Frame Scaffolding Building Materials CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Application: For house bulding
Certification: SGS
2.Packaging & Delivery
Packaging Details:
Delivery Detail:
Steel tube is packed in bundles with steel strips; coupling is packed in carbons. |
20 days after the deposit |
Durable steel scaffolding systems tube&coupling
3.Feature Details
1. Scaffolding systems tube&coupling is one of the most labor intensive scaffolding systems,but the return on time investment is nearly umlimited adaptability and access to even the most unique jobsite.
2.The normal size of scaffold tube is 5.8 meter long,diameter 48mm. It is compatible with scaffolding couplers 48.6*48.6mm or 48.3*48.3mm.
3. Scaffold tube can be joint at any angles you want with three simple components:fixed coupler,swivel coupler and sleeve coupler.
4.The steel scaffold tube are mainly used to cover the outside wall of building,adaptable to any construction situation.However,they are also suitable to support inside concrete walls.
5.The thickness of scaffold tube can be 3.2mm,3mm and 2.75mm,the surface can be black,painted or cold galvanized.
4.
Main Frame | |||||
Code | Thickness(mm) | Height(mm) | Width(mm) | Surface Treatment | |
HF1930 | 2.0/2.2 | 1930 | 1219 | HDG/Painted | |
HF1700 | 1700 | 1219 | |||
HF 1524 | 1524 | 1219 | |||
HF1709 | 1700 | 914 | |||
LF1700 | 1700 | 1219 | |||
LF1219 | 1219 | 1219 | |||
LF914 | 914 | 1219 | |||
LF1524 | 1524 | 1524 | |||
LF1930 | 1930 | 1524 |
5.What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
- Q: Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q: What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
- Q: How to carry out fire inspection at construction site construction site (including information and site)
- How to carry out fire inspection at construction site construction site (including information and site)
- Q: so im 16 and only got into piecings within like the last year...iv only got my belly done, but iv been in love the scaffold piercing for ages, but im just wondering whether it would look really odd if i got it as it would be the only ear piecing i had, opinions??(and yes if i got it done i would go to a reputable place)
- I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
- Q: - Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
- In the late 1950s, oil wells were specially developed for oil
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: Seeking construction machinery safety supervision papers can be greater than 100 words
- Seeking construction machinery safety supervision papers can be greater than 100 words
- Q: Construction technology measures fee is directly into the sub - project costs
- Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
- Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
- At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
- Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
- Oh, that love what the lay it? Concrete is the end of the concrete pumping equipment, the role is to pump the concrete through the pipeline to be poured to pour (to say that the "building" is the word is also lay it, huh, huh) components within the template
Send your message to us
Frame Scaffolding Building Materials CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords