbs op on the unmoving/not working excavator in 3 minutes.In what time will the person climb on the working/moving excavator? This is a relative speed problem. d = distance that they move upward. The speed of the excavator = d ÷ 60 seconds. The speed of the person = d ÷ 180 seconds The sum of speeds = d/60 + d/180 = 3 d/ 180 + d/180 = 4d/180 = d/45 Time = distance ÷ speed = d ÷ d/45 = 45 seconds = 0.75 minute This makes sense, because the time should be less than the other 2.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords