• Hammer Head Tower Crane with Good Quality System 1
  • Hammer Head Tower Crane with Good Quality System 2
Hammer Head Tower Crane with Good Quality

Hammer Head Tower Crane with Good Quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane: 

The 2015 hot sales tower crane tc4808 features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjusted(m) 

38/43/48

Min working range(m) 

2.25

Max lifting capacity(t)

4

Tip load @ 48m(t)

0.8

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1

2

2

2

4

4

Speed(m/min)

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speed(m/min)

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speed(m/min)

0.4

Counterweight(t)

7.6

Mast section size(L×W×H)m

1.4×1.4×2m

Working temperature

-40-+60°C

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

 

Q: Recently, it seems that any time my front door is open for any period of time, crane flies start migrating inside. I would like to find a way to keep them out when the door is open. Are crane flies attracted to electric bug zappers?
It is much easier to eliminate the reason crane flies occur around your house. They occur in moist areas with decaying vegetation. Unless you live in a swamp you should let the soils around your house dry out. You can also spray the area around your door with an insecticide to keep them from gathering there.
Q: i have an echo-1 m8a4 cqb it has a crane stock that fits a 9.6 1500mah battery but it wont fit a 2000mah so i want to switch to a full stock but im haveing trouble figuring out how to switch them. does anyone own this gun and know how to do it?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
Q: What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q: when a tall building is under construction you alwase see cranes on top. well i would like to know 1. how they move them up as the buildung gets taller and 2nd after there done how do they get them down?
Larger cranes !!
Q: How many meters is the tower crane installed on the edge of the deep foundation pit?
Hello, it depends on your design requirements, generally have the pit bottom, straight out of a tower crane base do. Or elevator shaft is also more. Generally, the foundation pit is shallow foundation pit or relatively small foundation pit.
Q: across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
no but i wouldnt mind seeing one :P
Q: Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
The name of QTZ is the former mechanical standard, Q refers to the crane, T refers to the tower, Z is to indicate the self lifting, and the latter figure represents the nominal torque, the unit is T.M (the standard unit is KN.m)The type of "QTZ63" indicates the hoisting tower crane with nominal lifting torque up to 630KN.m;The type of "QTZ80" indicates the hoisting tower crane with nominal lifting torque up to 800KN.m;
Q: Do they come all the way down?
the operator turns the engine off and puts the crane put it into safety mode so it doesnt hurt near by workers and open the door of the crane but before he does anything els he first turns on the alarm on so no one steals the 5 ton crane when the operators in the bathroom taking a crap/piss doing whatever...
Q: River? Please give me links. I have seen some videos on youtube about the plane getting lifted out, but none of the crane which is what I was wanting to see.
any news site because the Associated Press carried the story
Q: i want to know about the origami cranes
hi, Origami is approximately paper folding. For the magic trick, see Origami (magic trick). For the Microsoft undertaking till now conventional as Origami, see extremely-cellular laptop. the classic origami crane and papers of the comparable length used to fold it Origami cranes Origami from oru which skill folding, and kami which skill paper) is the classic eastern artwork of paper folding. The purpose of this artwork is to create a representation of an merchandise employing geometric folds and crease types ideally with out gluing or reducing the paper, and employing in basic terms one piece of paper. Origami in basic terms makes use of a small variety of diverse folds, yet they may well be blended in a sort of person-friendly guidance on the thank you to make problematic designs. the main properly conventional kind is probable the eastern paper crane. many times, those designs start up with a sq. sheet of paper whose aspects may well be diverse colorations or prints. opposite to maximum conventional theory, classic eastern origami, which has been practiced because of the fact the Edo era (1603–1867), has commonly been much less strict approximately those conventions, each and every so often reducing the paper for the duration of the introduction of the layout.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords