• Hammer HeadTower Crane with Competitive Price System 1
  • Hammer HeadTower Crane with Competitive Price System 2
  • Hammer HeadTower Crane with Competitive Price System 3
Hammer HeadTower Crane with Competitive Price

Hammer HeadTower Crane with Competitive Price

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our tower crane:

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

 

Features of 2015 hot sales tower crane tc4808

1. The tower crane comprises a number of mast sections that are highly interchangeable. The elaborate structure makes it easy for mounting and dismounting.

 

2. The main support of the mast section has both end faces processed by the jig boring machine to live up to the required flatness of both ends and verticality of the whole mast section, thereby improving the overall performance of the tower crane.

 

3. The metal parts are jointed by carbon dioxide gas shielded arc welding to achieve a tough and reliable structure.

 

4. Product quality is further guaranteed by the advanced inspection devices, such as the ultrasonic fault detector and sound level meter.

 

5. A complete set of safe and reliable hydraulic jacking device is adopted for self-elevating. The tower crane goes up and down steadily and the lifting height varies with the building height. These merits make the lifting equipment ideal for high-rise construction.

 

6. The cargo boom with triangular cross-section performs with double lifting points. It features excellent rigidity and convenient installation.

 

7. The hoisting mechanism provides slow dropping of large load in position as well as prompt lifting and dropping for small load. Thus the working efficiency is significantly improved. The lifting speed reducer is purchased from notable manufacturers to ensure that the tower crane works stably with low noise and high reliability.

 

8. Our self-erecting crane makes use of the single row four-point contact slewing bearing manufactured via advanced process by Hoesch Rothe Erde in Germany. This slewing bearing offers fine rigidity as well as excellent bearing ability of axial and radial tilting torque.

 

9. The slewing device comprises hydraulic coupling and planetary gear reducer, thus it enjoys high torsional capacity, high transmission ratio, compact structure, steady operation, and low failure rate.

 

10. The speed of the hoisting mechanism and the slewing device can be regulated by the winding wire motor and resistor to smooth the moving process and also prolong the serving time of the tower crane.

 

11. The components of electrical system are made by well-known enterprises in China and they are stable and reliable in performance.

Independent height (m)

31.5

Max height with attachment (m)

110

Working range can be adjusted(m) 

38/43/48

Min working range(m) 

2.25

Max lifting capacity(t)

4

Tip load @ 48m(t)

0.8

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1

2

2

2

4

4

Speed(m/min)

70

35

7

35

17.5

3.5

Motor

YZTD225M2-4/8 /32    15/15/3.5KW

Trolleying mechanism

Speed(m/min)

20/40

Motor

YDEJ100-4 /8   2.4/1.5KW

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YD132S-6/8  2.4/1.8KW

Climbing speed(m/min)

0.4

Counterweight(t)

7.6

Mast section size(L×W×H)m

1.4×1.4×2m

Working temperature

-40-+60°C

Total power (KW)

23

Power supply requirement (KVA)

115KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

25mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       180A

Rated working voltage & current

380V                   65A

 

TC4808 with CE ISO certificate top kit 4T types of tower crane price for sale

 

Q: what kind of material is used in making of crane and what is the making process of crane.
There are so many kinds of cranes that you need to pick one to get any kind of good answer - the tall T shaped cranes are simply welded up from tubing and barstock into modular sections that will fit on a semi trailer and be hauled to the site. Their structure shows in the photos. A boom crane with telescoping boom has to be made up of welded tube sections with bearings and hydraulic pistons inside and out. And of course, the base of a moveable crane adds a whole series of complications.
Q: why does the power company use helicopters to service the repair lines instead of trucks with tall cranes?
High-tension lines operate at hundreds of thousands, or millions, of volts. At this potential, electricity can jump through several feet of air to reach a path to ground. This pretty much rules out using trucks, because it would be prohibitively expensive or impossible to build a crane out of entirely non-conductive materials. A helicopter is electrically isolated from the ground, so it's less difficult to drop a technician off and let him hang from the line itself while working. (It is still necessary for the technician to use a wand to bring the helicopter to the line's potential before starting work, because of the capacitance of the helicopter's body.) They could of course use a truck to service the lines if the power was disconnected, but the cost of shutting down service to an entire region of the country exceeds the operating cost of a helicopter.
Q: Synopsis for the poem Lost Dances Of Cranes?
If this is the poem, you will find several comments at the link provided. Your fields are empty now. Only your ghosts dance while cranes of another kind dance cities into being. All that remain of you are a fading crackle of your energy and some grainy video footage that people in the new cities will watch to marvel at the wonders the world once held. craftygreenpoet.blogspot .uk/20...
Q: He has to be in his 30's to 40's but I can't find anything that gives me a definite age.
Okay Well, You havent specified in what, but presuming you mean in the comics, and baring in mind he was the psychologist when Thomas Elliot and Bruce were only 7-8, then the bare minimum he could have been then was 21, though he was likely older. THEN presuming Bruce is around 35, though he also is probably older, then the bare minimum Crane could be is 48. that being said, he is likely between 48-60. He just looks good for his age ;). this of course is in the comics, however. The movie is different.
Q: i need six colors mentioned in the story and wat each one means thanks :)
From: The Open Boat By Stephan Crane. These waves were of the hue of slate... ...save for the tops, which were of foaming white... In the wan light, the faces of the men must have been grey. ...the color of the sea changed from slate to emerald-green... ...wild with lights of emerald and white and amber. ...near patches of brown seaweed... ... at the men with black bead-like eyes. ... marked by dingy clouds, and clouds brick-red, ... Ain't they peaches? A faint yellow tone came into the sky over the low land. ... a small bluish gleam on the edge of the waters. ... with a sky of pure blue...
Q: Formulas for calculating outrigger pad sizes, centre of gravity of loads, outrigger loadings
If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
Q: Tower cranes, TC7525-16D, TC5610, TC6015A-10E, ZJ5910, D800-42, the power of these models is how much ah?I hope you can help me. I'm in a hurry!! Thank you!
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q: Are there any standard requirements? If so, please show me some reference materials. Thank you, 20It's urgent, online, etc.. Thank youWould you please not write down the specifications? The specific methods of operation, with what materials are written on, thank you, good, you can add points
The main purpose is to prevent the main cable fixed tower crane tower crane cable weight lead cable pulled bad (insulation damage, core pulling) etc.,
Q: heres a picture of one
they are put up section by section with another crane
Q: a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
I wonder if you saw my response to the additional question you asked of my previous answer to this question .. To see my response .. go to your previous question and click on comment in the Action Bar (below 'Asker's Rating')

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords