• Frame Scaffolding System-Board Hopup Bracket CNBM System 1
  • Frame Scaffolding System-Board Hopup Bracket CNBM System 2
Frame Scaffolding System-Board Hopup Bracket CNBM

Frame Scaffolding System-Board Hopup Bracket CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FS-BHB

  • Type: Scaffolding Parts, Frame scaffolding bracket

  • Scaffolding Part Type: Scaffolding bracket

  • Connect: By tube clampe

  • Material: Steel

Frame Scaffolding System-Board Hopup Bracket CNBM


Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-S

Model Name: Speedy Scaffolding System

3.Features:

1. Made of high strength steel tube
2. Including:

1) Frame: 2000/1500/1000mm(H)x732mm(W)

               1000/666mm(H)x732mm(W) with connector

2) Clamp Horizontal: 1572/2072/2572/3072mm(L)

3) Single Beam: 700/1056/1540/2040/2540/3040mm(L)

4) Double Beam: 1540/2040/2540/3040/4112mm(L)x435mm(W)

5) Brace: 2824/3209/3632mm(L) with single clamp

              4433mm(L) with double clamp

6) Safety Gate: 696mm(W)x464mm(H)

7) Steel Plank: 690/1046/1530/2030/2530/3030mm(L)x320mm(W)

8) Aluminium platform ladder: 2530/3030mm(L)x610mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement.

4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q: the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q: The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q: On the issue of compensation after the event of force majeure
It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
It is the main component form of a house
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches