• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 004

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q:What is the real estate bubble economy?
an asset Or a series of asset prices in a continuous process of the sharp rise in the initial price increases so that people will be expected to further rise in prices
Q:What is the real estate from the law?
here are three forms of existence: land, buildings, and premises. In the real estate auction, the auction of the subject can also have three forms of existence,
Q:How to classify real estate?
The main categories are as follows: 1 by use (function) division. According to this classification criteria, can be divided into residential real estate market and non - residential real estate market two categories.
Q:What are the specific real estate stocks
Real estate shares refers to the listed companies, real estate projects for the company's main business stocks
Q:Kentucky is selling real estate how to understand?
because he knows the property and location will be the success of each branch of the most important Factor
Q:What is the real estate industry?
real estate business, including the transfer of land use rights, rental, mortgage and housing transactions leasing, mortgage and other activities
Q:How is China's housing market in other aspects ?
First, the proportion of high-end residential will decline, the proportion of affordable housing and low-rent housing will rise
Q:What is the difference between a real estate model and a real estate sand table?
Sandbox generally refers to the whole project of the three-dimensional model, including the project week traffic, environmental and other regional location information
Q:How is the real estate sales invoice open?
the first payment, the mortgage to open the invoice, pay the time to open the invoice
Q:What is the main property sales?
Second - hand is the real estate intermediary companies, mainly engaged in second - hand housing rental and sales

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches