HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 021
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q:What is the real estate bubble economy?
- in fact, The use of assets and its profitability is not interested in. With the rise in prices, often the expected reversal and the price of the crash, which usually leads to financial crisis
- Q:What is the land deed tax rate for real estate?
- According to the Provisional Regulations on Deed Taxes of the People's Republic of China
- Q:Determine what long-term factors in our housing market?
- From the long-term factors that determine the housing market in China
- Q:What is the trend of real estate now?
- First, real estate is China's pillar industries, the Government does not allow house prices collapse.
- Q:Kentucky is selling real estate how to understand?
- KFC's long-term business plan, the basic business will be the sale of KFC's various branches to the various partners
- Q:What is the red line in the real estate project?
- Red line from the planning department with a red pencil on the topographic map to draw the land boundary of the land
- Q:Real estate in the "five card" which five?
- State-owned land use permit is to prove that the land user to pay the land use right transfer fee, access to a certain period of time within a state-owned land use rights legal certificate;
- Q:What is the relationship between interest rates and the real estate market?
- the level of interest rates directly affect the cost of real estate development and profits
- Q:How is China's housing market trend ?
- grow and mature, their behavior will be standardized; related system construction will gradually be improved.
- Q:How can we do real estate?
- Personnel engaged in real estate sales should be committed to the development of individuals and undertakings
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 021
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches