• Flat Top Tower Crane TC 7034 for Construction System 1
  • Flat Top Tower Crane TC 7034 for Construction System 2
  • Flat Top Tower Crane TC 7034 for Construction System 3
  • Flat Top Tower Crane TC 7034 for Construction System 4
Flat Top Tower Crane TC 7034 for Construction

Flat Top Tower Crane TC 7034 for Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
20 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Description of our Tower Crane

1, TC4808 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.25 to 48m, TC4808 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of Tower Crane

Max. lifting capacity

t

6

Working range

m

3-56

Lifting Height

Independent

40.2

Adhered

151.2

Lifting speed

Double magnification

m/min

80/40

Quadruple magnification

38/19

Slewing speed

r/min

0.637

Trolleying speed

m/min

44/22

Climbing speed

0.4

Min. stable descending speed

<7< span="">

Overall dimensions

Foundation frame

m

8×8

Overall height

Independent

50.892

Adhered

160.892

Jib end to the swiveling center

56.17

Balance tip to swiveling center

12.39

Total weight

Structure weight

Independent

t

40.49

Adhered

80.87

counterweight

18.34

Total motor capacity

kW

41.52

Allowed operating temperature

C

-20-+40

Power supply parameters

50Hz

-380V±10%

 

 Flat Top Tower Crane TC 7034 for ConstructionFlat Top Tower Crane TC 7034 for Construction

 

Q: A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
Q: Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q: I understand the Crane stances and know there are more than one. I am referring to the single leg crane stance. I also know that stances are only used briefly. But I am curious, does this stance have any bunkai applications? Or is it only useful against dodging a kick or preparing to kick?
Great question. This is one of those stances that I believe can be more static in nature. I think this stance, as Kokoro points out, is a great example of a lying-on-the-floor technique without actually having to lie on the floor. There are 3 kinds of crane stances, that I'me aware of: 1) the left foot is placed behind the right knee and the left foot's shin is perpendicular to the floor 2) the left foot is placed next to right knee and the left foot's shin is perpendicular to the floor 3) the left foot is placed next to right knee and the left foot's shin is ANGLED (sticks out to the left) to the floor in method 1), the application can represent a bind, hook, or pull toward you, of opponet's knee/shin while standing or lying down. in method 2), the there are a couple of applications: 2a) it is a on-the-floor position where you are mounted; your knee up represents keeping the distance open between you and opponent. 2b) it is a chamber of sorts to a jumping front snap kick (some call this a crane kick, which was a question that was asked about this a day or two ago) - and Shadam mentions this again in this question 2c) it is a check or block of a kick or weapon, as Liondancer mentions. in method 3), the application represents that your opponent is kicked to the inside of the knee: either to disable or to sweep.
Q: What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
Q: Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
Q: The role of slewing limiter in tower cranes is limited
The crane or winch motor winding rope arranged on the roller loose, hoisting large demolition, resulting in the large load fast rope rope cut into bundles, causing fast rope severe jitter, vulnerable to instability, the results often appear to work and stop dangerous, can not stop the embarrassing situation.
Q: I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
First, okorder /. This means that at 5 m the capacity is 600 tonnes. Double the radius, half the capacity. A crane located at the foot of the pyramid, will be at 115.2 m from the center. At that radius, the crane could only lift 26 tonnes, so this crane could not lift the greatest stones weighing 80 tonnes. Being the boom only 100m it could'nt even reach the center.
Q: What is tower crane? What are the types and features?
[classification and characteristics]Tower crane is divided into two categories: upper slewing tower and lower slewing tower crane. Among them, the bearing capacity of the former is higher than that of the latter. In many construction sites, what we have seen is the tower crane with rotary top, top lift and knot joint.
Q: My hubby just passed his crane test yesterday, and I was wondering how much they pay? He was told to ask for 50k a year..that includes crane time where he works. Can we really ask that? He sets trusses for a big lumber company in Missoula Mt. Any help would be great.
Huh, I thought crane ops got paid by the tonnage they lift. Maybe there is a base pay in addition to it. But to answer your question, I don't know.
Q: Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163 Http://www.cqybjs (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords