Galvanized Steel Scaffold Plank / Aluminum Deck
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m
- Supply Capability:
- 100000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
America Type Scaffolding Plank
1.Length: 5’ 6’ 7’ 8’ 9’ 10’ (1524mm 1829mm 2133mm 2438mm 2743mm 3048mm)
2. Width: 9” (228.6mm)
3. Height: 2.5” (63.5mm)
4. Thickness: 1.8mm
5.Hook thickness:6mm
We can supply all kinds of galvanized steel plank with hole and without hole ,width:210 - 240mm ,thickness:1.1- 2.0mm.
Name | Scaffolding Steel Deck |
Main Material | Q235/Q345 |
Certificate | OSHA |
Service | OEM Service available |
MOQ | one 20' container |
Payment | L/C,T/T |
Delivery Time | About 20-30 days after confirmation |
Packing | in bulk or steel pallet or as your request |
10' x 19" Aluminum Deck
Features
Description: 10' X 19' Aluminum Scaffold Walk board
Material: Aluminum 6061-T6
Finish: Anodized
Size: 19 inch wide and 10 foot in length
Weight: 39 lbs.
Loading capacity: 792lbs.
Constructed of all aluminum, this aluminum scaffold walk plank has three broad replaceable hooks
Off-set hooks allow continuous decking
Related products
Galvanized Steel Scaffold Plank / Aluminum Deck
in bulk ,pallet or as you request
- Q:What is a bowl buckle scaffold?
- The buckle type multifunctional scaffold is a new type scaffold which is developed on the basis of absorbing the advanced joint and fittings of the same type of scaffold in foreign countries and combining with the actual situation of our country.
- Q:When putting up old scaffolding, a mistake was made and it had to come down.Long story short, the connectors between the vertical and horizontal poles (which were hammered in) are stuck.Any ideas for getting them out?Thanks.
- Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
- Q:Standard Specification for bowl buckle scaffold
- The utility model has the advantages of reasonable structure, simple manufacturing process, easy operation and wide application range, and can fully meet the construction requirements of buildings, bridges and culverts, tunnels, chimneys, water towers and other buildings
- Q:Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
- 3.1.2, clearly defined the quality requirements of fasteners, so you can use fasteners
- Q:I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
- I got my lobes pierced 5 years before my industrial so I can't compare the pain but everyone says industrial. Idk if they can freeze or not. The pain is completely tolerable.
- Q:improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- Well, it seems you came close to answering your question. But are falls a scaffolding failure? For me failure means that the scaffolding sagged or fell - which may result in injuries with or without falling as when the failing scaffolding falls on a worker on the ground. I would think that major causes of failure as I defined it would be inadequate or failed attachments to the building and failure of ground support for the structure. Question needs to be improved to define what you need in answer and avoid conflict between question and detail.
- Q:i already found the force in rope 2 but im not getting the force in rope 1.
- The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
- Q:Introduction of external scaffolding
- 2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m<l = 4m4m<l = 6.5m = 12 = 206 level bar, inclined bar bending steel pipe L = 6.5m = 302) from drilling pipe.
- Q:Whats a scaffold in ac brotherhood?
- Wrong category. Post under Video and Online Games.
- Q:Cantilever scaffold technical disclosure
- Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Galvanized Steel Scaffold Plank / Aluminum Deck
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m
- Supply Capability:
- 100000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords