• Galvanized Steel Scaffold  Plank / Aluminum Deck System 1
  • Galvanized Steel Scaffold  Plank / Aluminum Deck System 2
  • Galvanized Steel Scaffold  Plank / Aluminum Deck System 3
  • Galvanized Steel Scaffold  Plank / Aluminum Deck System 4
  • Galvanized Steel Scaffold  Plank / Aluminum Deck System 5
  • Galvanized Steel Scaffold  Plank / Aluminum Deck System 6
Galvanized Steel Scaffold  Plank / Aluminum Deck

Galvanized Steel Scaffold Plank / Aluminum Deck

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1000 m
Supply Capability:
100000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

America Type Scaffolding Plank

 

1.Length: 5’ 6’ 7’ 8’ 9’ 10’ (1524mm 1829mm 2133mm 2438mm 2743mm 3048mm)

2. Width: 9” (228.6mm)

3. Height: 2.5” (63.5mm)

4. Thickness: 1.8mm

5.Hook thickness:6mm

 

 

 

We can supply all kinds of galvanized steel plank with hole and without hole ,width:210 - 240mm ,thickness:1.1- 2.0mm.

 

 

 

Name

Scaffolding Steel Deck

Main Material

Q235/Q345

Certificate

OSHA

Service

OEM Service available

MOQ

one 20' container

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request


 

 

 

 

 

 

 

 



10' x 19" Aluminum Deck

Features

  • Description: 10' X 19' Aluminum Scaffold Walk board

  • Material: Aluminum 6061-T6

  • Finish: Anodized

  • Size: 19 inch wide and 10 foot in length

  • Weight: 39 lbs.

  • Loading capacity: 792lbs.

  • Constructed of all aluminum, this aluminum scaffold walk plank has three broad replaceable hooks

  • Off-set hooks allow continuous decking

 

 

 

 

 




Related products 

 

  



Galvanized Steel Scaffold  Plank / Aluminum Deck 

in bulk ,pallet or as you request

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Q: What are the general specifications of bowl buckle scaffold?
In fact, the conventional bowl buckle scaffold is made of 48 Q235 carbon steel pipe processing, pole specifications are 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.4m, 3.0m; crossbar specifications are 0.6m, 1.2m, 1.5m. The price of any product is determined by its consumption of materials and processing costs
Q: The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q: When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q: What are the main safety problems when dismantling the scaffold
1, all the rods and fasteners in the demolition of the separation, not on the rod attached fasteners or two rods connected to the ground.2, all the feet of the hand, should be erected from the outside of the handle, in order to prevent the feet and garbage from falling.
Q: Scaffolding scaffolding erection norms which requirements, who can say?
The construction load on the frame must be in accordance with the design requirementsAfter the first erection of the body, must be approved by the company's safety and technical departments, and the company's project safety officer after the visa can continueIn case of suspension frame, use more than one month, such as re started, the frame must pass the reinforcement, rod must be re tighten oil, can be usedBefore the building should be approved with the consent of the special construction plan, should be in accordance with the scheme requirements of embedded embedded parts of the main structure of the construction processFeet should be laid flat tile, and tied with wire fixed on the lower supporting steel pipe. Scaffold of the butt joint between the tile, the rest of the bearing rail spacing shall not be greater than 400~700 mm
Q: At 16 I took my bros 16 gauge piercing needle and pierced my left cartilage and it didn't hurt at all.... and I have a tattoo as well and I laughed through it. So pain isn't huge when it's a small amount.
its like 37 million times worst! its really painful [Pro-Sarcasm?]
Q: Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
sounds hott!! XD take alot of advile or novacain before you get it done, trust me it works!
Q: Im a wimp for pain and im looking to get my scaffolding done. i want to know how painful it isI already have both lobs pierced and stretched to an 8mm, will the pain be similar to that?
Depends on your pain tolerance, it's different for everyone. But generally cartilage piercings feel nothing like getting piercings stretched.
Q: I got an industrial/scaffold piercing a few months ago and currently have captive bead rings in (The piercer put those in after he pierced it). The piercings are now healed enough for me to change the piercing, and I found an industrial bar on ebay which I'd really like to order. Only problem is, it has two choices on the gauge thickness and length, and I don't know which mine is.The gauge sizes available are 1.2mm (16g) or 1.6mm (14g) , and the length options are 32mm, 35mm, 38mm.Does anyone know which would be the best to get? Thanks.
Scaffold Bar

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords