High Quality Electric Roof Window
- Loading Port:
- Tianjin Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 150Units unit
- Supply Capability:
- 2000 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction of High Quality Electronic control Roof Window:
To offer modern electronic control systems to operate roof windows installed above head height and out of easy reach .control systems and their parts for control of roof windows and window accessories and be selected to suit particular client reauirements .
control systems fitted with motors will also operate rain,wind or smoke senors.fire and smoke pose a serious threat to human life an health.contrary to popular belief .over 90% of fire related deaths are caused by smoke suffocation .and not by high temperature or burning .smoke also causes considerable damage to property .applying apropriate smoke and heat wscape systems can provide considerable help in preventing the dangers caused by high concentratins of smoke and heat.
Features of High Quality Electronic control Roof Window:
1) DC24V Low voltage motor for maximum safety.
2) Piston stroke can be manually adjusted.
3) Build-in over current safety cut-off feature.
4) Suitable for all dimensions of window.
5) Build-in control system, easy installation.
6) Can be controlled by wall switch or remote control, control group by one remote control.
7) Various piston stroke to be selected.
8) Complete supporting bracket kit, suitable for all window type.
9) Operating temperature: -35oC to +65oC. Suitable for halls, stadium, Factory, Sun room.
- Q: How is luggage space in estate cars measured? Is it up to the roof, the parcel shelf or the window line?
- Up to the roof otherwise if you cut the back part of the roof off to the window line you would end up with a trunk space
- Q: So we really need new windows, a new roof, new appliances, and want to redo the bathroom. Obviously windows and roof are more important then the other two! I think we will be getting back a decent return (a minimum of 6500) and we will be doing all the work ourselves. Haven't looked into how much the materials are going to cost yet but since we are doing everything ourselves I think we might be able to get windows and a roof and maybe even have some left over to do something else. Not sure though. So what should we do out of the things listed?
- roof is most important. do that and see how much cash you have left. windows are not cheap. remember, roof 1st, then go from there. save a little of that money for yourselves as a night out when the work is done. makes it worthwhile. you don't have to do everything at once.
- Q: Right under my window there is part of my roof, and I am on the second floor, so that's kinda coool. (:The weather is getting nicer, and I wanna sit on my roof and read. :DDI have a window screen, and I've already figured it out. My only worry is that when i take out the bottom part of my screen, i will drop it and it will slide down my roof. :PAny tips on how to keep my parents from finding out that I took my screen out? (i'm hiding it under my bed... and my parents trust me so they're not snoopers lol)And do you think this is a good idea?
- Depending on the condition of the roof it could be dangerous and falling from a second floor rood is high enough to kill yourself if not seriously hurt yourself. So I think you should reconsider it before going out on the roof.
- Q: Need color ideas for a new house with red roof and red window trimming. Any recommendation(s)?
- White, cream, or soft, pale yellow. If the front door is not an upscale hardwood beauty, but more standard and painted, you might try painting it to match the red trim if not too bright (more a cardinal red, bluer red, not orange like).
- Q: Mine isn't even outside my bedroom window, but I can climb out the bathroom one :) I just chilax there.
- Words can't describe how much I'd love that, I'd love to be able to lie on the roof at night and day watching the stars and the clouds, just to be alone in piece and quiet watching the world go by above everyone else around me.......................
- Q: I have a 03 explorer and the windows and moon roof wont go up and the radio wont turn on i checked all the fuses they are all good I don't know what it could be could someone tell me what it could be
- Check the fuse and ground connection. Make sure the fuse isn't blown. If it is, the wire isn't connected, replace it with the same color and number fuse. Make sure you don't have a loose ground connector. Several circuits run through the same fuse and ground connection. Before preforming any work on your vehicle disconnect the battery, remove the negative. This is to prevent electrical shock. To check the fuse, simply pull it out and see if the little metal wire in the plastic colored part is still in one piece. If it isn't, then it is blown. *** battery disconnected.*** To check the ground connection: Connect one lead of a continuity tester, to a good ground. The other lead connects to the ground connector you want to check. Watch for the light. Light on: Connection is good. Light off: connection is not working. That is the area you will want to check. I have been told it's the Kick panel. It's found under the dash of the front passenger's dash. I had to disconnect each of them and reconnect them just to make sure there wasn't any loose parts. When I first took a quick check I thought everything was tight. Just for kicks I unplugged each of them, including the 8 pin one, I think it's C-219. I also checked for water leaking in
- Q: My Mitsubishi Ecplise Spyder. Changed the door and now the Power window and roof won't work. The Fuse both by the side door and under the hood are ok. Please help. They are stuck in the down position.
- Could be the power window motor isn't any good in the replacement door. I don't know if there's a connection to the power roof from it or not.
- Q: Roof skylight leak how to do in the morning up the skylight position on the floor are water, the walls are moldy,
- First of all, need to confirm that the time of the leaking, is not rainy days? If it is in the rainy day when the water leakage, then the above description of the waterproof work is not done; the other hand, if the outside is not in the rain, the morning to see the water drops down, it is caused by climate reasons. Indicating that the outside temperature is relatively low, and the indoor air moisture and more, so that the water encountered in the cold glass that condensed into water, that drop is very normal. The moldy appearance on the wall should be too humid in the room, or there is a problem of water seepage - but if it is "moldy", it is caused by the indoor air; if it is a local wall, especially Is the junction with the outside of the wall, this situation is the problem of leakage. Suggestions: find someone to understand your home, in the end what is caused by the situation? And then targeted to take measures to repair. ☆ ☆ ☆ above answer, from Google know the team "decoration I know". If satisfied, please click on my answer below the "selected as a satisfactory answer", thank you! ☆ ☆ ☆
- Q: When it comes to warranties, both material and labor. What company has the longest warranties of any company in the United States for roofing, windows, and siding.
- dan, i know you work for the home depot but i'll try to still be respectful. i install permanent natural roofing, siding, cladding and flooring. i warranty ALL of my installs for LIFE. i only use products that have proven their lifespans and were made by god not man and i install them using proven techniques. this is where i get the confidence to guarantee my work for life, not from a calculator or a salesman's mouth or a brochure. the home depot has severely devastated the building trades in the US by selling and installing cheap, temporary products at such a large volume, they have severely affected the prevailing mentality. i installed a roof for the home depot's original founder, bernie marcus, last year. the home is in boca raton, it's 20,000sf under air. he lives in atlanta. this is a 20,000sf golf home with 17 three ton air conditioners and it was considered green! what a joke!! it took me almost six months to hand nail 200squares of brazillian slate (of course he couldn't buy higher quality domestic slate). i hated that company before when they started putting all of my suppliers out of business and i hate them even more now. i talked to bernie marcus and strangely he never mentioned your name! stop repping that billionaires company! hardly any of the money spent there even ends up in our country!
- Q: Bought the building, is the top floor, and is the top of the ramp, so the middle of the room on both sides of the low side, how to decorate more beautiful? The top of the living room is oblique, the top of a bedroom is oblique, the other bedroom is on both sides, with the highest top, and then oblique on both sides, the kitchen and the bathroom are high side, generally low living room, room, kitchen, bathroom, how to design The The The The The The The More
- Landlord, I want to say is that your room is not very long lived in such a house on their own and family members of all the bad luck is a triangular appearance at home is a kind of evil spirits, in the decoration of the time as much as possible to the triangle Become a square angle or a corner of the angle or turn round so that the family and their own will be much better
1. Manufacturer Overview
Location | Tianjin, China |
Year Established | 1995 |
Annual Output Value | Below US$ 1 Million |
Main Markets | 20.00% South America 20.00% South Asia 10.00% Middle East 10.00% North America 10.00% Northern Europe 10.00% South Asia 10.00% Western Europe 5.00% Africa 5.00% Eastern Europe |
Company Certifications | ISO 9001:2000;TUV |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | Tianjin Port, China |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 10-20 People |
Language Spoken: | English; Chinese; |
b) Factory Information | |
Factory Size: | Above 10,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered; Design Service Offered; Buyer Label Offered |
Product Price Range | High; Average |
Send your message to us
High Quality Electric Roof Window
- Loading Port:
- Tianjin Port
- Payment Terms:
- TT or L/C
- Min Order Qty:
- 150Units unit
- Supply Capability:
- 2000 Units Per Month unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords