• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 010

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q:What is the real estate from the law?
Real estate because of its own characteristics that the location of the fixed and immutable, in economics, also known as real estate.
Q:Real estate in the "five card" which five?
Construction project planning permit" is the construction project in line with the requirements of urban planning legal evidence;
Q:What kind of factors in our housing market?
thus promoting the development of the real estate industry. This factor can be seen from the history of population development and housing history
Q:What are the specific real estate stocks
There are many real estate stocks, real estate four leading is the move, security, million, gold (investment real estate, Vanke, Poly Real Estate, Golden Group) China's largest real estate stocks has been Vanke.
Q:What is the status quo of China's real estate market?
The country's macro-control and related government departments are also increasingly rule-based supervision
Q:Real estate business, when to carry forward the cost?
statements and a series of information, and engineering, budget, sales, finance and other departments, the vast amount of work
Q:What is the real estate industry?
The real estate industry mainly includes the following contents:
Q:What is the gross margin of the real estate industry?
in order to control the risk of developers In order to return as soon as possible funds will sacrifice part of the profits of advertising costs by 1-1.5% of total sales
Q:What are the categories of real estate?
1, residential land, public facilities land (including commercial land), industrial land, storage land, foreign transport land, road plaza land, municipal utility land, green land, special land.
Q:What is the characteristics of real estate prices
Because the real estate itself is fixed and immutable, unlike other commodities through the sale can be transferred to any place to use

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches