• Facade Scaffolding System Transom double Guardrail CNBM System 1
  • Facade Scaffolding System Transom double Guardrail CNBM System 2
  • Facade Scaffolding System Transom double Guardrail CNBM System 3
Facade Scaffolding System Transom double Guardrail CNBM

Facade Scaffolding System Transom double Guardrail CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-DG

  • Type: Scaffolding Parts, Double Guardrail

  • Scaffolding Part Type: Scaffolding Transom

  • Material: Steel or Aluminium

  • Surface: Galvanized or to be ordered.

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description

  

Model No: FAS-DG

Product Name: Facade Scaffolding System--Double Guardrail

 

3.Feature:

1. Made of Φ33.7mm x 2.25mm thickness steel tube and rectangle tube,

    Length(mm): 1570/2070/2570/3070.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement.

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Facade Scaffolding System Transom double Guardrail CNBM

Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q:The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q:I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
Q:How to carry out fire inspection at construction site construction site (including information and site)
How to carry out fire inspection at construction site construction site (including information and site)
Q:What kind of insulation materials and equipment are allowed to be imported in China?
What kind of insulation materials and equipment are allowed to be imported in China?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords