• Glass sliding windows System 1
Glass sliding windows

Glass sliding windows

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • PVC sliding doors /Glass sliding windows

  • VC(vinyl, plastic) material, 60mm, 80mm series

    A. Color: Mainly white and Green, other color is also acceptable.

    B. Size: As for your need

    C. Glass: Single glass, Insulated glass, Low-e glass, Argon glass, Tempered glass

    D. Hardware: Chinese top brand

    E. Packing: Standard Export packing

    F. Function:

      1. Good appearance

      2. Can give you more space

      3. Good Air Infiltration and Water Resistance

      4. Sun resistance and Durable

      5. Easy Install and Easy Maintain

    Long-lasting durability, energy-saving, sound-proof

    Certified quality by national and international institutions.

      1. Packing and Delivery
      Package: Hardpaper+ film package. Wooden case can be made for special care delivery. We can make other packings per your requests.
      Delivery detail: Usually 25 working days for a 20 feet container.

      2. Detailed Description
      Double panel offers the latest in stylish home improvement.


      A breeze on ventilation, especially when both doors are open, French doors offer the ultimate in elegance and access to your garden or patio area. They transform an opening into a grand entrance.


      Anti lift pins to each door prevent door being illegally levered upwards to disengage locks.
      Double safety glass (5mm+9A+5mm)


      Facility to have both doors with fully operational handles, inward or outward opening way, luxury and beautiful and solemn appearance, with high-quality hardware, opening smooth, safe and reliable

      China supplier of pvc doors windows

      China supplier of pvc doors windows

Q:Aluminum alloy doors and windows frame how to tear the film
Highest heat treatment! Remember, do not scratch with a blade!
Q:Construction technology to pay how to write ah? Best to give a text, thank you
The format shall be in accordance with the provisions of the local administrative department of construction
Q:Do you want to eat the windows and doors?
Door and window out of the plaster is to eat a little window frame, probably the principle is: the wall plastering door frame 5 mm or so, elegant approach should be silicone edge (where you are rough delivery). Wiping the surface of the laminated window frame is not greater than 1 cm, pay attention to the edge of the silicone must be, here is the weak water seepage.
Q:The first powder wall or the first door frame. What are the provisions? Or what is the reason for admiration. Questions added: the door is big and small. How to deal with. Whether the door frame is measured one by one. Uniform size will be a box does not match the problem. More
In the order of construction, it is certainly the first installation of the doors and windows, the doors and windows frame installed and then paint, cement mortar to cover the edge of the window frame. This approach is both beautiful and solid. Even if the interior decoration to replace the window, the same is the first installation of the window frame with mortar after the painting. ---------------------------------- For your supplementary question, I think you should not be inside the family A few doors and windows of the problem, but in the construction of the bulk of the business, which should be a drawing, can be constructed according to map. People also in accordance with the size of the drawings to stay out of the doors and windows of the hole, you can follow this size, combined with the actual situation of the installation of appropriate to narrow some, as a result of the door frame to determine the size of outsourcing; in order to avoid the occurrence of errors, you can go Site targeted field measurements, such as a specification of the hole to measure a few, so there is no need to measure a one by one.
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Box installed after filling the expansion agent, there is no gap can not fight, with the latter loaded a glass of money relationship is not. Glass is made of glass
Q:What are the main flaws in wooden doors and windows?
Doors and windows of the function of breathable, beautiful. Wooden doors and windows if it is to do outdoor doors and windows, it should be considered, the first is a permanent time will be faded wood rot, the second is the seal, the third is waterproof, the fourth is the wind resistance. If it is indoor, it is mainly to consider fire.
Q:Rough room provided by the heat of the aluminum alloy doors and windows frame color is dark green, hoping to change to white or black. Do not know what method can be achieved? 1, paint? Will it fall off? 2, see someone online that can change the color foil, do not know what kind of film? More
First of all, I would like to know, you are not to change the color under the window and then, if so, you can re-processing the surface of the multi-profile, if not, feel difficult to paint, 135 + + + + + + "that kind of paint do not know okay
Q:How to count the amount of window works
Long * wide = area (hole area), according to a different way to open up like a good!
Q:How to deal with the door frame and the wall connection
First, now the doors and windows and doors of the installation, most of the woodworking board is used to do the background, the use of wood screws and styrofoam fixed, and then the door, window sets of lines sealed; there are individual lining plate, Position and size, the use of styrofoam filled with fixed (gap must be more than 10mm) Second, the polyurethane foam is the installation of doors and windows in the current convenience of the popular process, if it is to consider the problem of seepage of the window, you can refer to the following process operation: The connection of the window to the wall shall first check the number of connectors and the right connector of the brackets and the windows. Check that there is no shaking and jogging between the frame and the wall before no capping. If you find the above phenomenon, the embedded parts to be reinforced, and around the window frame with foam polyurethane to fill, to stay 6 × 6 seam with silicone embedded real. 2. Grass-roots plastering to strictly check the location and size of the hole to prevent the installation of the window frame and then adjust the overall impact of grass-roots level, grass-roots construction must be strictly stratified construction. 3. In the surrounding block before the need to clean up the debris, and rinse, caulking with caulking tools will be embedded into the mortar, and layered embedded, embedded real, to enhance the anti-seepage effect. 4. The windowsill to make a certain out of the water, in order to quickly discharge the rain, the window frame around the outside are sealed with a sealant, the sill outside the lower mouth must be made of notch drip tank to prevent climbing.
Q:It should be renovated in 2000, the quality of the wall is still very good, is a bit dirty, the windowsill paint has been completely sunburn, polished and then paint it? Question added: in the end which first? Answer how it is the opposite
The first brush which will do, but attention can not be carried out at the same time, because it is easy to react so that the wall turns yellow. The windowsill paint can be polished after painting, but pay attention to the chemical properties of paint, not the same type of paint is easy to chemical reaction, it is best to find a professional oil workers look and then buy paint. In addition, it is recommended to change the windowsill into stone, or later will be dry skin.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords