Scaffold Steel Plank Scaffold for Outdoor Building
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffold Steel Plank Scaffold for Outdoor Building
Product Details
Basic Info.
Model NO.:
Material:
Type:
Structural Style:
Framework:
Supporting Mode:
Lapping Form:
Erection Position:
Move Method:
Scaffolding Part Type:
Working Size:
Steel Pipe Size:
Anti-Rust Treatment:
Universal Wheel:
Package:
Net Weight:
20/40/40hq Container:
Export Markets:
Additional Info.
Trademark:
Packing:
Standard:
Origin:
HS Code:
Production Capacity:
Product Description
Working size: 95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: Galvanize zinc
Universal wheel: Optional
Shipping information:
Package: Bare product
Net weight: 92kg
Qty for 20/40/40HQ container: 230/460/570sets
Attention:
Bare product without carton
Universal wheel isn't included
.
More products:
Model | Specification | Packing info. | Note |
SD01 | Working size:95cmx185cmx170cm Steel pipe size: Dia43mm x Thickness 2.3mm Anti-rust treatment: galvanize zinc universal wheel: optional | Package: Bare product Net weight:92kg Qty for 20/40/40HQ container: 230/460/570sets | Bare product without carton Universal wheel isn't included |
SD02 | Working size:95cmx185cmx170cm Steel pipe size: Dia43mm x Thickness 2.3mm Anti-rust treatment: galvanize zinc universal wheel: optional | Package: Bare product Net weight:92kg Qty for 20/40/40HQ container: 230/460/570sets | Bare product without carton Universal wheel isn't included |
SD03 | Working size:95cmx185cmx170cm Steel pipe size: Dia43mm x Thickness 2.3mm Anti-rust treatment: galvanize zinc universal wheel: optional | Package: Bare product Net weight:92kg Qty for 20/40/40HQ container: 200/440/480sets | Bare product without carton Universal wheel isn't included |
- Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
- System, and to monitor the implementation of the situation
- Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
- scaffolding load shall not exceed 270kg / m
- Q:The obvious would be helpful too!
- Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
- Q:What is the most important safety hazard at the construction site?
- 2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
- Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
- the HOW is that if he moves 1/6 of the way to an end, then he's 1/3 of the way from that end and 2/3 of the way from the other end. The tension from the platform doesn't change, but the tension from the man on either rope is inversely proportional to his distance from either end; in other words, he's 1/3 of the way from the right end, so 2/3 of his mass goes to tension on that rope; he's 2/3 from the other end so 1/3 of his mass goes to tension on the left rope. the rest is just math!
- Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
- pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
- Q:I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
- This company is hiring that company for those who buys them for that thing, from now and then!!
- Q:How to carry out fire inspection at construction site construction site (including information and site)
- the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
- Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
- Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffold Steel Plank Scaffold for Outdoor Building
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords