HBC60-13-132S,Remote and Local control modes available.
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
SPEC
Engine Model | 6BTAA5.9-C180 |
Rated Power | 132kW |
Max. Concrete Output | 60 m3/h |
Max. Concrete Pressure | 13.5 MPa |
Max. Concrete Pumping Height | 200 m |
Concrete Slump | 120-230 mm |
FEATURES
Available to meet emission standards with powerful low fuel consumption engines.
High load capacity for maximum efficiency.
Redesigned hopper with S tube increases concrete flow ability and efficiency.
Open and closed loop hydraulic systems available to meet customer needs .
Automatic "Instant High and Low Pressure" switch.
- Q: some brand name!
- my okorder /
- Q: I wanna know why is machinery production more effective than labor?
- Jennifer forgot to mention: - It does not go on unauthorised leave
- Q: What are the large machinery in the construction project?
- Hoisting machinery, such as tower cranes, self-propelled cranes, mast cranes, clamshell cranes, etc.. Compaction machinery such as tire roller, smooth wheel roller, single foot roller, vibratory roller, tamping machine, tamping machine, etc..
- Q: Requirements for construction engineering personnel
- 2. able to statistics reports, register ledger, can handle all kinds of statistical data about machinery and equipment, judge mechanical equipment failure and mechanical equipment status, organize and participate in mechanical equipment installation, commissioning and collection
- Q: Do all hydraulic systems use oil? Or do only some? Please give a list. Thanks.
- If it's hydraulic, it uses oil of some kind, usually, and not surprisingly: hydraulic fluid.
- Q: Mechanical drawings, stiffeners, cutaway, right?
- On the vertical section of the stiffener, a section of the stiffener should be drawn and no cross section is required on the section parallel to the stiffener.
- Q: Im trying to start a buisness building wind turbines.
- It will be easier for you to buy it. Carbon fibers are made several ways. One is making polyacrylonitrile fibers, then coking them; the nitrogen runs off with the hydrogens. You can also make fibers from pitch and coke them. Coking the fibers is NOT simple or easy. Also, carbon fibers are a real pain because they short electric equipment
- Q: I was wondering if every succeeding edition built upon the previous or omitted information as it went. Which is the best from the twenty-third edition through the twenty-ninth in your opinion?
- Brand-new, okorder I also recommend looking at the first edition of Machine Designers Reference by Jennifer Marrs. Keep up with all new titles and global news from Industrial Press at www.scoop.it/t/modern-manufacturing-technology/
- Q: What are the five major cost components of the project cost?
- . Indirect costs refer to the units directly engaged in construction for the organization and management of the expenses incurred during the construction process. Including the management of the construction units in wages, bonuses, allowances and welfare expenses administrative expenses, fixed assets depreciation and repair costs, material consumption, low value consumable amortization, management for utilities, office expenses, travel expenses, inspection fees, engineering guarantee fee and labor protection fees and other expenses.
- Q: Mine is a 1962 Massey Ferguson farm tractor.
- I still use an honest-to-God ten-pound chrome and glass Waring blender from the 1950s, a Toastmaster chrome and bakelite toaster from the same period, a refrigerator, range, and dishwasher from the same era, a Franklin stove from the 1960s (not changed much since the 1760s), a cassette tape recorder from the 1970s, a telephone from the 1980s, a Ford pick-up truck from the 1990s, and a computer monitor from way back in 2005.
Send your message to us
HBC60-13-132S,Remote and Local control modes available.
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords