HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What is the status quo of China's real estate market?
- from 20 years of real estate development process, the real estate industry has gradually entered a standardized and institutionalized road
- Q: What is the red line in the real estate project?
- The "red line" is the range boundary line.Road red line is the road boundary line (including green belt, pedestrian walkway)
- Q: What is the gross margin of the real estate industry?
- but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
- Q: What is the meaning of the term in the real estate?
- but there are many houses are not immediately sold for a long time, the accumulation of the house is also more
- Q: What is the impact of the economic environment on real estate?
- The economic cycle determines the effective demand for real estate. The effective demand of the real estate market is limited by the actual purchasing power of the consumers
- Q: How is China's housing market in other aspects of the trend ?
- the future price of the housing market in our country will gradually become reasonable and the house price income will be higher than that of entering into a maintainable space.
- Q: When China introduct the real estate?
- from the beginning of 99 the real estate market into a new stage of market-oriented.
- Q: What is the meaning of real estate?
- Real estate is the general term for real estate and property, including permanent buildings on land and land and the rights derived therefrom
- Q: How to classify real estate?
- According to the different needs, can be from different angles on the real estate market classification
- Q: What are the categories of real estate?
- According to the "urban land classification and planning and construction land standards", urban land can be divided into nine categories:
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 002
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches