Ringlock Scaffold Q235/345 Steel Galvanized
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Product Show
The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
- Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q: What is the meaning of WDJ in the WDJ bowl buckle scaffold
- The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction.
- Q: in the safety scaffolding?
- If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.
- Q: is scaffolding a trade that i could emigrate to australia with?
- Scaffolding is not a trade listed on the Skilled Occupation List and as such you are not eligible to migrate. If you were to receive a job offer in regional Australia then you may (although very unlikely) be able to get a regional 457 visa, a temporary residence visa of up to 4 years.
- Q: To take panoramic photos? I am willing to sign a form of indemnity if they wish as it will be at my own risk.
- You can rent one of your own. Getting all the contractors, owners and subcontractors to let you sign a waver will not get you far ... in the end if you fall off, your survivors will still sue.
- Q: Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
- Among them, the proportion of steel pipe fastener scaffold is larger, and the door type scaffold is mainly used for decoration and indoor construction
- Q: I live on the second floor of an apartment building the scaffolding is all around the windows. When the men are working, they are just a few feet away! It's awful. Anyway to find out when this hideous mess will come down?
- Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
- Q: I really wanna get one, but i have questions ? i already have a reg top cartilage piercing, so do i need only one more or does it have to be higher/lower? oh and do they have to make the hole bigger for the one i already have? or just the same? thanks :)
- They can't use one of the holes you already have. Things won't line up properly and it won't heal. They will make the new hole either higher or lower, depending on how high your cartilage piercing is at the moment. I would assume they would try and make it higher, but it is about what will be best for the piercing.
- Q: Scaffolding step span, span, the vertical rod spacing is how much
- The span is the distance between two adjacent poles. The width of the scaffold is the width of the scaffold, which is the distance between two poles.
- Q: What kind body jewlery would match a scaffold piercing?
- If you mean what can you wear in your scaffold then the answer is simple. Any bar that is the correct length and shape. The best way to make sure of this is to go to your body piercer and ask them to help you order a new bar. You can also just change the ends if you're looking for a new look. If you get the wrong length and shape, you can end up ruining your piercing. Bars that are the wrong size can put pressure on the piercings and cause them to migrate, deform, form keloids, or at the least be very sore. Just pop into your piercer and order the right thing! If you mean what would match to be worn with it, not in it then just about any body jewlery will look fine.
Send your message to us
Ringlock Scaffold Q235/345 Steel Galvanized
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords