HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 005
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What are the aspects of the risk of real estate investment and development?
- In general, risk is a combination of a variety of negative deviations that can lead to consequences and predictions of future behavioral decisions and objective uncertainties
- Q: Real estate, people often say 'case' is what it means
- Case security, usually property companies or real estate recruitment of security personnel, specifically responsible for a district or a property area of security w
- Q: What is the red line in the real estate project?
- Real estate often said that the "red line" is the land for its development and use of the land range (land acquisition within the scope of the land, such as green space, planning road land)
- Q: What is the real estate level market secondary market three market
- The transfer of land, can be a habitat, it can be developed through the "seven links and one leveling" of the cooked land
- Q: What is the meaning of the term in the real estate?
- but there are many houses are not immediately sold for a long time, the accumulation of the house is also more
- Q: What is the real estate development prospects now?
- China's long-term supply of housing market is still tight, the future development trend is getting better.
- Q: What are the specific real estate stocks
- Real estate shares refers to the listed companies, real estate projects for the company's main business stocks
- Q: What is the difference between land valuation and real estate valuation?
- Land valuation is based on the principles, theories and methods of land valuation
- Q: What is the trend of real estate now?
- Since 2000, China's real estate investment has been accounted for more than 5% of GDP share, 2006, 2007 is more than 10% for two consecutive years, is the fact that the pillar industry
- Q: What is the real estate bubble economy?
- in fact, The use of assets and its profitability is not interested in. With the rise in prices, often the expected reversal and the price of the crash, which usually leads to financial crisis
Send your message to us
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 005
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 50000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches