Formwork butterfly wing nut
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: |
Packaging & Delivery
Packaging Detail: | Pallets, or crates, or bags |
Delivery Detail: | 20 DAYS |
Specifications
Material:iron&steel
Surface:Galvanized
Colour: White, Yellow
Quality Level: High Quality
Offer OEM service
Formwork Accessory
Name:wing nut
Material:iron&stee
l
Surface:Galvanized
Tensible strength:more than 200KN
Colour:white yellow
Weight:0.12kg-1.41kg
Quality Level:high quality
Meet custom requirements
Offer OEM service
wing nut
why should you choose us?
1.We are the biggest and most efficient manufacturer and world wide exporter of formwork and scaffolding accessories in China.
2.We have more than ten years manufacturing and exporting experience of formwork and scaffolding accessories.
3.We have extensive and comprehensive quality control system recognised world wide.
4.Your job will be in good hands as we have all round experienced staff in all our departments.
5.Our prices are very much competitive and open to negotiation.
We have the professional technology and more than ten years experience, also have the powerful manufacturing capacity and excellent quality control, equipping with the advanced Electric Furnaces, Chemical Analysis Monitors, Core Making Machine Lines, Heat Treatment Line, and also have the Tensile strength tester, Chemical analysis equipment, Metallographic equipments and so on. So our products have the excellent Tensile Strength and Elongation, the best Chemical Composition and the high-quality Appearance.
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- 1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: opinions on scaffolding piercing and how to hide it from school :)?
- While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
- Q: Can you do the outer scaffolding?
- (4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.
- Q: Find the demolishing scheme of scaffold
- Removal of scaffolding shall comply with the following requirements:11.2.1 removal operations must be carried out from top to bottom, prohibited from top to bottom operation at the same time;11.2.2 even wall pieces must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the dismantling of scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the 2 step, should be added to strengthen the wall;
- Q: What is the difference between Scaffolding and Zone of Proximal Development?
- Zpd And Scaffolding
- Q: Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
- You should keep your breathing calm so you don't freak out, haha. If you're very terrified of needles, have one of your friends hold your hand while doing it and talk to them while doing this to keep your mind off of the piercing. It should be done very quickly though, so don't work yourself up too much :)
- Q: what are two burdens for each character? What action does each character indicate that she or he is indeed free from their burdens?
- Tell me what you know and I will elaborate. I had to read this book for a class and hated it, but I won't do your homework for you. I will help if you show you read it yourself and put in some effort we can see
- Q: I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
- no its sixteen interior the united kingdom for any variety of ear piercing sixteen with out parent permssion and it will harm rather undesirable take a protracted time to heal and it will value approximately ?35-?40 and clean it with salt water.
- Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
- Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Send your message to us
Formwork butterfly wing nut
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords