Scaffold Steel Plank Scaffold for Outdoor Building
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffold Steel Plank Scaffold for Outdoor Building
Product Details
Basic Info.
Model NO.:
Material:
Type:
Structural Style:
Framework:
Supporting Mode:
Lapping Form:
Erection Position:
Move Method:
Scaffolding Part Type:
Working Size:
Steel Pipe Size:
Anti-Rust Treatment:
Universal Wheel:
Package:
Net Weight:
20/40/40hq Container:
Export Markets:
Additional Info.
Trademark:
Packing:
Standard:
Origin:
HS Code:
Production Capacity:
Product Description
Working size: 95cmx185cmx170cm
Steel pipe size: Dia43mm x Thickness 2.3mm
Anti-rust treatment: Galvanize zinc
Universal wheel: Optional
Shipping information:
Package: Bare product
Net weight: 92kg
Qty for 20/40/40HQ container: 230/460/570sets
Attention:
Bare product without carton
Universal wheel isn't included
.
More products:
Model | Specification | Packing info. | Note |
SD01 | Working size:95cmx185cmx170cm Steel pipe size: Dia43mm x Thickness 2.3mm Anti-rust treatment: galvanize zinc universal wheel: optional | Package: Bare product Net weight:92kg Qty for 20/40/40HQ container: 230/460/570sets | Bare product without carton Universal wheel isn't included |
SD02 | Working size:95cmx185cmx170cm Steel pipe size: Dia43mm x Thickness 2.3mm Anti-rust treatment: galvanize zinc universal wheel: optional | Package: Bare product Net weight:92kg Qty for 20/40/40HQ container: 230/460/570sets | Bare product without carton Universal wheel isn't included |
SD03 | Working size:95cmx185cmx170cm Steel pipe size: Dia43mm x Thickness 2.3mm Anti-rust treatment: galvanize zinc universal wheel: optional | Package: Bare product Net weight:92kg Qty for 20/40/40HQ container: 200/440/480sets | Bare product without carton Universal wheel isn't included |
- Q: Why the height increase of ten centimeters increase in housing ten percent
- Increase the cost of ten centimeters increase in housing costs by about three percent
- Q: Construction technology measures fee is directly into the sub - project costs
- Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
- Q: What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
- Template support and scaffolding are force components can be wood structure, steel structure and prefabricated concrete structure, which is classified according to their use of the general should not share the same structure, so as to avoid the operation of the construction process caused by the template shaking and affect the quality of the project The In general, the template support is through the template to bear the relevant load from the concrete; and scaffolding to bear the construction workers, equipment and construction materials and other loads
- Q: PLEASE HELP!!!!!
- maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
- Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
- At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
- Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
- Q: I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- Because you scaffolding too high pump enough, so you can only use the tow pump or car pump when the tow pump, the pump tube connected to the pouring site, with the pipe, pipe to complete the concrete pouring task
- Q: is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
- yes - she is looking down on them after years of them looking down on her because of her adultery
- Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
- The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
- Q: What is the vertical transport of construction and the high increase in fees
- The vertical transportation fee is a special item in the construction industry
Send your message to us
Scaffold Steel Plank Scaffold for Outdoor Building
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 2000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords