Galvanized Ringlock Scaffold System Q235/345 Steel Galvanized
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Product Show
The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
- Q: So, recently I've encountered problems with the amount of excrement I produce. I consulted my doctor and he said I should try Anal Scaffolding. It was fine for the first 2 weeks but recently it has collapsed, causing an retraction of my rectum. Why is this happening? Thanks.
- You need to be examined by your doctor as only an examination could determine the reason why this is happening..............
- Q: Specification for bowl scaffold support top rod length of not more than 30cm, which is the standard which page specific ah, too lazy to check out, who knows?
- Bowl-scaffold top support rod free length of not more than 30cm, this is right, really did not see the specification
- Q: I got my scaffolding piercing today, inevitably it's sore,but do i clean it like you would clean normal piercings with salt water?also how long before i can turn the bar?and how long before i can change the bar?Plus. it hurt so much haha
- WTF is a scaffolding? If it's what I hope it is you should poast a link to a pic of it....
- Q: Why is there so much unnecessary scaffolding in NYC?
- Must belong to someone's cousin. Buildings need cleaning too.
- Q: At what height do we need to erect scaffolding?
- Any height you can fall from and get hurt. I would say this would be above say 6 feet or so. Scaffolding is cheap. You can rent it around here for $14 for two weeks.
- Q: Ok, so I'm getting a industrial/scaffolding piercing tomorrow and I'm just wandering which ear I should get pierced?I sleep on my left ear;I have I side fridge that goes over my right eye.Also I know the right ear is more popular, is there a particular reason for this?Also how much pain should I be expecting?Thankksss..
- if you sleep on your left ear, then i say get it on the right ear. ive never heard of the right ear being more popular, i have mine done on my left ear. mine hurt about a 6-7/10, but pain is different for everyone
- Q: how can you tell is a scaffolding piercing is infected?
- Excessive redness extending well beyond the piercing area, hot to the touch, yellow/green pus with an odor.
- Q: Did the pageantry of pain at the scaffold actually deter people of crimes during the 18th century?
- may have deterred some. but with no real police force, I imagine the chance of being caught was actually quite low.
- Q: Well my parents are going out of state soon and I want to get a Scaffold Ear Piercing but when i take the earring off does the piecing show?
- you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
- Q: Why not connected with the bracket or arch construction scaffolding
- 2 the support column must fall on the foundation with enough bearing capacity, the bottom end of the column must be provided with a backing plate or a concrete cushion block. The foundation of the support is forbidden to be soaked by water, and the measures to prevent frost heave must be taken in winter construction.3 both sides of the support hole should be reinforced, the night should be set warning lights. In the construction of the river which is easy to be affected by drifting objects, a strong protective device should be set up.4 installation bracket and arch process, should be installed with the erection of temporary support. The multilayer bracket, horizontal plate bracket should be horizontal, vertical column should, on the lower column should be in the same center line.5 frame or not connected with the construction scaffolding and arch bridge.
Send your message to us
Galvanized Ringlock Scaffold System Q235/345 Steel Galvanized
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords