Formwork butterfly wing nut 4
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: |
Packaging & Delivery
Packaging Detail: | Pallets, or crates, or bags |
Delivery Detail: | 20 DAYS |
Specifications
Material:iron&steel
Surface:Galvanized
Colour: White, Yellow
Quality Level: High Quality
Offer OEM service
Formwork Accessory
Name:wing nut
Material:iron&stee
l
Surface:Galvanized
Tensible strength:more than 200KN
Colour:white yellow
Weight:0.12kg-1.41kg
Quality Level:high quality
Meet custom requirements
Offer OEM service
wing nut
why should you choose us?
1.We are the biggest and most efficient manufacturer and world wide exporter of formwork and scaffolding accessories in China.
2.We have more than ten years manufacturing and exporting experience of formwork and scaffolding accessories.
3.We have extensive and comprehensive quality control system recognised world wide.
4.Your job will be in good hands as we have all round experienced staff in all our departments.
5.Our prices are very much competitive and open to negotiation.
We have the professional technology and more than ten years experience, also have the powerful manufacturing capacity and excellent quality control, equipping with the advanced Electric Furnaces, Chemical Analysis Monitors, Core Making Machine Lines, Heat Treatment Line, and also have the Tensile strength tester, Chemical analysis equipment, Metallographic equipments and so on. So our products have the excellent Tensile Strength and Elongation, the best Chemical Composition and the high-quality Appearance.
- Q: In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
- Our company produces cheerin card stamping steel by the National Institute of architectural design and reasonable design, set all fasteners advantages, good use, portability, beautiful appearance, the overall mechanical state. The best selection of high-quality alloy steel and accessories manufacturing, strictly ensure product consistency, quality is guaranteed. The surface treatment of zinc plating and good anti-corrosion performance. Have patience, fracture, strength, deformation, durability, good uniformity and steel, non slip effect is the best.
- Q: What are the requirements for the construction of the scaffold eye in the building?
- Optimistic, the most comprehensive!5.2.5 scaffold EngineeringA. accessories(1) selection and calculation basis of structural parts
- Q: i got my scaffold piercing 4 days ago and it still hurtsit usually doesn't hurt when nothing touches it, but then with the lightest touch of a finger or anything else, it hurts badly.i just cleaned it with h2Ocean and a q-tip and now it hurts really bad. :|should it not be hurting by now? or is this normal.? if its normal.. how long until it heals/stops hurting like a *****. hah
- When I got my ears pierced professionally, they only hurt for a couple days, maybe a week if I messed with them too much. Later, I personally double pierced my earlobes with a sterile needle at home, it's been over a month and it still occasionally hurts when I sleep on it weird. That is my experience, however it depends if they use a gun or a needle, where exactly you have it pierced, and other factors still can change (infections) the amount of healing time. But a good ballpark figure is about 1-2 weeks, but I know people who's pain can last a month. Good luck, and make sure you find a good professional piercer, and not the local mall free piercing preteen shops :).
- Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
- You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
- Q: Bracket cast-in-place beam bracket must use bowl buckle scaffold, can not use fastener type scaffolding, there is no mandatory requirements, or specification file requirements!
- No mandatory provisions.JGJ1622008 construction formwork safety technical specifications, is the latest specification
- Q: What is the meaning of the scaffold when it is set up in the concrete structure of the permanent building
- Selection of the project using 48 mm, 3.5mm wall thickness of steel pipe and the corresponding fasteners, dense mesh safety net, big eyes, such as net feet
- Q: what is the height of a scaffold if the person is 6ft tall?
- Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
- Q: Who has external scaffolding construction program
- 1.1.2 fastener1 steel tubular scaffold made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; the fastener made by other materials used, test show that the quality meets the standard requirements before use.2 fastener used in the scaffold, bolt tightening torque up to 6.5N.M, shall not be damaged.1.1.3 foot plateThe scaffold made of bamboo or bamboo bamboo string plate, each quality should not be greater than 30kg.1.1.4 wall partsThe material of the wall parts shall be in accordance with the provisions of the current national standard "Q235-A" (GB/T700).1.2 inspection of qualified parts should be classified according to the varieties, specifications, stacked neatly, smooth, stacking sites may not have water.1.3 should be cleared to set up the site debris, flat set up the site, and make water flow.1.4 when the foundation of the scaffold has equipment foundation, pipe trench, the scaffolding should not be used in the process of excavation, otherwise it is necessary to take reinforcement measures.
- Q: How to remove the disc scaffolding ah, do not know how to get through the decoration
- Third, remove the disc scaffolding accessories should pay attention to remind the construction personnel, in the construction site to fasten safety rope, take good safety helmet, wear good shoes. Don't dress because the weather is hot. Some of the equipment used to go to the mall to see where the extension is more complete.
- Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
- You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Send your message to us
Formwork butterfly wing nut 4
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords