HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 001
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: When is the introduction of real estate?
- but also with our housing system reform, urban development model began to appear.
- Q: What is the status quo of China's real estate market?
- from 20 years of real estate development process, the real estate industry has gradually entered a standardized and institutionalized road
- Q: Real estate business, when to carry forward the cost?
- How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
- Q: What is the real estate industry?
- real estate intermediary services, including real estate consulting, valuation and brokerage agents, property management.
- Q: What is the gross margin of the real estate industry?
- in order to control the risk of developers In order to return as soon as possible funds will sacrifice part of the profits of advertising costs by 1-1.5% of total sales
- Q: The future of real estate?
- From last year to the People's Day, the state introduced a series of control policies to curb the rise in prices
- Q: What are the specific real estate stocks
- Real estate stocks have been one of the hottest groups in China's stock market. As early as 1990-1994
- Q: Kentucky is selling real estate how to understand?
- KFC's long-term business plan, the basic business will be the sale of KFC's various branches to the various partners
- Q: According to the use of housing classification?
- 5, hotels 6, sports and entertainment facilities 7, government and public facilities 8, multi-purpose buildings (integrated buildings).
- Q: What are the categories of real estate?
- 1, residential land, public facilities land (including commercial land), industrial land, storage land, foreign transport land, road plaza land, municipal utility land, green land, special land.
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 001
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches